Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 See also  





3 References  














I-275 Metro Trail







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


I-275 Metro Trail
Wintertime photograph of the snow-covered bike trail
I-275 Metro Trail in Canton, December 2008
Length31.6 mi (50.9 km)
LocationWayne, and Oakland counties
Trailheads2[1]
UseHiking, biking

The I-275 Metro Trail is a bicycle trailinWayne and Oakland counties in the US state of Michigan.

History[edit]

The Michigan Department of Transportation (MDOT) built a bike trail parallel to I-275 in the mid-1970s. This I-275 Bikeway was constructed as a reply to the 1970s energy crisis,[2] along a 31.6-mile (50.9 km) stretch in Monroe, Wayne and Oakland counties.[3] This path is 8 feet (2.4 m) wide and runs at least 30 feet (9 m) from the freeway, fenced off from adjacent landowners. It was not well-maintained originally, but it was being improved in the first decade of the 21st century.[4] There are 24 access points to the trail located at major cross roads along the route.[2] The trail is one of a network approved in June 1974,[5] and the state originally planned it to follow almost all 60 miles (97 km) of I-275 at the time, including the unbuilt segment north of Novi.[6]

Since 2006, the Michigan Trails & Greenway Alliance and MDOT have been working to improve the bike trail.[2] At the time of the alliance's initial studies, the trail was overgrown with vegetation in locations. The study focused on areas of needed improvement after meeting with members of the public in the communities surrounding the bike path.[4] In August 2009, MDOT held an open house to discuss construction work planned to improve the trail.[7] Further impacts by MDOT to the bikeway included closures in 2010 during reconstruction projects underway on the I-275 freeway.[8] Since a grand re-opening in 2011, the bike path has been called the I-275 Metro Trail.[9] In the middle of 2015, MDOT completed reconstruction of the bike trail,[3] resulting in a paved trail from a junction with the Downriver Linked Greenways East–West Trail near South Huron Road northward to 12 Mile Road in Novi.[1]

See also[edit]

References[edit]

  1. ^ a b Rockford Advertising (2016). "I-275 Metro Trail North" (PDF) (Map). Michigan Trails Magazine. Retrieved July 5, 2016.
    Rockford Advertising (2016). "I-275 Metro Trail South" (PDF) (Map). Michigan Trails Magazine. Retrieved July 5, 2016.
  • ^ a b c Michigan Trails & Greenways Alliance. "I-275 Bikeway". Michigan Trails & Greenways Alliance. Archived from the original on November 10, 2010. Retrieved March 3, 2010.
  • ^ a b Rockford Advertising. "I-275 Metro Trail North". Michigan Trails Magazine. Rockford Advertising. Archived from the original on July 2, 2016. Retrieved July 5, 2016.
  • ^ a b Michigan Trails & Greenway Alliance (September 7, 2006). Reviving the I-275 Bikeway: The Potential for Community Enhancement (PDF) (Report). Michigan Trails & Greenway Alliance. Archived from the original (PDF) on July 18, 2011. Retrieved March 3, 2010.
  • ^ "Legislature Backs Bicycle Path Bill". The News-Palladium. Benton Harbor, MI. Associated Press. June 28, 1974. p. 21. OCLC 10117334. Retrieved July 13, 2018 – via Newspapers.com. Open access icon
  • ^ "Bicycle Paths Are Okayed". Holland Evening Sentinel. United Press International. May 9, 1974. p. 13. OCLC 13440201. Retrieved October 15, 2014 – via Newspapers.com. Open access icon
  • ^ Morosi, Rob (August 5, 2009). "MDOT To Hold I-275 Bike Path Construction Open House" (Press release). Michigan Department of Transportation. Archived from the original on December 19, 2009. Retrieved March 3, 2010.
  • ^ Taylor Transportation Service Center (February 11, 2010). "I-275 Corridor Improvements, Wayne County". Michigan Department of Transportation. Archived from the original on June 3, 2010. Retrieved March 3, 2010.
  • ^ Admin (September 15, 2011). "I-275 Grand Re-Opening". Friends of the I-275 Metro Trail. Archived from the original on October 19, 2014. Retrieved June 21, 2014.{{cite web}}: CS1 maint: unfit URL (link)

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=I-275_Metro_Trail&oldid=1079286519"

    Categories: 
    Bike paths in Michigan
    Transportation in Wayne County, Michigan
    Transportation in Oakland County, Michigan
    Hidden categories: 
    CS1 maint: unfit URL
    Articles with short description
    Short description matches Wikidata
     



    This page was last edited on 26 March 2022, at 00:29 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki