Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Planning  





1.2  Funding and construction  





1.3  Start of service  





1.4  Future  







2 Stations  





3 Rolling stock  





4 See also  





5 References  





6 External links  














eBART







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Route map: 


From Wikipedia, the free encyclopedia
 


eBART
A railcar on a rail line in the median of a highway
Stadler GTW near Pittsburg Center station, May 2018
Overview
Other name(s)East Contra Costa County BART extension
OwnerBay Area Rapid Transit District
LocaleEast Contra Costa County
Termini
  • Pittsburg/Bay Point
  • Stations3
    WebsiteOfficial website Edit this at Wikidata
    Service
    TypeHybrid rail
    SystemBay Area Rapid Transit
    Services1
    Depot(s)Antioch Maintenance Yard
    Rolling stock8Stadler GTW
    Daily ridership4,100 (weekdays, Q1 2024)[1]
    Ridership1,292,200 (2023)[2]
    History
    OpenedMay 26, 2018; 6 years ago (2018-05-26)[3]
    Technical
    Line length9.1 miles (14.6 km)[4]
    Number of tracks2
    CharacterGrade separatedinhighway median
    Track gauge4 ft 8+12 in (1,435 mm) standard gauge
    Operating speed75 mph (121 km/h)[5]

    Route map

    Map eBART highlighted in yellow


    potential future extension

    Maintenance Yard

    Antioch

    Pittsburg Center

    Pittsburg/​Bay Point enlarge…


    Handicapped/disabled access All stations are accessible
    Parking All stations have parking
  • talk
  • edit
  • eBART (East Contra Costa County BART extension)[6][7] is a hybrid rail (light rail with some features similar to commuter rail) branch line of the Bay Area Rapid Transit (BART) system in eastern Contra Costa County, California, United States. The line extends the Yellow Line beyond Pittsburg/Bay Point stationtoAntioch station.

    The eBART system is separate from and incompatible with the main BART rapid transit system.[8] Passengers make a cross-platform transfer at an auxiliary island platform 0.6 miles east of Pittsburg/Bay Point station. From this platform, the extension proceeds 9.1 miles (14.6 km)[4] east in the State Route 4 median to the city of Antioch[9] at a Hillcrest Avenue station. The American Public Transportation Association classifies the service as commuter rail.[10]

    The BART map treats this service and the service using standard BART trains as a single line, dubbed the Yellow Line.

    History

    [edit]

    Planning

    [edit]

    Initial plans had trains running on the Union Pacific Railroad right-of-way that runs parallel to State Route 4. After Union Pacific declined to grant trackage rights or allow laying of new tracks, the line was merged with a construction project already in the process of widening the adjacent freeway, by laying tracks in its median.[11] Construction of the Railroad Avenue stationinPittsburg had been uncertain as planning and construction progressed but was fully funded by the city to open with the rest of the extension.[12]

    Ridership was initially projected at 5600 entrances and exits per weekday[13] (supposing an opening date of 2015).

    Funding and construction

    [edit]
    Transfer platform under construction in 2018

    Asales tax increase was approved by Contra Costa voters in 2004 in order to fund the expansion.[14] The expansion was approved by the BART board in April 2009.[15] Costs were set at $463 million (equivalent to $658 million in 2023), compared to an estimated $1.2 billion (equivalent to $1.7 billion in 2023) for full BART buildout.[9] On October 14, 2010, BART issued a press release announcing that the agency had awarded a $26 million (equivalent to $36.3 million in 2023) contract to West Bay Builders, of Novato, "to build the transfer platform and make some of the necessary rail improvements to begin extending the line to a terminus station at Hillcrest Avenue in Antioch."[16]

    Construction on the line began in early 2011.[7] Funding for the Pittsburg station was secured in early 2015, and the station opened with the commencement of operations.[12]

    Start of service

    [edit]

    Revenue service began on May 26, 2018.[3] The new stations reached 7,441 daily customer entrances and exits within the first three workdays, while ridership and parking levels at the previous terminal, Pittsburg/Bay Point, declined.[13] Its design and operation, the result of several compromises, were criticized by Streetsblog.[17]

    Future

    [edit]

    While not fully planned or funded as of 2018, further expansion of the line could bring eBART service to Oakley, Byron,[11][18] or the Brentwood Transit Center in Brentwood.[19] In 2017, the San Joaquin Regional Rail Commission indicated that eBART could be extended to Tracy, where it would connect with the Altamont Corridor Express and the proposed Valley Link line.[20]

    Stations

    [edit]
    Test DMU leaving Pittsburg Center station in the median of Highway 4 at sunset heading east to the Hillcrest Avenue, Antioch terminus

    All eBART stations are in Contra Costa County.

    Station City Opened Other BART lines
    Antioch Antioch May 26, 2018
    Pittsburg Center Pittsburg
    Pittsburg/​Bay Point December 7, 1996  Y  Yellow Line

    Rolling stock

    [edit]

    Trains servicing the line include eight Stadler GTW coupled pairs. The first were delivered in June 2016,[5] and the agency has two options to procure six more sets.[21] The Stadler GTW trains are diesel multiple units with 2/6 articulated power units, and are based on models previously used in Austin (Capital MetroRail), Denton (A-train), and New Jersey (River Line).[8][22]

    See also

    [edit]

    References

    [edit]
    1. ^ "Transit Ridership Report First Quarter 2024" (PDF). American Public Transportation Association. May 23, 2024. Retrieved May 31, 2024.
  • ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved March 14, 2024.
  • ^ a b "East Contra Costa BART Extension (eBART)". BART. Retrieved April 25, 2018.
  • ^ a b "BART System Facts". San Francisco Bay Area Rapid Transit District. Retrieved February 23, 2023.
  • ^ a b COETSEE, ROWENA (June 30, 2017). "Local pols get sneak peek at eBART train". The Mercury News. Retrieved November 25, 2016.
  • ^ Roth, Rob. "BART unveils diesel-powered eBART Antioch extension". KTVU. Archived from the original on October 11, 2016. Retrieved October 18, 2016.
  • ^ a b "East Contra Costa BART Extension (eBART)". Bay Area Rapid Transit (BART). April 3, 2013. Retrieved August 12, 2015.
  • ^ a b "Stadler awarded eBART train contract". Railway Gazette. DVV Media UK. April 28, 2014. Archived from the original on November 20, 2015. Retrieved November 18, 2015.
  • ^ a b Padilla, Dave (September 18, 2012). "BART Official Says eBART Rail Project Set To Open In 2016". KCBS SF Bay Area. Retrieved May 27, 2016.
  • ^ "APTA Q3 Ridership Report" (PDF). American Public Transportation Association. Archived from the original (PDF) on February 2, 2019. Retrieved March 7, 2019.
  • ^ a b Szymanski, Kyle. "eBART extension to Brentwood still a distant idea". The Press. Brentwood, California: Brentwood Press & Publishing. Retrieved May 27, 2016.
  • ^ a b Gartrell, Nate (January 22, 2015). "Pittsburg secures last piece of funding for eBART, expect new station in 2018". Contra Costa Times. Digital First Media. Archived from the original on March 5, 2016. Retrieved November 18, 2015.
  • ^ a b Brekke, Dan (June 1, 2018). "BART's New Antioch Station Is Very Popular -- and Doesn't Have Enough Parking". KQED. Retrieved June 2, 2018.
  • ^ Guevarra, Ericka Cruz (November 12, 2015). "Officials to Celebrate BART's Eastward Expansion in Contra Costa County". KQED. Retrieved May 27, 2016.
  • ^ "BART moves forward with $1 billion in extension projects". Bay Area Rapid Transit (BART). April 27, 2009. Retrieved July 15, 2014.
  • ^ "BART Board approves contract on Eastern Contra Costa County extension". Bay Area Rapid Transit (BART). October 14, 2010. Retrieved July 15, 2014.
  • ^ "Editorial: Impressions of BART's New Line to Antioch". Streetsblog San Francisco. June 6, 2018. Retrieved February 14, 2021.
  • ^ CDM Smith. "eBART Next Segment Study" (PDF). Bay Area Rapid Transit (BART). Retrieved January 19, 2016.
  • ^ "BART: Board vote brings commuter rail closer to Brentwood". The Mercury News. May 12, 2017. Retrieved May 15, 2017.
  • ^ "Altamont DMU Study: March 2017" (PDF). San Joaquin Regional Rail Commission. March 8, 2017. p. 3.
  • ^ "East Contra Costa BART Extension (eBART) Implementation". Bay Area Rapid Transit (BART). May 19, 2015. Retrieved August 9, 2015.
  • ^ "Stadler Rail delivers trains to Oakland". Stadler Rail. April 26, 2014. Archived from the original on March 4, 2016. Retrieved August 9, 2015.
  • [edit]
    KML is from Wikidata
  • icon Trains
  • icon Transport

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=EBART&oldid=1227884975"

    Categories: 
    Bay Area Rapid Transit
    Antioch, California
    Bay Point, California
    Brentwood, California
    California railroads
    Light rail in California
    Pittsburg, California
    Public transportation in the San Francisco Bay Area
    Railway lines in highway medians
    Railway lines opened in 2018
    Standard gauge railways in the United States
    Transportation in Contra Costa County, California
    Railway branch lines
    2018 establishments in California
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Use American English from April 2024
    All Wikipedia articles written in American English
    Use mdy dates from April 2024
    Articles to be expanded from January 2018
    All articles to be expanded
    Articles using small message boxes
    Articles containing potentially dated statements from 2018
    All articles containing potentially dated statements
    Commons category link from Wikidata
    Pages using gadget WikiMiniAtlas
    Articles using KML from Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 8 June 2024, at 09:28 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki