Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Launch  





2 Operations  





3 Thruster problems  





4 See also  





5 References  














GOES 12






Català
Português
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


GOES-12
GOES-M during processing
Mission typeWeather satellite
OperatorNOAA / NASA
COSPAR ID2001-031A Edit this at Wikidata
SATCAT no.26871
Mission duration5 years (planned)
12 years (achieved)
Spacecraft properties
BusLS-1300
ManufacturerSpace Systems/Loral
Launch mass2,279 kilograms (5,024 lb)
Start of mission
Launch date23 July 2001, 07:23 (2001-07-23UTC07:23Z) UTC
RocketAtlas IIA
Launch siteCape Canaveral SLC-36A
ContractorILS
End of mission
DisposalDecommissioned[1][2]
DeactivatedAugust 16, 2013, 13:00 (2013-08-16UTC14Z) UTC
Orbital parameters
Reference systemGeocentric
RegimeGeostationary
Longitude90° West (2001-2003)
75° West (2003-2010)
60° West (2010-2013)
SlotGOES-East (2003-2010)
GOES-South (2010-2013)
Eccentricity0.0007626
Perigee altitude36,075 kilometres (22,416 mi)
Apogee altitude36,140 kilometres (22,460 mi)
Inclination5.6472°
Period24 hours
RAAN62.9959°
Argument of perigee221.8848°
Mean anomaly79.0106°
 

GOES-12, known as GOES-M before becoming operational, is an American weather satellite, which is part of the US National Oceanic and Atmospheric Administration's Geostationary Operational Environmental Satellite system. It was launched on July 23, 2001,[3] and spent its first 21 months in space as an on-orbit spare. From April 2003, the satellite took over the GOES-East position, providing coverage of the eastern half of the continental United States. In April 2010, GOES-East operations were taken over by GOES-13, and GOES-12 transitioned to the GOES-South location to devote time to South American imagery.[4] It remained at this post until it was decommissioned on August 16, 2013[3] and subsequently boosted to a graveyard orbit.

Launch

[edit]
Launch of GOES-12

GOES-M was launched aboard an International Launch Services Atlas IIA rocket,[5] flying from Space Launch Complex 36A at the Cape Canaveral Air Force Station. The launch occurred at 07:23 GMT on 23 July 2001,[6] having previously been delayed eight days; seven due to a faulty controller in the second stage of the carrier rocket, and one to ensure that a lightning strike at SLC-36B had not caused any damage to the rocket.[7] At launch, the satellite had a mass of 2,279 kilograms (5,024 lb), and an expected operational lifespan of five years, although it carried fuel for longer.[8] It was built by Space Systems/Loral, based on the LS-1300 satellite bus, and was the last of five GOES-I series satellites to be launched.

Operations

[edit]

Following launch, it was positioned in geostationary orbit at a longitude of 90° West, where it underwent on-orbit testing, and was then stored until it was needed to replace an operational satellite. It served as an on-orbit spare until 2003, when it was called up to replace GOES-8, an older satellite which, while still operational, would have run out of fuel by the end of the year.[9] Although GOES-11 was the next backup in line for activation, GOES-12 was used instead in order to test its Solar X-ray Imager.[7] The Solar X-ray Imager failed in April 2013

Thruster problems

[edit]

Since December 2007, GOES-12 has experienced three thruster leaks during orbital adjustment manoeuvres, two of which led to major outages. The first of these occurred in December 2007, during an annual manoeuvre to reduce the inclination of the satellite's orbit. The faulty thruster was shut down, and the satellite was returned to its station by means of what was thought at the time to be a backup thruster. It was later discovered that the primary and backup thrusters had been wired the wrong way around, so it had actually switched from the backup system to the primary system, however this was believed to be unrelated to the failure.[7] During this outage, GOES-10, a retired satellite which had been kept in orbit to provide coverage of South America, was briefly returned to service to cover for GOES-12.[10]

Another outage occurred on 14 December 2008, when an inactive thruster leaked, sending the satellite out of control. The on-orbit-spare satellite, GOES-13, was brought online in case GOES-12 had to be replaced, and took over imagery from its storage location at 105° West while the fault was investigated. The problem cleared several weeks later, and the satellite was returned to operational status on 5 January 2009, with GOES-13 being returned to on-orbit storage.[10]

Since then, several other leaks have occurred, however none has impacted operations.[11] During a leak in May 2009, the GOES-13 satellite was again activated, however it did not need to take over operations. Because of the thruster problems, GOES-12 was replaced by GOES-13 in the GOES-East position.

GOES-12 was decommissioned on August 16, 2013.[3]

See also

[edit]

References

[edit]
  • ^ a b c "GOES Status". NOAA. 2010-04-14. Retrieved 2010-04-27.
  • ^ "GOES-NEWS". NASA. 2009-05-09. Archived from the original on 2004-06-05. Retrieved 2009-07-09.
  • ^ Wade, Mark. "FS 1300". Encyclopedia Astronautica. Archived from the original on 2009-07-05. Retrieved 2009-07-09.
  • ^ McDowell, Jonathan. "Launch Log". Jonathan's Space Page. Retrieved 2009-07-09.
  • ^ a b c "GOES-12 Status". NOAA. Archived from the original on 2004-10-30. Retrieved 2009-07-09.
  • ^ Krebs, Gunter. "GOES 8, 9, 10, 11, 12". Gunter's Space Page. Retrieved 2009-07-09.
  • ^ "GOES 8/12 Transition Plan" (PDF). NASA. 2002-10-28. Archived from the original (PDF) on 2004-10-30. Retrieved 2009-07-09.
  • ^ a b "GOES 12 [GOES-M]". Failures. Sat ND. Archived from the original on 2011-10-05. Retrieved 2009-07-09.
  • ^ "CLASS News". NOAA. Archived from the original on 2009-06-25. Retrieved 2009-07-09.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=GOES_12&oldid=1183044531"

    Categories: 
    Spacecraft launched in 2001
    Satellites using the SSL 1300 bus
    Geostationary Operational Environmental Satellites
    Hidden categories: 
    Webarchive template wayback links
    Articles with short description
    Short description is different from Wikidata
     



    This page was last edited on 1 November 2023, at 21:48 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki