Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Before authorisation  





1.2  The Glasgow, Dumbarton and Helensburgh Railway  





1.3  Opening  





1.4  Absorption  





1.5  Steamer connections  





1.6  Glasgow routes  





1.7  The Dumbarton and Balloch Joint Railway  





1.8  The West Highland Railway  





1.9  The Singer factory  





1.10  The twentieth century  





1.11  Balloch stations  





1.12  Local station reopening  







2 The present day  





3 Topography  





4 References  





5 Notes  





6 Sources  














Glasgow, Dumbarton and Helensburgh Railway







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Glasgow, Dumbarton and Helensburgh Railway
Overview
LocaleScotland
Dates of operation14 August 1855–31 July 1862
SuccessorEdinburgh and Glasgow Railway
Technical
Track gauge4 ft 8+12 in (1,435 mm)
  • t
  • e
  • Glasgow, Dumbarton  
    and Helensburgh Railway

    Helensburgh Upper

    Helensburgh Central

    Craigendoran

    Craigendoran Junction

    Cardross

    Dalreoch

    Dumbarton Central

    Dumbarton Joint Line Junction

    Dumbarton East

    connecting line opened in 1960

    Bowling

    Bowling
    (GD&HR/C&DJR Joint)

    Kilpatrick

    Dalmuir Park Junction

    Dalmuir

    Singer Works

    Singer

    Drumchapel

    Milngavie Junction

    Westerton

    Knightswood North Junction

    Maryhill Park Junction

    Maryhill

    Kelvin Valley Junction

    Lochburn

    Possilpark

    Hamiltonhill Goods Depot

    Cowlairs Junctions

    The Glasgow, Dumbarton and Helensburgh Railway was independently sponsored to build along the north of the River Clyde. It opened in 1858, joining with an earlier local line serving Balloch. Both were taken over by the powerful North British Railway in 1865, and for some time the line was the main route in the area. As industry developed other lines were opened to serve it, and the line formed the core of a network in the area.

    The line was electrified as part of a modernisation scheme in 1960, and it continues today as the trunk of the North Clyde network west of Glasgow.

    History[edit]

    Before authorisation[edit]

    The communities of Dumbarton and Helensburgh were important staging points on the road from Glasgow to the western seaboard of Scotland, and were well served by small boats on the River Clyde.

    Most of the first railways in Scotland were the coal railways, designed to convey coal or other minerals from a pit to a port or a canal for onward conveyance. Generally these lines used horse traction and were short.

    In 1842 the Edinburgh and Glasgow Railway (E&GR) started its operations, and showed what an inter-city railway could do, carrying passengers and goods over a longer distance. Towns served by the new railway immediately felt the advantage, as the necessities of life, particularly coal and lime for farm use, became much cheaper, and the transport to market of locally manufactured goods was also immeasurably improved.

    The notion of long-distance railways, and a network, took hold of the public imagination, and the easily available money of the 1840s led to a frenzy of Scottish railway promotion. Intrinsic in this was the question of how the cities of central Scotland might best be linked with the emerging English railway network. This culminated in the authorisation of a large number of Scottish lines in 1844 - 1845.

    Those railways, notably the North British Railway, the Caledonian Railway and the Glasgow and South Western Railway, had their own priorities, which in most cases was to consolidate the area in which they were dominant. At first the north bank of the Clyde was left to the river boats.

    In 1846 the Caledonian and Dumbartonshire Junction Railway[note 1] (C&DJR) was authorised, to connect with the E&GR near Cowlairs and to build a railway to Balloch, on Loch Lomond; at the time the River Leven was the centre of a considerable industry in textile printing.[1]

    The C&DJR was unable to raise the capital necessary to build all of its line, and it had to content itself with building from Bowling through Dumbarton to Balloch, relying on Clyde steamers to close the gap to the city.[2]

    The Glasgow, Dumbarton and Helensburgh Railway[edit]

    The Glasgow, Dumbarton and Helensburgh Railway system

    The C&DJR line was remarkably successful, and that only emphasised the potential of a railway that truly connected the area north and west of Dumbarton with Glasgow.

    Local people promoted a railway to close the gap, and the Glasgow, Dumbarton and Helensburgh Railway was authorised on 15 August 1855, to build a line from Cowlairs, on the Edinburgh and Glasgow line, to Helensburgh. Trains would use the Queen Street passenger terminus and Sighthill goods depot of the Edinburgh and Glasgow Railway. The authorised capital was £240,000.[3]

    The line was to link with the Caledonian and Dumbartonshire line and run over it in the centre of its route, and the Edinburgh and Glasgow Railway was to operate it. The planned line ran round the north of Glasgow, avoiding construction in the built up area. The directors were proud of their local support; much English capital had supported the construction of the earlier trunk railways of the 1840s, but those days were past.

    The company agreed to repay the C&DJR company half of the cost of the River Leven bridge at Dumbarton.[2]

    Opening[edit]

    When the construction was nearly complete, a disagreement with the Edinburgh and Glasgow Railway arose over the terms of using the Queen Street station. Instead of using that company's terminal facilities, on opening day the GD&HR trains ran to the Caledonian Railway Buchanan Street station from Sighthill. The opening took place on 28 May 1858. However a month later agreement emerged with the E&GR and the more convenient arrangement of running to Queen Street resulted from 30 May 1858.

    The line west of Dumbarton was single,[2] with spartan accommodation at the stations.[2][3]

    The GD&HR was working collaboratively with the C&DJR and most trains, passenger and goods, divided at Dumbarton, with a portion continuing to Helensburgh (GD&HR) and Balloch (C&DJR).[3] Steamer operators had run from Glasgow to Bowling Pier for the onward connection over the C&DJR; that was now futile because of the through railway route, and many of them switched to operating throughout from Glasgow to Dumbarton and River Leven destinations in direct competition with the railway; they had to reduce their fares drastically in view of the speed disadvantage they suffered.

    The GD&HR had intended to operate onward steamer connections from Helensburgh to the Clyde Estuary locations in 1858, but they discovered that the Caledonian Railway, established at Greenock on the south bank, had chartered all the available vessels and were monopolising the service from their own side of the river. The GD&HR had to wait until the following season to start a serious train-and-steamer operation.[2]

    They also suffered a rebuff in Helensburgh, where the pier was some distance from the railway station; attempts to obtain agreement to a railway connection to the pier were consistently resisted by the people of Helensburgh.[2][4]

    Absorption[edit]

    As the line was operated by the Edinburgh and Glasgow Railway, the question arose of selling the line to that company; the C&DJR was in the same position. The absorption took place on 14 August 1862 when the GD&HR and the C&DJR ceased to exist: the line was owned by the E&GR.[2]

    The E&GR itself did not have a long independent existence after that date; the North British Railway was becoming more powerful and absorbed the E&GR on 31 July 1865.[2]

    The NBR was conducting a competitive war against the rival Caledonian Railway, and it immediately established a steamer service from Frisky Wharf (the C&DJ pier at Bowling) and Greenock, gaining a foothold there in Caledonian territory.[4]

    Steamer connections[edit]

    The North British had a subsidiary, the North British Steam Packet Company, which operated steamer connections to Firth of Clyde piers. The services from Helensburgh were not greatly successful, and it was clear that the Helensburgh pier was unsatisfactory in the absence of a direct railway link.[5] On 15 May 1882 a new pier was built at Craigendoran, a mile or so east of Helensburgh, and a short railway spur there gave a direct connection. Only from that year was the NBR able to operate a successful steamer connection to Rothesay and the other important Clyde locations.[2][6][5] The town of Helensburgh contested the establishment of the Craigendoran pier, fearing the loss of trade at their pier, even though they had refused a railway connection to it. Indeed, they defeated the first Bill in Parliament, and the NBR had to resubmit a Bill in the 1879 session; the cost was to be £35,000. (It actually cost £50,000.) The NBR acquired an additional steamer, Sheila, to supplement Dandy Dinmont and Gareloch.[5]

    The line had previously run dead straight approaching Helensburgh (approximately along the alignment of the present day Marmion Avenue and Monaebrook Place) but to accommodate the Craigendoran Pier station adjacent to the through line, a new southerly sweep was introduced and the old straight route abandoned. The garden of no. 2 Marmion Avenue contains an original stone arch bridge over the Drumfork Burn.[7]

    In the year 1896 it was reported that Greenock to Glasgow commuters were being encouraged to cross the Clyde by steamer to Craigendoran, and to travel to Glasgow from there by the NBR trains.[5]

    Glasgow routes[edit]

    The GD&HR route had always been reached from Glasgow by a roundabout route: the line left Queen Street in a north-easterly direction and arched round the north of the city to run west to Dumbarton and Helensburgh. The line was not planned as a suburban railway; in fact the first station on leaving Glasgow was Maryhill, then an isolated rural town, followed by Dalmuir.[2]

    The town of Milngavie was home to considerable industrial activity, especially in the field of textiles and paper making, and the independent Glasgow and Milngavie Junction Railway was opened in 1863. It connected to the GD&HR line at Milngavie Junction; it was not until 1913 that a station was opened at the junction: it was Westerton. The Glasgow and Milngavie Junction Railway was absorbed by the NBR in 1873.[2]

    Responding to the shortcomings of quay facilities in Glasgow, the Clyde Trustees undertook an ambitious project from 1871 to build a large dock at Stobcross, on marshland on the north bank downstream. This became the Queen's Dock, and it opened in 1874.[8]

    The North British Railway wished to access these new industrial developments, and foreseeing the demand for mineral transport in connection with the construction of the Queen's Dock, built a connecting line to it, the Stobcross Railway, leaving the GD&HR line at Maryhill and running south and then east. It opened on 20 October 1870, and it formed an important goods artery for NBR. In 1874 the short Whiteinch Railway was opened, leaving the Stobcross line near Jordanhill, and running to an area of industrial development on the Clyde.

    The pattern of developing heavy industry to the west of the city was increasing, to satisfy the demand for more spacious sites and easy access to the Clyde for river transport. For shipbuilding purposes, access to a wider section of the Clyde was important as the vessels being produced were larger in size than in the past. The area that became known as Clydebank became the centre of considerable heavy industry development from 1871. In 1882 the Glasgow, Yoker and Clydebank Railway opened to serve those area. It left the Stobcross and Whiteinch lines near Jordanhill and ran west close to the Clyde, to a terminus at Clydebank.[2]

    The NBR now had a network of lines in the developing suburbs west of Glasgow, but the long circuit to reach the Queen Street terminus was a deterrent, and it was not until the Glasgow City and District Railway opened in 1886 that a direct route was available. The GC&DR was a sub-surface route running east to west through the centre of Glasgow, connecting in to the NBR lines and forming a direct run towards Dumbarton.[2][5]

    A short branch to Ruchill was opened in 1886; it ran from the GD&HR route at Possilpark Junction; a considerable industrial complex had arisen at Ruchill, on the east side of the Forth and Clyde Canal.[5]

    The Dumbarton and Balloch Joint Railway[edit]

    For many years the North British Railway had an effective monopoly of nearly all of the North Clyde coast west of Glasgow. As industrial and residential development became ever more important in the area, the rival Caledonian Railway sought to enter into the area, and it encouraged a nominally independent company to promote a line. This became the Lanarkshire and Dumbartonshire Railway (L&DR).[note 2] It proposed to build from the Caledonian system in Glasgow to a pier on Loch Lomond, tapping the important steamer trade to Lomondside piers, and also the textile industry locations in the valley of the River Leven.[2] The new line would have closely paralleled the existing NBR lines, and especially in the narrow Leven valley this was seen as objectionable. A compromise was reached by which the L&DR would build only as far as Dumbarton and the line from there to Balloch would be made joint between the NBR, the LD&R, and the Caledonian Railway. (The Caledonian Railway worked the L&DR line, and absorbed it on 1 August 1909.)

    This took effect from 1 October 1896; the junction was made some distance east of Dumbarton station. NBR and Caledonian trains both ran from Balloch Pier to Glasgow, but the onward route from Dalreoch to Helensburgh remained NBR property, so that NBR trains from Glasgow to Helensburgh ran over the D&BJR line in the central part of their journey.[2] The D&BJR paid the NBR part of the capital cost of building that part of the line, but the NBR now had to pay tolls to the joint company for its trains' passage over the joint section.[5]

    The West Highland Railway[edit]

    Up until this time the GD&HR route and the associated branches had formed a developing outer suburban network of the North British Railway. In 1894 the West Highland Railway opened its main line to Fort William. The main line passenger and goods trains used the GD&HR route between Glasgow and Craigendoran Junction, where the West Highland line diverged. It had its own station in Helensburgh, named Helensburgh Upper, and its own platforms at Craigendoran.[7]

    Considering the expansion of traffic, the line between Dalreoch and Cardross was doubled in 1894.[6]

    The Singer factory[edit]

    The American Singer Corporation had opened a British factory from 1867 in Dunbartonshire, manufacturing sewing machines for the British market. The factory grew considerably and in 1883 a new plant was opened adjacent to the Kilbowie station of the GD&HR line. It had extensive internal sidings, and considerable numbers of workers travelled daily from elsewhere by train to their work.

    In 1907 the factory needed once more to expand, and this was achieved by displacing the railway northwards. Part of the earlier line was retained and the original Kilbowie station retained as a private terminal station, Singers Works, for Singer employees, and a heavy workers' passenger service used the station.[2]

    A new station was built further north on the relocated GD&HR main line and renamed Singer, and the name is retained to the present day.[5][7]

    The twentieth century[edit]

    The main line railways of Great Britain were "grouped" under the Railways Act 1921 into four larger entities in 1923; the North British Railway was a constituent of the new London and North Eastern Railway (LNER). The Caledonian Railway was a constituent of the new London Midland and Scottish Railway (LMS) so that the joint line was still under joint ownership.

    In 1948 further reorganisation was imposed by Government, when the railways were nationalised. The LNER and the LMS now both formed part of the Scottish Region of British Railways. For the time being the former train service patterns continued, even though the former NBR route and the Caledonian route were under the same management.[2] However both routes were run down, and the post war surge of better public transport by bus, and the rise in private car ownership, coupled with the beginning of the decline of the heavy industries on Clydeside, meant that change was inevitable.

    A modernisation plan for the railways was developed; a route from Glasgow to Dumbarton and Helensburgh was to be electrified, but the duplicate routes could not be sustained. The former NBR route was selected for electrification, and this was inaugurated on 5 November 1960. The Caledonian line approaching Dumbarton served an important shipyard in Dumbarton, and also extensive housing that was not on the NBR line, so a connection was made at Dunglass, near Bowling, and the new electric trains ran over the former Caledonian route from there to Dumbarton Junction; that section of the NBR was closed.[5]

    The electric service was not trouble-free, for on 30 October 1960, a transformer explosion in an electric train took place in Glasgow, followed on 13 December by a serious explosion in a train at Renton, and the electric service was suspended. Steam trains resumed while modifications were made to the electrical equipment in the trains, which resumed on 1 October 1961.[5]

    The ordinary running of steam trains from Balloch on the L&DR route to Glasgow continued until 1964.[9]

    For some years a commuter service was operated from Arrochar & Tarbet on the West Highland line to Craigendoran. Passengers bound for Glasgow changed at Craigendoran. In the westbound direction the Arrochar train started in the Pier station and ran east to the junction, reversing there to continue its journey. The service ceased in 1964. Craigendoran Pier was closed in 1972 after a collapse in steamer usage.[7]

    Balloch stations[edit]

    There were two stations at Balloch. Balloch Pier was on Loch Lomond and in the nineteenth century it was the scene of considerable transfer traffic from steamers to trains. After 1950 that traffic declined heavily, and in later years there was no timetabled passenger service, although the line remained available for excursion traffic. The last passenger trains operated in September 1986.

    Balloch station, serving the town, was renamed Balloch Central in 1962. When the Pier station was due to be closed, it was decided to relocate the Balloch station south of Balloch Road to eliminate use of the level crossing. This was done on 29 September 1986, and the station was once again named simply Balloch.[2]

    Local station reopening[edit]

    After the opening of the Glasgow City and District Railway in 1886, most passenger trains ran through the low level lines at Queen Street, and the northwards loop from Westerton to Cowlairs became a low priority for local trains, although the West Highland trains and goods traffic ran that way.

    In 1993 a new local passenger service was started, using new and reopened stations on the northern loop. A thirty-minute interval service operates on the line between Glasgow Queen Street and Anniesland.

    The present day[edit]

    In 2015, the dominant service pattern on the former GD&HR route consists of half-hourly trains from Helensburgh to Glasgow Queen Street (continuing to Edinburgh) and half-hourly trains from Balloch to Glasgow Queen Street, continuing to Airdrie. The Helensburgh trains omit many intermediate stops and make the journey to Queen Street in 47 minutes. In addition, the West Highland line trains travel over the route, as does the 1993 local service.

    Topography[edit]

    When it opened, the GD&HR consisted of a line from Cowlairs Junction to Bowling, with stations at Maryhill, Dalmuir, and Kilpatrick, and a section from Dalreoch to Helensburgh, with stations at Cardross and Helensburgh.

    The later location list is:

    References[edit]

    1. ^ Turnock, David (1982). The Historical Geography of Scotland Since 1707. Cambridge: Cambridge University Press. ISBN 0-521-24453-6.
  • ^ a b c d e f g h i j k l m n o p q r Thomas, John (1984). A Regional History of the Railways of Great Britain. Vol. 6, Scotland, the Lowlands and the Borders. revised by J.S. Paterson. Newton Abbot: David and Charles. ISBN 0-946537-12-7.
  • ^ a b c Carter, E.F. (1959). An Historical Geography of the Railways of the British Isles. London: Cassell.
  • ^ a b Thomas, John (1969). The North British Railway. Vol. 1. Newton Abbot: David & Charles. ISBN 0-7153-4697-0.
  • ^ a b c d e f g h i j Ross, David (2014). The North British Railway: A History. Catrine: Stenlake Publishing Limited. ISBN 978-1-84033-647-4.
  • ^ a b Thomas, John (1975). The North British Railway. Vol. 2. Newton Abbot: David & Charles. ISBN 0-7153-6699-8.
  • ^ a b c d Noble, Stewart (2010). The Vanished Railways of Old Western Dunbartonshire. Stroud: The History Press. ISBN 978-0-7509-5096-1.
  • ^ Riddell, John (1988). The Clyde. Fairlie: The Fairlie Press. ISBN 1-871209-00-5.
  • ^ Gillham, J.C. (1988). The Age of the Electric Train. London: Ian Allan Limited. ISBN 0-7110-1392-6.
  • ^ a b Quick, M.E. (2002). Railway Passenger Stations in England Scotland and Wales—A Chronology. The Railway and Canal Historical Society.
  • Notes[edit]

    1. ^ The company chose the spelling Dumbartonshire; in the nineteenth century both spellings were common, although in the twentieth century the County administration was spelt Dunbartonshire.
  • ^ Like the Caledonian and Dumbartonshire Junction Railway, the Dumbarton and Balloch Joint Railway also used the spelling Dumbartonshire.
  • Sources[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Glasgow,_Dumbarton_and_Helensburgh_Railway&oldid=1217670987"

    Categories: 
    North British Railway
    Pre-grouping British railway companies
    Early Scottish railway companies
    Railway companies established in 1855
    Railway companies disestablished in 1862
    British companies established in 1855
    Dumbarton
    Clydebank
    Helensburgh
    Maryhill
    British companies disestablished in 1862
    Hidden categories: 
    CS1: long volume value
    Articles lacking in-text citations from November 2017
    All articles lacking in-text citations
    Use dmy dates from April 2020
     



    This page was last edited on 7 April 2024, at 05:27 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki