(Top)
 


1 History  





2 In modern roadway construction  





3 In bridge construction  



3.1  Typical falsework components  







4 See also  





5 References  





6 External links  














Falsework






Deutsch
Italiano
Nederlands

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Arch ring and falsework, 1932

Falsework consists of temporary structures used in construction to support a permanent structure until its construction is sufficiently advanced to support itself. For arches, this is specifically called centering. Falsework includes temporary support structures for formwork used to mold concrete[1] in the construction of buildings, bridges, and elevated roadways.

The British Standards of practice for falsework, BS 5975:2008, defines falsework as "Any temporary structure used to support a permanent structure while it is not self-supporting."

History

[edit]
Workflow on the Roman Limyra Bridge in Turkey: the falsework was moved to another opening as soon as the lower arch rib had been completed

Falsework has been employed in bridge and viaduct construction since ancient times. The Romans were renowned for its use, as at the Limyra Bridge in Turkey. Until the turn of the 20th century almost all falsework was constructed from timber. To compensate for timber shortages in different regions and to rationalize labor and material usage, new systems were developed.[2]

The major developments include the design of connection devices (coupler), transitions to other spanning beams such as steel pipes or profiles or reusable timber beams, and adjustable steel props. In 1935 W.A. de Vigier designed an adjustable steel prop which revolutionized many aspects of the construction industry including to support slab formwork, wall formwork, trench sheeting and falsework.[3] Materials from which falsework systems are manufactured have also diversified from traditional steel and timber to aluminium components.

Falsework centering in the center arch of Monroe Street Bridge, Spokane, Washington, 1911

In the UK, BS 5975 gives recommendations for the design and use of falsework on construction sites. It was first introduced by the British Standards Institute in March 1982 and the third version was published in 2008 with Amendment 1 in 2011. The new revisions bring the code up to date with methodology developed in the new CDM 2007 regulations and also the requirements of the new European codes EN 12811-1:2003 Temporary works equipment - Part 1: scaffolds, and EN 12812:2004, falsework - performance requirements and general design.

In modern roadway construction

[edit]
Fabrication: Metalworkers fabricate a falsework section from pipe and beams.
Erection: A section is lifted to a vertical position with the assistance of two forklift operators.
Placement: The section is guided into position by a ground crew.
Completed falsework: Decking and some formwork has been added.

The illustrations are of modern pipe-column falsework, used to support the formwork for a post-tensioned reinforced concrete flyover connector for the eastern span replacement of the San Francisco-Oakland Bay Bridge. When the supports are complete, wood beams and plywood or reusable metal forms will be placed, reinforcing and tenon conduits added, and concrete poured. After curing and any tenon tensioning, wedges will be removed and forms and falsework disassembled.

In bridge construction

[edit]
Falsework parallel truss bridges temporarily supporting deck segment box structures
Overpass under construction over Interstate 5inBurbank, California, in July 2021[4][5]
Sixth Street Viaduct Falsework - Bent 11 Jump Span. Shown in the background is a concrete Y-Arm.

A certain type of bridge, the self-anchored suspension bridge, must be supported during construction, either by the use of cantilever or suspension methods or by support from below. Support from below was used in the construction of the main span of the eastern span replacement of the San Francisco–Oakland Bay Bridge, using parallel prefabricated truss spans.

Cast in place concrete bridges must also be supported during construction. The new Sixth Street Viaduct in Los Angeles, California was cast on falsework and then hung on its network tied arch cables. The release of the falsework will coincide with the tensioning of the arch cables.

Typical falsework components

[edit]

Soffit: Plywood sheeting for walking platform and surface to pour bridge against, typically on top of 4×4 lumber at specified spacing of 12".

Camber: Plywood strips that compensate for beam deflection

Stringer: Steel beam that ties caps together

Top cap: Steel Beam

Post: steel pipe or 12×12 lumber.

Bottom cap: steel beam

Wedge pack: 4×4 lumber cut into wedges for falsework adjustment, various lumber sizes include 2×6s and plywood

Corbel: distribute load to pads. Typical material is 12×12 lumber and steel beams

Pad: distribute load to ground. Most commonly 6×16 lumber.

See also

[edit]

References

[edit]
  1. ^ Hardie G.M. (1995) Building Construction: Principles, Practices, and Materials. New Jersey: Prentice Hall. (Pg 116, paragraph 1) ISBN 0133505707
  • ^ Burrows, Bryan Godfrey (1989) "Organisation and quality of falsework construction: a socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained." Ph.D. thesis, University of Warwick.
  • ^ "Archived copy". Archived from the original on 2006-11-28. Retrieved 2008-10-04.{{cite web}}: CS1 maint: archived copy as title (link)
  • ^ Valley Post Staff (July 5, 2021). "Overnight 5 Freeway Closure Planned In Burbank For Bridge Construction".
  • ^ "Burbank Bridge Construction to Shut Down I-5 for Four Nights Beginning July 6". July 1, 2021.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Falsework&oldid=1223663837"

    Categories: 
    Building engineering
    Structural system
    Hidden categories: 
    CS1 maint: archived copy as title
    Articles with short description
    Short description is different from Wikidata
    Articles needing additional references from January 2023
    All articles needing additional references
    Commons category link is on Wikidata
    Articles with GND identifiers
    Articles with NDL identifiers
     



    This page was last edited on 13 May 2024, at 15:39 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki