Eastham Oil Terminal







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 53°1845.16N 2°5649.96W / 53.3125444°N 2.9472111°W / 53.3125444; -2.9472111
 

From Wikipedia, the free encyclopedia
 


Eastham Oil Terminal.

Eastham Oil Terminal is situated close to the small town of Eastham on the Wirral Peninsula, beside the Manchester Ship Canal. It was commissioned in 1954 close to the Queen Elizabeth II Dock and is a storage and export facility for oil products refined at Stanlow Refinery,[1] to which it is connected by pipeline.[2] The site is currently operated by Nynas.[3]

History

[edit]

Construction of the Eastham oil terminal began in 1949 in association with the Queen Elizabeth II Dock.[4] These facilities were built near Eastham locks at entrance of the Manchester Ship Canal on the River Mersey. The new facilities at Eastham provided berthing for large tankers unable to access the ship canal. Pipelines were constructed from Stanlow Oil Refinery to the oil terminal and the dock. The construction cost of the terminal £7 million.[5] The facilities became operational in 1954.

Tanker sizes increased rapidly during the 1950s, and as early as 1960 it was recognised that the Eastham terminal was limited as the water there was not deep enough for the 65,000 ton tankers that were then becoming commonplace.[5] This led to the construction of the Tranmere oil terminal further downstream from where crude oil feedstock for Stanlow refinery is offloaded.

Other facilities

[edit]

Other companies built processing and storage facilities at Eastham. Paktank built a bulk liquid tank farm (53°18'51.5"N 2°57'11.2"W) to the west of the oil terminal.[6] In 1975 Tate & Lyle had a 50% stake in the terminal.[6] The terminal was later owned and operated by NuStar Terminals Eastham Limited. In 2018 Inter Terminals acquired NuStar's European storage terminal business.[7] This facility is currently (2020) operated by Inter Terminals. There are 157 tanks with a total storage capacity of 325,198 m3. There are four jetties for vessels and the terminal receives from, and delivers to, sea and road.[8]

In 2015 there was a proposal by Hydrodec Re-refining (UK) Limited to construct a hazardous waste recovery facility at Power House Road, Eastham comprising a waste oil re-refining plant together with associated development.[9][10] This has not been developed.

Eastham refinery

[edit]

A small refinery, Eastham Refinery Ltd., was constructed at Eastham in 1966 to the east of the tank farm.[11] This was a joint venture between Tarmac Ltd. and Phillips Petroleum of America (Phillips 66) and traded under the name of Philmac Oil Ltd. The refinery took heavy naphthenic crude as a feedstock and produced bitumen and other distillate products such as gas oil, marine diesel, lubricating base stocks.[11] The throughput in the 1970s was 400,000 tonnes per year.[12]

In 1989 the unit was expanded to provide a capacity of 1.2 million tonnes per year.[11] Eastham refinery was later operated by Briggs Oil in a joint venture with Shell.[13] Briggs Oil was acquired by the Swedish firm AB Nynas Petroleum in 1992 for £70 million; Shell retained its interest in the plant. In 1992 the refinery comprised a vacuum distillation unit with a capacity of 10,500 barrels/day (1,669 m3/day) producing 8,000 barrels/day (1272 m3/day) of asphalt.[14]

The Energy Institute noted that the refinery closed in 2010.[15] However, Eastham Refinery Ltd still operated a bitumen plant in 2017.[16] The plant produces bitumen by a 2-stage distillation process using crude oil and refinery residues as feedstock.[16] Crude oil is received by pipeline from the nearby Tranmere terminal and the residues by pipeline from the Queen Elizabeth II dock. The raw materials and product are stored in a tank farm on the site. In 2015 the plant processed 978,472 tonnes of feedstock oil. The plant uses a combination of an atmospheric distillation column and a vacuum column to separate oil into various final components.[16]


References

[edit]
  1. ^ "Pipelines Act 1962" (PDF). London Gazette. 27 March 1991. Retrieved 6 June 2020.
  • ^ "Queen Elizabeth II dock". Keith's Maritime site. Archived from the original on 27 September 2007. Retrieved 6 August 2010.
  • ^ "Eastham Refinery". Locations. Nynas. Archived from the original on 26 February 2010. Retrieved 4 August 2010.
  • ^ "Queen Elizabeth II Dock". web.archive. Archived from the original on 27 September 2007.
  • ^ a b "£6m. Oil Terminal Inaugurated (p.5)". The Times. 9 June 1960.
  • ^ a b "And all this too, from Tate & Lyle (p. 3)". The Times. 5 June 1975.
  • ^ "Inter Pipeline Announces Closing of NuStar Europe Acquisition". Inter Pipeline. 30 November 2018. Retrieved 7 June 2020.
  • ^ "Inter Terminals". Inter Terminals. Retrieved 6 June 2020.
  • ^ "Hydrodec Oil Re-Refinery Eastham". infrastructure.planninginspectorate.gov.uk. 2015. Retrieved 7 June 2020.
  • ^ "Proposed waste re-refinery" (PDF). Hydrodec. June 2015. Retrieved 4 June 2020.
  • ^ a b c "Eastham Oil Refinery". wikimapia. Retrieved 6 June 2020.
  • ^ Vielvoye, Roger (19 November 1973). "Massive build-up of oil refining capacity (p. 21)". The Times.
  • ^ Connon, Heather (18 July 1992). "Tarmac raises £ 60m in sale of bitumen refiner". The Independent.
  • ^ McKetta, John J. (1992). Petroleum Processing Handbook. CRC Press. pp. Table 2.
  • ^ Energy Institute, EI Datasheet 07, UK refining distillation capacity, January 2019
  • ^ a b c "Environment Agency - Notice of variation and consolidation" (PDF). Publishing service.gov.uk. 26 June 2017. Retrieved 7 June 2020.
  • [edit]


    53°18′45.16″N 2°56′49.96″W / 53.3125444°N 2.9472111°W / 53.3125444; -2.9472111


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Eastham_Oil_Terminal&oldid=1157045013"

    Categories: 
    Buildings and structures in the Metropolitan Borough of Wirral
    Mersey docks
    Petroleum infrastructure in the United Kingdom
    Oil terminals
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Use dmy dates from January 2018
    Use British English from January 2018
    Commons category link is on Wikidata
    Coordinates on Wikidata
     



    This page was last edited on 25 May 2023, at 23:11 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki