Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Development  





2 See also  





3 References  





4 External links  














Galway Wind Park







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 53°2158N 9°2203W / 53.3662°N 9.3676°W / 53.3662; -9.3676
 

From Wikipedia, the free encyclopedia
 


Galway Wind Park
Map
CountryIreland
LocationCloosh Valley, County Galway
Coordinates53°21′58N 9°22′03W / 53.3662°N 9.3676°W / 53.3662; -9.3676
StatusOperational
Construction began2015 (Phase 1)
2016 (Phase 2)
Commission dateSeptember 2017
Construction cost€280 Million
Owner(s)SSE Renewables
Greencoat Renewables
Operator(s)SSE Renewables
Wind farm
TypeOnshore
Site usage
  • Wilderness
Rotor diameter101 m
331 ft
Site elevation
  • 125 m (410 ft)
  • 235 m (771 ft)
  • Power generation
    Units operational58 x 3 MW
    Make and modelSiemens SWT-3.0-101
    Nameplate capacity174 MW
    External links
    Websitewww.sserenewables.com/onshore-wind/ireland/galway-wind-park/

    Galway Wind Park is one of Ireland's largest onshore wind farms.[1] Located in Connemara's Cloosh Valley west of Moycullen, County Galway. The wind park was co-developed by SSE Renewables and Coillte at a cost of €280 million and consists of 58 Siemens 3 MW SWT-3.0-101 wind turbines.[2] The wind park provides energy to around 89,000 homes, which is equivalent to 80% of the homes in Galway.[3]

    Development[edit]

    The project was developed over two phases and includes four permitted wind farms which are Galway Cloosh, Lettercraffroe, Seecon and Uggool.[4] Phase one of the project consists of 22 turbines located on the Uggool and Lettercraffroe sites and began construction in 2015. It was developed and financed solely by SSE Renewables and consists of 22 turbines. Phase two was developed and financed through a joint venture between SSE Renewables and Coillte. The second phase consists of 36 turbines located at the Cloosh and Seecon sites.[5]

    The Port of Galway was used in the development of the wind park, and turbine tops, hubs and blades were offloaded in the port and transported to the site by tucks during the night.[6] The 55 metres (180 ft) long blades were among some of the largest in the industry at the time of construction and a section of the Lough Atalia Road which passed under the rail bridge had to be lowered in order to facilitate the transportation of the turbine blades.[7]

    Generated electricity is sent to the nearby Uggool substation where the voltage is increased to 110kV. An underground power cable joins the Galway-Screeb 110kV overhead line and connects the wind park with the electrical grid.[4]

    Upon its completion in 2016, it was Ireland's largest onshore wind farm, remaining so until 2024 when it was overtaken by the second phase of the 194 MW Oweninny Wind Farm.[8]

    See also[edit]

  • iconWeather portal
  • iconRenewable Energy portal
  • References[edit]

    1. ^ "Galway to boast biggest wind farm in the country". Connacht Tribune. 14 January 2016. Archived from the original on 20 November 2017. Retrieved 17 February 2023.
  • ^ Zimmermann, Nils (15 January 2018). "German know-how gives Ireland a wind-powered push". Deutsche Welle. Archived from the original on 16 January 2018. Retrieved 17 February 2023.
  • ^ "First phase of Galway Wind Park completed". Connacht Tribune. 9 June 2017. Archived from the original on 9 June 2017. Retrieved 17 February 2023.
  • ^ a b "Galway Wind Park". Power Technology. 14 February 2016. Archived from the original on 16 February 2016. Retrieved 17 February 2023.
  • ^ "Ireland reaps Galway wind reward". reNEWS - Renewable Energy News. 28 November 2016. Retrieved 17 February 2023.
  • ^ Conroy, MacDara (8 January 2017). "Time Lapse Video Of Giant Wind Turbine Blade At Galway Harbour". afloat.ie. Archived from the original on 20 October 2019. Retrieved 17 February 2023.
  • ^ "Port of Galway Wind Energy Project | Port of Galway". theportofgalway.ie. 28 March 2017. Archived from the original on 27 March 2023. Retrieved 17 February 2023.
  • ^ O'Sullivan, Kevin (8 March 2024). "Unveiled: Ireland's largest onshore wind farm to power 140,000 homes". The Irish Times. Archived from the original on 8 March 2024. Retrieved 5 June 2024.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Galway_Wind_Park&oldid=1227454349"

    Category: 
    Wind farms in the Republic of Ireland
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from February 2023
    Use Hiberno-English from February 2023
    All Wikipedia articles written in Hiberno-English
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    Official website different in Wikidata and Wikipedia
    Pages using the Kartographer extension
     



    This page was last edited on 5 June 2024, at 20:29 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki