(Top)
 


1 Location  





2 Overview  





3 Construction  





4 See also  





5 References  





6 External links  














HoimaKinyaraKafu High Voltage Power Line







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 01°2514N 31°2222E / 1.42056°N 31.37278°E / 1.42056; 31.37278
 

From Wikipedia, the free encyclopedia
 


Hoima–Kinyara–Kafu High Voltage Power Line
Location
CountryUganda
Coordinates01°25′14N 31°22′22E / 1.42056°N 31.37278°E / 1.42056; 31.37278
General directionWest to East
FromHoima, Uganda
ToKafu, Uganda
Ownership information
OwnerGovernment of Uganda
PartnersThe World Bank Group
OperatorUganda Electricity Transmission Company Limited
Construction information
Expected2023
Technical information
Type of currentAC
Total length92 km (57 mi)
AC voltage220kV
No. of circuits2

The Hoima–Kinyara–Kafu High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Kabaale, Buseruka sub-county, Hoima District, in the Western RegionofUganda to another high voltage substation at Kafu, Nakasongola District, in the Central Region of Uganda. On the way, the power line passes through Kinyara Sugar Works, in Masindi District.[1]

Location[edit]

The power line starts in the village of Kabaale, Buseruka sub-county, Hoima District, in the Western Region of Uganda, at a 220kV substation there. The power line would travel in a general north-easterly direction to the Kinyara Sugar Works, in Masindi District, through another 220kV substation there, and continue on to terminate at Kafu, in Nakasongola District, at a 220kV substation that is connected to the Karuma–Kawanda High Voltage Power Line,[1] a total distance of 92 kilometres (57 mi).[2]

Overview[edit]

This power line is intended to increase and strengthen the supply of grid electricity to the Western Region of Uganda. The four main objectives are as follows:

The first objective is to connect the region to the 600 megawatts Karuma Hydroelectric Power Station through the connection at Kafu.[1]

The second objective is to pick up co-generation at Kinyara Sugar Works, where energy production is expected to be stepped up from 14 megawatts to 45 megawatts.[1]

The third objective is to pick up any power from the Hoima oil fields, including the proposed 100 megawatts natural gas-fired Nzizi Thermal Power Station.[1]

The fourth objective is to bring power to the Hoima Metropolis including the Uganda Oil Refinery, the Kabaale International Airport, the city of Hoima and the Ugandan end of the East African Crude Oil Pipeline. At its southern end, in Hoima District, this transmission line will connect to the existing 226 kilometres (140 mi), 220kV Nkenda–Fort Portal–Hoima High Voltage Power Line, which was completed in 2018.[3]

Construction[edit]

As of 2018, this power line was marked as "Under Procurement". Funding is expected through a loan from the International Development Association, a member of the World Bank Group.[4]

See also[edit]

References[edit]

  1. ^ a b c d e NEK Consults Limited (June 2017). "Hoima–Kinyara 220kV Transmission Line And Substations: Hoima–Kinyara Updated ESIA Report" (PDF). Kampala: The World Bank. Retrieved 17 April 2019.
  • ^ UETCL (2018). "Project Status Brief For PR". Kampala: Uganda Electricity Transmission Company Limited (UETCL). Retrieved 18 April 2019.
  • ^ UETCL (14 August 2018). "Happening today, commissioning of the Nkenda–Fort Portal–Hoima 220kV transmission line, at the Nkenda Substation in Kasese". Kampala: Uganda Electricity Transmission Company Limited (UETCL) via Twitter.com. Retrieved 18 April 2019.
  • ^ Uganda Electricity Transmission Company Limited (March 2018). "The Status of the Power Transmission Projects" (PDF). Powerutilityleadership.com. Retrieved 18 April 2019.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Hoima–Kinyara–Kafu_High_Voltage_Power_Line&oldid=991115345"

    Categories: 
    High-voltage transmission lines in Uganda
    Energy in Uganda
    Proposed electric power transmission systems
    Proposed electric power infrastructure in Uganda
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    EngvarB from April 2019
    Use dmy dates from April 2019
    Coordinates on Wikidata
     



    This page was last edited on 28 November 2020, at 10:01 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki