Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Description  





2 History  





3 References  





4 External links  














Crystal Dam






Cebuano
Deutsch
Français
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 38°3038.48N 107°3730.60W / 38.5106889°N 107.6251667°W / 38.5106889; -107.6251667
 

From Wikipedia, the free encyclopedia
 


Crystal Dam
Crystal Dam with overflowing spillway
Crystal Dam is located in Colorado
Crystal Dam

Location of Crystal Dam in Colorado

LocationCimarron, Gunnison County, Colorado, USA
Coordinates38°30′38.48″N 107°37′30.60″W / 38.5106889°N 107.6251667°W / 38.5106889; -107.6251667
Construction began1972
Opening date1977
Operator(s)U.S. Bureau of Reclamation
Dam and spillways
Type of damConcrete thin arch
ImpoundsGunnison River
Height323 feet (98 m)
Length620 feet (190 m)
Width (crest)10 feet (3.0 m)
Width (base)29 feet (8.8 m)
Dam volume154,400 cu yd (118,000 m3)
Spillway typeUngated ogee-crest to plunge pool
Reservoir
CreatesCrystal Reservoir
Total capacity26,000 acre-feet (0.032 km3)
Catchment area3,970 sq mi (10,300 km2)
Surface area301 acres (122 ha)
Power Station
Hydraulic head209 ft (64 m)
Turbines1 x 31.57 MW Francis turbine
Installed capacity31.5 MW
Annual generation137,950,098 KWh

Crystal Dam is a 323-foot-tall (98 m), double-curvature, concrete, thin arch dam located 6 miles downstream from Morrow Point Dam on the Gunnison RiverinColorado, United States. Crystal Dam is the newest of the three dams in Curecanti National Recreation Area; construction on the dam was finished in 1976. The dam impounds Crystal Reservoir. Crystal Dam and Reservoir are part of the Bureau of Reclamation's Wayne N. Aspinall Unit of the Colorado River Storage Project, which retains the waters of the Gunnison River and its tributaries for agricultural and municipal use in the American Southwest.[1][2] The dam's primary purpose is hydroelectric power generation.[3]

Description[edit]

Crystal Dam, like the higher Morrow Point Dam farther upstream, is a thin-shell arch dam, primarily planned to generate hydroelectric power. Unlike its upstream companions, excess water spills over the top of the dam through a notched-out, ungated spillway that can create a 227-foot (69 m) waterfall in times of overflow. Under normal conditions the river flows through an 11.5 feet (3.5 m) diameter penstock to the 28 MW turbine. The dam is deep within the Black Canyon of the Gunnison in pre-Cambrian metamorphic rock.[4]

History[edit]

A Francis-type turbine removed in 1989 from Crystal Dam Powerplant is currently displayed at Glen Canyon Dam.

Crystal Dam was the last of the three dams in the Aspinall Unit of the Colorado River Storage Project to be completed. Crystal Dam's design and construction lagged behind Morrow Point and Blue Mesa dams. Construction started in 1964 on a materials borrow pit, with construction at the damsite beginning in 1965 for an access road and exploratory drilling. Work then stopped for five years. Initially planned as an earth-fill dam, the design was changed to a double-curvature, thin-shell concrete arch dam. After an initial bidding process in which all bid were rejected as too high, a contract for the diversion tunnel was awarded in 1972, which was holed through the same year. The construction contract for the dam itself was awarded to the J.F. Shea Company in June 1973. Cofferdam work continued into 1974, encountering problems with leakage though the upstream cofferdam; 24-inch (61 cm) wells were drilled below the cofferdam to intercept water. In the meantime, the dam foundation was excavated, with first concrete placement in June. Excavation and concrete work for the powerplant started the same year. Concrete work stopped in November, and resumed in April 1975. Work was behind schedule; the dam was supposed to be completed by December 1975. Concrete work resumed in April 1976, with final completion of the dam structure on August 30, 1976. Filling operations in the reservoir began on March 14, 1977, permanently blocking the diversion tunnel on April 12. The powerplant was not completed until 1978, the victim of a fire in the contractor's warehouse that destroyed many electrical components intended for the plant.[5]

Because of Crystal Dam's then-new design, and as a result of the failure of the contemporary Teton Dam in 1976, Crystal Dam was inspected in 1978 by divers to verify the integrity of the structure.[5]

References[edit]

  1. ^ "Colorado River Storage Project". U.S. Bureau of Reclamation. Archived from the original on 3 March 2012. Retrieved 11 May 2011.
  • ^ "Crystal Dam". U.S. Bureau of Reclamation. Archived from the original on 3 March 2012. Retrieved 11 May 2011.
  • ^ "Wayne N. Aspinall Storage Unit". Curecanti National Recreation Area. National Park Service. Retrieved 11 May 2011.
  • ^ "Crystal Dam". U.S. Bureau of Reclamation. Archived from the original on 12 November 2011. Retrieved 16 May 2011.
  • ^ a b Redmond, Zachary. "Wayne Aspinall Unit" (PDF). U.S. Bureau of Reclamation. Archived from the original (PDF) on 8 August 2011. Retrieved 11 May 2011.
  • External links[edit]

  • iconWater portal
  • iconRenewable energy portal

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Crystal_Dam&oldid=1176727109"

    Categories: 
    Dams in Colorado
    Buildings and structures in Montrose County, Colorado
    Arch dams
    United States Bureau of Reclamation dams
    Hydroelectric power plants in Colorado
    Colorado River Storage Project
    Curecanti National Recreation Area
    Dams completed in 1977
    Energy infrastructure completed in 1977
    Dams on the Gunnison River
    1977 establishments in Colorado
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Coordinates on Wikidata
    Webarchive template wayback links
    Articles with Structurae structure identifiers
     



    This page was last edited on 23 September 2023, at 16:28 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki