Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background  





2 Units and subsidiaries  





3 Major facilities  





4 Rolling stock  





5 Fleet  





6 Ridership  





7 Accidents  





8 Expansion  





9 Awards and achievements  





10 Gallery  





11 References  





12 External links  














Express Rail Link






Bahasa Indonesia
Bahasa Melayu

اردو

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Express Rail Link
Overview
OwnerExpress Rail Link Sdn Bhd
LocaleKlang Valley, Malaysia
Transit typeAirport rail link
Number of lines6 7
Number of stations6
Daily ridership27,307 (2015)
Annual ridership9.967 million (2015)[1]
(Increase 7.9%)
Websitekliaekspres.com
Operation
Began operation14 April 2002; 22 years ago (2002-04-14)
Number of vehicles
  • 6 × 4-car CRRC Changchun Equator Electric Multiple Unit
  • Technical
    System length57 km (35 mi) (total)
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
    Electrification25 kV 50 Hz AC overhead catenary
    Average speed176 km/h (109 mph)

    The Express Rail Link Sdn Bhd is a company that owns and operates the airport rail link of the same name that connects the Kuala Lumpur International Airport (KLIA) with the Kuala Lumpur Sentral (KL Sentral) transportation hub, 57 kilometres apart. The company operates two different train services:

    Background[edit]

    KLIA Ekspres trainset passing Bandar Tasik Selatan station.

    Express Rail Link Sdn. Bhd. (ERL) is a joint venture company between YTL Corporation Berhad, Lembaga Tabung Haji, SIPP Rail Sdn. Bhd. (a company linked to Sultan Ibrahim Ismail of Johor[2]) and Trisilco Equity Sdn. Bhd. with each partner holding 45%, 36%, 10% and 9% of the company respectively. On 25 August 1997, the Malaysian government presented the company with a 30-year concession to finance, build, maintain and control the operations of the railway.

    Construction began in May 1997 and was completed 5 years later. It was then handed over to SYZ consortium, a joint relations consortium between German and Malaysian companies consisting of Siemens, Siemens Electric Engineering Sdn. Bhd and Syarikat Pembenaan Yeoh Tiong Lay Sdn. Bhd (SPYTL), a wholly owned subsidiary of YTL Corporation Bhd.

    ERL Maintenance and Support was set up in 1999 and is responsible for the operations and maintenance of trains owned by ERL. The company was initially a joint venture between Express Rail Link Sdn. Bhd. and Siemens, but since June 2005 it has been wholly owned by Express Rail Link Sdn. Bhd.[3]

    The 1997 financial crisis that hit Asia caused a brief setback to the project but due to strong governmental support, the project went on to completion. The project racked up a cost of RM2.4 billion which was financed through equity mergers (RM500 million), loans from Development and Infrastructure Bank of Malaysia (RM940 million) and the remainder through import credit[4] from four German financial institutions.

    In January 2024, the concession for Express Rail Link Sdn. Bhd. to operate the KLIA Ekspres and KLIA Transit, which was originally to expire in 2017, was extended for a further 30 years (to 2059), after seven years of negotiations. The revised concession includes the introduction of “market-based”/variable fare pricing (ticket prices are currently fixed) and a profit-sharing mechanism with the government (30% of any additional profit if the rate of return exceeds 10%). However, ERL will no longer receive a share of the Passenger Service Charge paid by all passengers departing from Kuala Lumpur International Airport.[5]

    Units and subsidiaries[edit]

    ERL Maintenance Support Sdn Bhd, or E-MAS, is ERL's operations and maintenance (O&M) subsidiary. E-MAS had working together with CRCC since 2012 on the operation & maintenance of Al Mashaaer Al Mugaddassah Metro Southern Line which their 13 employees were selected for the first outing in 2012 and another 29 employees were sent in 2013. In 2014 Hajj season, ERL has been working with Prasarana Malaysia to help fulfil CRCC's manpower requirements.[6]

    Major facilities[edit]

    Rolling stock[edit]

    Inside the CRRC Changchun ERL Equator EMU used from KLIA Transit.

    Both the KLIA Ekspres and KLIA Transit use 12 four-car Siemens Desiro ET 425 M electric multiple unit (EMU) trains. The trains are derived from and technically similar to the DBAG Class 425 used on S-Bahn systems in Germany[7] and run at a maximum commercial speed at 160 km/h, the fastest speed for rail travel in Malaysia.

    On 27 November 2014, Express Rail Link ordered from CRRC Changchun six new 4-car trains to cater to the ridership growth of both KLIA Ekspres and KLIA Transit services. CRRC's Zhuzhou plant had already supplied rolling stock to the Rapid KL Ampang Line and KTM Komuter. Of the six new trains, two will be used for KLIA Ekspres and four for KLIA Transit. Delivery of the six new trains will be made progressively from May 2016 onwards, after which testing will be done. ERL expects all six trains to be operational by November 2016.[8][9][10]

    Commercial service commenced on 13 March 2018 using CRRC Changchun Equator EMUs.[11]

    Fleet[edit]

    Line Code Line Name Formation In service EMU/Fleet Manufacturers
    6 KLIA Ekspres 4 cars EMU
    • 8 trainsets (32 cars)
  • 2 trainsets (8 cars)
  • CRRC Changchun "Equator EMU"
  • China CRRC Changchun
  • 7 KLIA Transit 4 cars EMU
    • 4 trainsets (16 cars)
  • 4 trainsets (16 cars)
  • CRRC Changchun "Equator EMU"
  • China CRRC Changchun
  • Ridership[edit]

    KLIA Express & KLIA Transit Ridership[12][13]
    Year KLIA Express KLIA Transit Note
    2023 1,440,773 5,143,373
    2022 563,472 3,375,314
    2021 53,434 724,997 Total lockdown
    2020 388,949 2,189,136 COVID-19 pandemic
    2019 2,156,302 6,788,122 Highest on record (KLIA Transit)
    2018 2,195,353 6,540,177
    2017 2,275,650 6,443,667
    2016 2,419,883 6,485,272
    2015 3,470,710 6,496,617 Highest on record (KLIA Express)
    2014 2,928,302 6,310,323
    2013 2,062,223 4,374,220
    2012 1,649,410 3,713,536
    2011 1,581,476 3,236,795
    2010 1,507,519 2,626,121
    2009 1,419,827 2,441,739
    2008 1,578,706 2,508,886
    2007 1,780,384 2,449,842
    2006 1,838,723 2,369,763
    2005 1,604,404 1,829,224
    2004 1,912,340 1,734,614
    2003 1,697,574 970,598
    2002 1,048,201 187,848 Opened on 14 April 2002

    Accidents[edit]

    On 24 August 2010, Express Rail Link suffered their first reported accident in which 3 passengers were injured. Two ERL trains collided at Kuala Lumpur Sentral, Of the trains involved one of them was about to depart at 9.45pm for Kuala Lumpur International Airport while the other train, which was empty, rammed into its rear.[14][15]

    Expansion[edit]

    A 2.14 km extension to the new KLIA2 terminal of Kuala Lumpur International Airport has been completed. Commercial service commenced on 1 May 2013.[16]

    There are proposals to extend the line with two to four stations to Seremban and Melaka.[17]

    Due to automatic termination of Kuala Lumpur–Singapore high-speed rail bilateral agreement after passing postponement deadline on 31 December 2020, the government planned to extend the line until Johor Bahru as an alternative for the cancelled HSR project.[18][19]

    Awards and achievements[edit]

    Year Award Category Result Ref(s)
    2014 Global AirRail Awards North Star Air Rail Link of the Year Won [20]
    2015 Global AirRail Awards North Star Air Rail Link of the Year Won [20]
    2016 Global AirRail Awards North Star Air Rail Link of the Year Won [20]
    Social Responsibility Won [20]

    Gallery[edit]

    References[edit]

    1. ^ "JADUAL 2.9 : BILANGAN PENUMPANG BAGI PERKHIDMATAN SISTEM ALIRAN RINGAN, SUKU KEEMPAT, 2015" [Table 2.9 : Number of Passengers for Light Rail Transit (LRT) Services, Fourth Quarter, 2015] (PDF) (in Malay and English). Ministry of Transport, Malaysia. Retrieved 31 March 2016.
  • ^ "SIPP takes 10% stake in ERL ahead of HSR project". The Edge Malaysia. Retrieved 2024-01-24.
  • ^ Developing local capabilities in Malaysia Archived 2016-04-14 at the Wayback Machine Railway Gazette International April 2006
  • ^ "Import Credit Definition from The Free Dictionary".
  • ^ "Putrajaya extends ERL concession period by 30 years after seven-year negotiations, says Loke". The Edge Malaysia. 2024-01-23. Retrieved 2024-01-24.
  • ^ "ERL Joins Forces with Prasarana to Send Operations Staff to Makkah Metro to Support the 2014 Hajj Season". myrapid.com.my. Archived from the original on 2014-07-28. Retrieved 2014-07-22.
  • ^ Siemens - Express Rail Link Kuala Lumpur Archived 2006-07-20 at the Wayback Machine
  • ^ "Express Rail Link & Changchun Railway Ink Agreement for Purchase of New Trains". prnewswire.com. Retrieved 2014-11-27.
  • ^ "Express Rail Link signs deal for six new trains". globalairrail.com. Archived from the original on 2017-12-15. Retrieved 2014-11-26.
  • ^ "ERL buys 6 new trains from China's CRC". myrapid.com.my. Retrieved 2014-11-26.
  • ^ "Coupled CRRC "Equator EMU" with Self-developed Core Systems Put into Operation Today". crrcgc.cc. Retrieved 2018-03-19.
  • ^ "Transport Statistics Malaysia 2008" (PDF). Retrieved December 19, 2019.
  • ^ "Statistik Rel". mot.gov.my. Archived from the original on 2020-02-16. Retrieved 2019-12-19.
  • ^ "2 ERLs crash at KL Sentral". Archived from the original on 2010-09-26.
  • ^ "2 ERLs crash at KL Sentral, 3 hurt".
  • ^ "Express Rail Link Extension to KLIA2". Archived from the original on 2012-11-23. Retrieved 2012-11-21.
  • ^ "Putrajaya mulls RM8b ERL extension from KLIA to Malacca". Malay Mail. 26 May 2014. Retrieved 4 January 2021.
  • ^ "PN govt wanted 'direct nego' HSR contracts, says Najib". Free Malaysia Today. 4 January 2021. Retrieved 4 January 2021.
  • ^ "Johor chief minister: State govt hopes Malaysia continues HSR project despite termination with S'pore". Today online. 2 January 2021. Retrieved 4 January 2021.
  • ^ a b c d "ERL named 'North Star Air Rail Link of the Year' for third time". New Straits Times. 19 November 2016. Retrieved 19 June 2017.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Express_Rail_Link&oldid=1233272396"

    Categories: 
    Express Rail Link
    Privately held companies of Malaysia
    Malaysian companies established in 2002
    Railway companies established in 2002
    Tabung Haji
    Hidden categories: 
    CS1 Malay-language sources (ms)
    Webarchive template wayback links
    Commons category link is on Wikidata
     



    This page was last edited on 8 July 2024, at 06:19 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki