Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background  





2 IPD in practice  





3 Multi-Party Agreements  





4 The role of technology in IPD  





5 Criticism  





6 Job Order Contracting  





7 See also  





8 References  



8.1  Selected articles on integrated project delivery  







9 External links  














Integrated project delivery






العربية
Polski
Русский
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Integrated project delivery (IPD) is a construction project delivery method that seeks the efficiency and involvement of all participants (people, systems, business structures and practices) through all phases of design, fabrication, and construction.[1] IPD combines ideas from integrated practice[2] and lean construction. The objectives of IPD are to increase productivity, reduce waste (waste being described as resources spent on activities that do not add value to the end product), avoid time overruns, enhance final product quality, and reduce conflicts between owners, architects and contractors during construction.[3] IPD emphasizes the use of technology to facilitate communication between the parties involved in the construction process.

Background[edit]

The construction industry has suffered from a productivity decline since the 1960s[4][5] while all other non-farm industries have seen large boosts in productivity. Proponents of Integrated project delivery argue that problems in contemporary construction, such as buildings that are behind schedule and over budget, are due to adverse relations between the owner, general contractor, and architect.

Using ideas developed by Toyota in their Toyota Production System and computer technology advances,[6] the new focus in IPD is the final value created for the owner. In essence, IPD sees all allocation of resources for any activity that does not add value to the end product (the finished building) as wasteful.[7]

IPD in practice[edit]

In Practice, the IPD system is a process where all disciplines in a construction project work as one firm. The primary team members include the architect, key technical consultants as well as a general contractor and subcontractors. The growing use of building information modeling in the construction industry is allowing for easier sharing of information between project participants using IPD and is considered a tool to increase productivity throughout the construction process.[3]

Unlike the design–build project delivery method which typically places the contractor in the leading role on a building project, IPD represents a return to the "master builder" concept where the entire building team including the owner, architect, general contractor, building engineers, fabricators, and subcontractors work collaboratively throughout the construction process.

Multi-Party Agreements[edit]

One common way to further the goals of IPD is through a multi-party agreement among key participants. In a multi-party agreement (MPA), the primary project participants execute a single contract specifying their respective roles, rights, obligations, and liabilities. In effect, the multi-party agreement creates a temporary virtual, and in some instances formal, organization to realize a specific project. Because a single agreement is used, each party understands its role in relationship to the other participants. Compensation structures are often open-book, so each party's interests and contributions are similarly transparent. Multi-party agreements require trust, as compensation is tied to overall project success and individual success depends on the contributions of all team members.[8]

Common forms of multi-party agreements include

The role of technology in IPD[edit]

The adoption of IPD as a standard for collaborative good practice on construction projects presents its own problems. As most construction projects involve disparate stakeholders, traditional IT solutions are not conducive to collaborative working. Sharing files behind IT firewalls, large email attachment sizes and the ability to view all manner of file types without the native software all make IPD difficult.

The need to overcome collaborative IT challenges has been one of the drivers behind the growth of online construction collaboration technology. Since 2000, a new generation of technology companies evolved using SaaS to facilitate IPD.

This collaboration software streamlines the flow of documentation, communications and workflows ensuring everyone is working from 'one version of the truth'. Collaboration software allows users from disparate locations to keep all communications, documents & drawings, forms and data, amongst other types of electronic file, in one place. Version control is assured and users are able to view and mark up files online without the need for native software. The technology also enables project confidence and mitigates risk thanks to inbuilt audit trails.

Criticism[edit]

A significant criticism of IPD that the single-minded focus on efficiency is often associated with a lack of concern for employee safety and well-being. This led to a poor safety performance and increased stress levels among construction workers, as they strive reach higher goals with less resources.[7]

Job Order Contracting[edit]

Job Order Contracting, JOC is form of integrated project delivery that specifically targets repair, renovation, and minor new construction. It has proven to be capable of delivering over 90% of projects on-time, on-budget, and to the satisfaction of the owner, contractors, and customer alike.[9]

See also[edit]

References[edit]

  1. ^ "Integrated Project Delivery – A Working Definition" (PDF). American Institute of Architects California Council May 15, 2007. Retrieved 2008-11-13.
  • ^ "* Integrated practice in perspective: A new model for the architectural profession". Architectural Record, May, 2007. Retrieved 2008-11-17.
  • ^ a b "Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry" (PDF). U.S. Department of Commerce Technology Administration, National Institute of Standards and Technology, Aug., 2004. Retrieved 2008-11-18.
  • ^ Allen, Steven G. (February 1985). "Why Construction Industry Productivity is Declining". Steven G. Allen, National Bureau of Economic Research No. 1555, Feb., 1985. Retrieved 2008-11-17.
  • ^ "Construction Productivity in Decline" (PDF). PE Magazine. 2014.
  • ^ "Integrated Project Delivery builds a brave, new BIM world". Building Design+Construction, April 1, 2008. 11 August 2010. Retrieved 2013-11-07.
  • ^ a b "What Is the Criticism of Lean Manufacturing?". www.brighthubpm.com. 2011-02-08. Retrieved 2020-05-20.
  • ^ "Integrated Project Delivery: A Guide" (PDF). American Institute of Architects 2007 version 1. Retrieved 2008-11-13.
  • ^ "JOC Research Report" (PDF).
  • Selected articles on integrated project delivery[edit]

    External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Integrated_project_delivery&oldid=1180441500"

    Categories: 
    Construction
    Building engineering
    Design
    Hidden categories: 
    Wikipedia external links cleanup from July 2019
    All articles with dead external links
    Articles with dead external links from November 2017
    Articles with permanently dead external links
     



    This page was last edited on 16 October 2023, at 17:48 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki