Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 References  





2 External links  














Condor Cliff Dam






Čeština
فارسی
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 50°1241.67S 70°4630.29W / 50.2115750°S 70.7750806°W / -50.2115750; -70.7750806
 

From Wikipedia, the free encyclopedia
 


Néstor Kirchner Dam
Condor Cliff Dam is located in Argentina
Condor Cliff Dam

Location of Néstor Kirchner Dam in Argentina

CountryArgentina
LocationPuerto Santa Cruz, Santa Cruz Province
Coordinates50°12′41.67″S 70°46′30.29″W / 50.2115750°S 70.7750806°W / -50.2115750; -70.7750806
PurposePower
Statusconstruction on hold
Construction beganJuly 2015
Dam and spillways
Type of damEmbankment, concrete-face rock-fill
ImpoundsSanta Cruz River
Height75.5 m (248 ft)
Length2,780 m (9,120 ft)
Dam volume14,100,000 m3 (18,400,000 cu yd)
Reservoir
Total capacity6,260×10^6 m3 (5,080,000 acre⋅ft)
Surface area275 km2 (106 sq mi)
Hydraulic head64.47 m (211.5 ft)
Turbines6 x 190 MW (250,000 hp) Francis-type
Installed capacity1,140 MW (1,530,000 hp)
Annual generation3,380 GWh (12,200 TJ) (estimated)

The Néstor Kirchner Dam, formerly known as Condor Cliff Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 180 km (110 mi) west of Puerto Santa CruzinSanta Cruz Province, Argentina. It was renamed after the former president Néstor Kirchner, born in Santa Cruz. A consortium led by China's Gezhouba Group was awarded the contract to build the Néstor Kirchner Dam and Jorge Cepernic Dam downstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion.[1] The dam is being built by Eling Ingeniería, the successor of Electroingeniería of Osvaldo Acosta and Gerardo Ferreyra.[2] The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 1,140 megawatts (1,530,000 hp).[3]

In July 2015 machines arrived in Santa Cruz for the construction of the dams.[4]

In December 2016 Supreme Court of Argentina decided to suspend work on the dam.[5]

In December 2023 construction was stopped awaiting funding from China.[6]

References

[edit]
  1. ^ "China will build and finance two dams in Patagonia equivalent to 10% of Argentine power demand". 22 August 2013. Retrieved 28 April 2014.
  • ^ Represas Kirchner y Cepernic | La última gran joya de los reyes de la obra pública Archived 2014-04-28 at the Wayback Machine (in Spanish)
  • ^ "Hydroelectric Projects in the Santa Cruz River" (PDF). Water and Energy National and Regional Integration. Government of Argentina. p. 95. Archived from the original (PDF) on 29 April 2014. Retrieved 28 April 2014.
  • ^ Ministerio de Planificación - Arribaron máquinas para las Represas Kirchner-Cepernic [web.archive.org]
  • ^ "New Hope for Patagonian River: Dams in Argentina Suspended".
  • ^ Diamante, Sofía (7 February 2024). "La construcción de las represas de Santa Cruz está frenada desde diciembre a la espera del financiamiento de China". LA NACION. Retrieved 8 February 2024.
  • [edit]

  • iconWater portal
  • iconRenewable energy portal

  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Condor_Cliff_Dam&oldid=1204804363"

    Categories: 
    Dams in Argentina
    Buildings and structures in Santa Cruz Province, Argentina
    Buildings and structures under construction in Argentina
    Dams under construction
    Hydroelectric power stations in Argentina
    Concrete-face rock-fill dams
    Argentine building and structure stubs
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Webarchive template wayback links
    Articles with Spanish-language sources (es)
    Articles with short description
    Short description matches Wikidata
    Coordinates on Wikidata
    All stub articles
     



    This page was last edited on 8 February 2024, at 01:40 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki