Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background  





2 Dam  





3 Emborcação Hydroelectric Power Plant  





4 See also  





5 References  














Emborcação Dam






Deutsch
Norsk bokmål
Português
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 18°2649S 47°5911W / 18.44694°S 47.98639°W / -18.44694; -47.98639
 

From Wikipedia, the free encyclopedia
 


Emborcação Dam
Emborcação Dam is located in Brazil
Emborcação Dam

Location of Emborcação Dam in Brazil

Official nameUsina de Emborcação
LocationAraguari, MG, Brazil
Coordinates18°26′49S 47°59′11W / 18.44694°S 47.98639°W / -18.44694; -47.98639
Construction began1977
Opening date1983
Construction cost$380 million USD
Owner(s)CEMIG
Dam and spillways
Type of damEmbankment
ImpoundsParanaíba River
Height158 m (518 ft)
Length1,507 m (4,944 ft)
Spillway typeService, gate-controlled
Reservoir
CreatesEmborcação Reservoir
Total capacity17.6 km3 (14,300,000 acre⋅ft)
Surface area703 km2 (271 sq mi)
Power Station
Commission date1982-1983
TypeConventional
Turbines4 x Francis turbines
Installed capacity1,192 MW (1,598,000 hp)

The Emborcação Dam, also known as Theodomiro Santiago, is an embankment dam on the Paranaíba River near AraguariinMinas Gerais, Brazil. It was constructed for hydroelectric power production and flood control.

Background[edit]

Feasibility studies for the dam occurred in 1971 and in June 1977, construction on the dam began. In August 1981, the dam began to impound the reservoir and the first generator became operation in 1982, the last in 1983. The dam was inaugurated in 1983 by Brazilian president João Batista Figueiredo.[1]

Dam[edit]

The dam is 1,507 metres (4,944 ft) long and 158 metres (518 ft) tall and withholds a reservoir with a capacity of 17.6 cubic kilometres (14,300,000 acre⋅ft) and surface area of 703 square kilometres (271 sq mi).

Emborcação Hydroelectric Power Plant[edit]

The dam's power plant contains four 298 megawatts (400,000 hp) generators powered by Francis turbines for a total installed capacity of 1,192 megawatts (1,598,000 hp).[2][3]

See also[edit]

  • iconWater portal
  • iconRenewable energy portal
  • References[edit]

    1. ^ "Plant Emborcação celebrates 25 years". CEMIG. 2008-03-06. Archived from the original on 5 October 2010. Retrieved 19 September 2010.
  • ^ "Cemig's Power Plants". CEMIG. Archived from the original on 24 July 2012. Retrieved 19 September 2010.
  • ^ "Hydroelectric Plants in Brazil - Minas Gerais". industCards. Archived from the original on 9 December 2012. Retrieved 19 September 2010.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Emborcação_Dam&oldid=1058792457"

    Categories: 
    Dams completed in 1983
    Dams in Minas Gerais
    Embankment dams
    1983 establishments in Brazil
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Coordinates on Wikidata
     



    This page was last edited on 5 December 2021, at 17:00 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki