1 History  





2 Design and specification  





3 Cost and economics  





4 Units  





5 Updates  





6 See also  





7 References  














Gorakhpur Nuclear Power Plant






ि
Italiano

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 29°2629N 75°3756E / 29.44139°N 75.63222°E / 29.44139; 75.63222
 

From Wikipedia, the free encyclopedia
 


Gorakhpur Nuclear Power Plant
Map
Location of Gorakhpur Nuclear Power Plant in Haryana
Official nameGorakhpur Haryana Anu Vidyut Pariyojana
CountryIndia
LocationGorakhpur village, Fatehabad district, Haryana
Coordinates29°26′29N 75°37′56E / 29.44139°N 75.63222°E / 29.44139; 75.63222
StatusUnder Construction
Construction beganUnit 1 & 2: January 2018
Commission dateUnit 1 & 2: 2032 (planned)
Construction cost20,594 crore (equivalent to 330 billion or US$3.94 billion in 2023)
Owner(s)NPCIL
Operator(s)NPCIL
Nuclear power station
Reactor typeIPHWR-700
Reactor supplierNPCIL/BARC
Cooling sourceBhakra Main Line Canal (via Nangal hydel Channel from Bhakra Nangal Dam)
Power generation
Units planned2 x 700 MW
Units under const.2 x 700 MW
External links
CommonsRelated media on Commons
The Prime Minister, Dr. Manmohan Singh addressing at the foundation stone laying ceremony of the Gorakhpur Haryana Anu Vidyut Pariyojana (Nuclear Power Project), in Fatehabad, Haryana on January 13, 2014. The Governor of Haryana, Shri Jagannath Pahadia, the Chief Minister of Haryana, Shri Bhupinder Singh Hooda and the Union Minister for Social Justice & Empowerment, Kumari Selja are also seen.

The Gorakhpur Nuclear Power Plant or the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) is a proposed nuclear power plant to be built on a 560 hectares (1,400 acres) area west of Gorakhpur villageofFatehabad districtofHaryana.[1][2]

The foundation stone of the 2800 megawatt nuclear power plant was laid on 13 January 2014 by Shri MANMOHAN SINGH (Prime Minister of India). The first phase of the project will have an installed capacity of 1400 MW and was expected to be completed by 2025,[3] however the deadline has been now extended to 2032.[4] The construction of second phase will gather pace afterwards, which will double the capacity to 2800 MW and has a deadline of 2036.

History[edit]

One year after laying the foundation stone, there was no reactor construction activity. NPCIL carried out only certain pre-project activities on the land. There were problems with the Environment Court at Kurukshetra and over the possession of 28 acres, as owners of the land refused to accept compensation and to vacate the land. Officials said that the government was suffering a financial loss of Rs 7 to 8 crore per day for the delay of the project.[5]

On May 27, 2015, a police force evicted farmers living on a piece of land acquired by the NPCIL. Houses were razed, crops destroyed, and the farmers belongings and cattle carted away. In 2012, NPCIL acquired over 1,503 acres (608 ha) of land in Gorakhpur, Kajal Heri and Badopal for the setting up of nuclear power plant. The corporation had taken possession of the major part of land, but farmers owning 28 acres had refused the compensation and were not vacating the land.[6]

In March 2016, still only preparatory activities were made.[7] By 2018, NPCIL had started the procurement activities for this project, as BHEL secured the order for supply of steam generators to this project.[8]


As of April 2022, the foundation piles have been completed for units 1 and 2, while the excavation work for other structures such as cooling towers are in progress. Only pre-project activities had been carried out for units 3 and 4.[4]

Design and specification[edit]

The proposed 700 MW IPHWR-700 pressurized heavy water reactors are indigenous and similar to the ones currently under construction in Kakrapar Atomic Power Station (KAPP-3 &4) and Rajasthan Atomic Power Station (RAPP-7 &8). Also, the reactor size and the design features of 700 MW are similar to that of 540 MWe of Tarapur Atomic Power Station 3 & 4 Units, except that partial boiling of the coolant is up to about 3% (nominal) at the coolant channel exit has been allowed.[1]

Cost and economics[edit]

Being built by the Nuclear Power Corporation of India, the project is estimated to cost 20,594 crore (equivalent to 330 billion or US$3.94 billion in 2023) as of January 2014.[1]

Units[edit]

Phase Unit
No.
Reactor Status Capacity in MWe Construction start First criticality Grid Connection Commercial operation Closure Notes
Type Model Net Gross
I 1 PHWR IPHWR-700 Under construction 630 700 2032 [9]
2 PHWR IPHWR-700 Under construction 630 700 2032 [9]
II 3 PHWR IPHWR-700 Planned 630 700 [9]
4 PHWR IPHWR-700 Planned 630 700 [9]

Updates[edit]

See also[edit]

References[edit]

  1. ^ a b c "Prime Minister Dr. Manmohan sigh Lays Foundation Stone of 2800 MW Gorakhpur Haryana Anu Vidyut Pariyojana (Nuclear Power Project)". Press Information Bureau (Government of India). 13 January 2014. Retrieved 6 February 2014.
  • ^ "Gorakhpur nuclear power plant makes headway". Down To Earth. 20 September 2012. Archived from the original on 21 September 2017. Retrieved 2 April 2016.
  • ^ "Gorakhpur Atomic Power Plant". Press Information Bureau. 2 January 2019.
  • ^ a b "Deadline for Phase I of Gorakhpur N-plant extended to 2032: Centre". The Tribune. 2 April 2022.
  • ^ Year on, construction yet to begin on Gorakhpur N-plant. The Tribune Trust. 12 January 2015. Retrieved 2 April 2016.
  • ^ Police evict farmers from land for nuclear plant. The Tribune Trust. 12 May 2015. Retrieved 2 April 2016.
  • ^ A 1400 Mwe Nuclear Power Project Coming at Gorakhpur in Haryana. EnergyInfraPost. 10 March 2016. Retrieved 2 April 2016.
  • ^ Market, Capital (12 March 2018). "Bhel secures order worth Rs 736 crore from NPCIL". Business Standard India.
  • ^ a b c d "Indian regulator gives go-ahead for first concrete at Gorkakhpur". World Nuclear News. 27 November 2020.
  • ^ "Godrej & Boyce gets Rs 468 cr order to supply generators for PHWR project". Business Standard India. Press Trust of India. 16 July 2021. Retrieved 16 August 2021.
  • ^ "India's BHEL awarded steam generator contract for domestic PHWRs : Corporate - World Nuclear News". world-nuclear-news.org. Retrieved 16 August 2021.
  • ^ "L&T arm flags off second end-shield for pressurized heavy water reactors to be set up at GHAVP in Haryana". Outlook (Magazine). Retrieved 16 August 2021.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Gorakhpur_Nuclear_Power_Plant&oldid=1231938341"

    Categories: 
    Nuclear power stations in Haryana
    Energy in Haryana
    Proposed power stations in India
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Use Indian English from June 2015
    All Wikipedia articles written in Indian English
    Use dmy dates from June 2015
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Nuclear power station articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 1 July 2024, at 02:38 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki