Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Route description  



1.1  Ohio  





1.2  West Virginia  







2 History  



2.1  West Virginia  



2.1.1  Completion into Ohio  









3 Notes  





4 See also  





5 References  





6 External links  














Corridor D







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Corridor D

Major junctions
West end I-275 near Cincinnati, OH
Major intersections US 23/Corr. C near Piketon, OH
I-77 near Parkersburg, WV
East end I-79 near Clarksburg, WV
Location
CountryUnited States
Highway system
  • Ohio State Highway System

In the United States, Corridor D is part of the Appalachian Development Highway System. In Ohio, it follows State Route 32 from the eastern Cincinnati suburbs until a point west of Albany, where it becomes concurrent with U.S. Route 50. After crossing into West Virginia, it follows U.S. Route 50 until the Interstate 79 interchange in Clarksburg.

The West Virginia portion was constructed during 1967–1977, and the Ohio portion during 2000–2008. ADHS Funding is separate from other Federal Highway funds.

Route description

[edit]

Ohio

[edit]

Corridor D begins at the western edge of the Appalachian Regional Commission area at the Hamilton CountyClermont County border east of Cincinnati. It intersects Interstate 275, Cincinnati's beltway, and then U.S. Route 68 and U.S. Route 62 as it crosses the Ohio glacial till plain.

Corridor D enters the Allegheny Plateau east of Peebles, crossing the Portage Escarpment near the summit of Tener Mountain before descending into the Scioto River valley and intersecting U.S. Route 23 (Corridor C). After about 25 miles (40 km) it passes through Jackson, where it is intersected by U.S. Route 35. After another 20 miles (32 km) it converges with U.S. Route 50; the two routes are concurrent for the remainder of the segment through Ohio.

It reaches Athens after traveling northeastward for about 12 miles (19 km). It then travels southeast for about 15 miles (24 km) roughly paralleling the Hocking River, and then 15 miles (24 km) northeast as it approaches the Ohio River. The highway crosses the Ohio River on the Blennerhassett Island Bridge just west of Belpre.

West Virginia

[edit]

Corridor D crosses the Little Kanawha River and interchanges with Interstate 77 near Parkersburg shortly after entering West Virginia. It continues to ascend the Allegheny Plateau through rugged terrain. In Clarksburg, it crosses the West Fork River and ends at the Interstate 79 interchange, with U.S. Route 50 continuing eastward as a two-lane mountain road.

History

[edit]
Blennerhassett Island Bridge near Parkersburg, WV.
Corridor D ramp marker in Parkersburg, West Virginia showing the symbol WVDOH uses for Appalachian Corridor mile and ramp markers.

One of the original 23 corridors, Corridor D (U.S. Highway 50) was to provide access to major urban centers along the east coast from the midwest, while creating economic development for northwest and North-Central West Virginia and southeast Ohio.

The Blennerhassett Island Bridge, a tied-arch bridge, opened to traffic on June 13, 2008, over the Ohio River thus completing Corridor D in its entirety.

West Virginia

[edit]

The earliest segment of Corridor D, or US 50, to open in West Virginia was a six-mile (10 km) segment in 1967 [1] from an isolated point near SherwoodinDoddridge County (MP 15) to WV 23inSaleminHarrison County (MP 1.52). Two years later, a segment from Salem east to CR 11 at Wolf Summit (MP 7) opened to traffic.

In 1970, major portions of Corridor D opened to traffic:[1]

  1. A brief segment in Wood County from MP 8 to MP 11 near Murphytown.
  2. A lengthy segment in Wood County from WV 31 near Deerwalk (MP 15.41) to MP 4 at Nutter FarminRitchie County near North Bend State Park, a distance of seven miles (11 km).
  3. A segment of US 50 in Ritchie County at WV 74atPennsboro (MP 17) east to Doddridge County at West Union (MP 5.5).

Most of Corridor D opened a year later.[1]

  1. A segment four-lane upgrade of US 50 opened in Wood County from Interstate 77 east of Parkersburg (MP 4) to MP 8 near Murphytown.
  2. A segment within Wood County from MP 11 near Murphytown to Sandhill (MP 15.41). This connected the disjointed segments between #1 and #2 listed above.
  3. The majority of Ritchie County's US 50 segment opened from MP 4 near North Bend State Park to WV 74atPennsboro (MP 17). This connected the disjointed segments between #2 and #3 listed above.
  4. A segment in Doddridge County from MP 5.52 near West Union east to WV 23 near Salem (MP 15).

In 1974,[1] a segment of Corridor D in Harrison County opened to traffic from CR 11 at Wolf Summit (MP 7) to the CR 11 at Wilsonburg (MP 11). In 1977, this was extended eastward to WV 20atMontpelier east of Clarksburg (MP 15.5), and a year later, to Interstate 79 west of Bridgeport (MP 18.25).

Completion into Ohio

[edit]

Construction began in 2000 with the start of the Godbey Fields complex in Parkersburg, West Virginia. The $6.5 million 40-acre (160,000 m2) athletic complex was finished in 2001.[2] Several contracts were let soon after, which included grading and drainage for part of Corridor D, a new Corning Glass Bridge for WV 47, and another span that would carry US 50 over WV 47 and 7th Street in Parkersburg.[3]

On September 8, 2003, the first segment of Corridor D opened. The 1.9-mile (3.1 km) four-lane controlled-access highway stretched from Interstate 77toWV 47 in Parkersburg.[4]

On September 20, 2004, the second portion of Corridor D opened from WV 47toWV 14, which included the construction of a Little Kanawha River crossing. With this segment open to traffic, 1/3 of the Parkersburg Corridor D segment was complete.[5]

On March 9, 2005, a tied arch Ohio River crossing design was chosen from four designs as it was the "most economical and least intrusive on the environment of Blennerhassett Island. The $120 million eight-span bridge will include an 880-foot (270 m) tied arch over the main channel of the Ohio River and will stretch for 4,009 feet (1,222 m) from both abutments with a 69 feet (21 m) vertical clearance. It is being constructed from weathering steel and will connect WV 892toOH 618. At the time of its contract letting in April 2005, it was the largest single highway contract in West Virginia's history. The bridge is expected to be complete in 2007.[6][7]

On July 12, 2005, it was announced that the final Corridor D contract in West Virginia was to be awarded. This would complete paving and signing operations of 1.32 miles (2.12 km) from the WV 892, WV 95, and WV 68 interchange to River Hill Road. In Ohio, a single contract was announced that would connect the Ohio River span to U.S. Route 50 which would be completed in 2007.[8]

In August 2005, Corridor D was opened to traffic from WV 14toWV 68.[8]

In mid-September 2005, Corridor D was completed from Fifth Street in Parkersburg to WV 892, WV 95, and WV 68. This segment was constructed under five contracts and required the completion of ten bridges.[9]

As of April 23, 2006, construction on the Corridor D mainlines from Interstate 77toWV 892 is all but complete. The last segment, from WV 892 to the WV 892, WV 95, and WV 68 interchange, was slated to open in August.[10]

On August 31, 2006, it was announced that from WV 892/WV 68 to the WV 892 interchange, Corridor D was open to traffic.[11] This 1.32-mile (2.12 km) four-lane divided freeway is the final roadway section of the corridor from Clarksburg and Cincinnati without the Ohio River crossing.

The last Corridor D project, the Blennerhasset Bridge crossing the Ohio River, was opened on June 13, 2008.

There are long-range plans to expand the diamond interchange at Interstate 77 into a fully directional interchange at a cost of $60 million. It is ranked 75th.[12]

Notes

[edit]

See also

[edit]

References

[edit]
  1. ^ a b c d "Release Date Report". West Virginia Department of Transportation. August 2003.
  • ^ "New Godbey Fields under construction". West Virginia Department of Highways. April 25, 2000. Archived from the original on March 21, 2006. Retrieved August 25, 2013.
  • ^ "DOH Corridor D Briefing Set for October 25". West Virginia Department of Highways. October 19, 2000. Archived from the original on March 21, 2006. Retrieved August 25, 2013.
  • ^ "DOH to Open 1.9-Mile Segment of Corridor D". West Virginia Department of Highways. August 25, 2003. Archived from the original on July 6, 2008. Retrieved August 25, 2013.
  • ^ "Division Street of Corridor D Set to Open". West Virginia Department of Highways. September 15, 2004. Archived from the original on July 6, 2008. Retrieved August 25, 2013.
  • ^ "Island bridge bids opening March 1". West Virginia Department of Highways. March 28, 2005. Archived from the original on July 6, 2008. Retrieved August 25, 2013.
  • ^ Payne Jr., Dave (April 2005). "W.Va awards bridge contract". West Virginia Department of Highways. Archived from the original on July 6, 2008. Retrieved August 25, 2013.
  • ^ a b Bevins, Evan (May 2005). "Final Corridor D contract to be bid". West Virginia Department of Highways. Archived from the original on July 6, 2008. Retrieved August 25, 2013.
  • ^ Payne Jr., Dave (October 6, 2005). "New section of Corridor D to open next week". West Virginia Department of Highways. Archived from the original on July 6, 2008.
  • ^ Brown, William (April 23, 2006). "Corridor D continues to progress". West Virginia Department of Highways. Archived from the original on July 6, 2008. Retrieved August 26, 2013.
  • ^ "DOH to Open Final Roadway Section of Corridor D". West Virginia Department of Transportation. October 26, 2006. Archived from the original on September 26, 2007. Retrieved August 15, 2013.
  • ^ "Priority Average Composite Sheet1"[permanent dead link]. (spreadsheet XLS). West Virginia Department of Transportation. November 1, 2006.[dead link]
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Corridor_D&oldid=1217306239"

    Categories: 
    Appalachian Development Highway System
    Northwestern Turnpike
    Roads in Ohio
    Roads in Cincinnati
    Roads in West Virginia
    U.S. Route 50
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from November 2016
    Articles with permanently dead external links
    Articles with dead external links from August 2013
    Articles with short description
    Short description is different from Wikidata
    Articles needing additional references from August 2013
    All articles needing additional references
    Use mdy dates from August 2013
    Articles using infobox templates with no data rows
    Infobox road maps tracking category
    Infobox road instances in the United States
     



    This page was last edited on 5 April 2024, at 01:39 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki