John E. Amos Power Plant






العربية
Deutsch
Français
Norsk bokmål
Suomi
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 38°2829N 81°4916W / 38.47472°N 81.82111°W / 38.47472; -81.82111
 

From Wikipedia, the free encyclopedia
 


John E. Amos Power Plant
John E. Amos Power Plant in 2018
Map
CountryUnited States
LocationWinfield Rd., Winfield, West Virginia
Coordinates38°28′29N 81°49′16W / 38.47472°N 81.82111°W / 38.47472; -81.82111
StatusOperational
Commission dateUnit 1: 1971
Unit 2: 1972
Unit 3: 1973
Owner(s)American Electric Power
Thermal power station
Primary fuelCoal
Turbine technologysupercritical, dry-bottom boilers
Power generation
Nameplate capacity2,933 MW
External links
CommonsRelated media on Commons

John E. Amos Power Plant is a three-unit coal-fired power plant owned and operated by Appalachian Power, a subsidiary of American Electric Power (AEP). With a nameplate rating of 2,933 MW,[1] it is the largest generating plant in the AEP system.[2] It was named after John E. Amos, a prominent state senator, Democratic National Committee member from West Virginia, and member of the AEP board of directors.[3]

Background

[edit]

The plant is located between West Virginia Route 817 (Winfield Road) and the Kanawha River. Coal is delivered to the facility by barge or rail, after which it is stored in the plant's coal yard. The coal yard storage capacity can reach up to 1.75 million tons of coal, while the entire plant consumes an average of 26,000 tons of coal daily at full capacity.[4] The coal is then transported via conveyor belt from the coal yard into the plant, where it is pulverized into a fine, talcum powder-like consistency. Primary fans then blow the ground up coal into boilers where it burns at 1,000 °F (538 °C) to turn water into steam. That steam gets sent into turbines, where it turns blades. These blades act like a windmill and drive a generator that produces electricity at 26,000 volts. Transformers outside the plant step up the voltage to 345,000 volts and 765,000 volts.[4]

Units 1 and 2 are of 816.3 MW nameplate capacity each, and were started up in September 1971, and June 1972 respectively. The boilers off of Units 1 and 2 deliver 5.3 million pounds of steam per hour using 12,500 gallons of water per minute. Containing 6 pulverizers per unit, 120,000 pounds of coal is ground up every hour.[4] Unit 3, rated at 1,300 MW, was started up in October 1973. Unit 3's boiler system delivers 9.775 million pounds of steam per hour. [4] All units are supercritical, dry-bottom boilers powered by a blend of low-sulfur coal and Northern Appalachian Basin high-sulfur coal.[5]

Phil Moye, a spokesman for AEP, said the energy generated at the John Amos Plant is enough to power about 2 million homes.[6] The plant employs around 300 people with a payroll of $27.1 million dollars.[4]

A retirement analysis is to be conducted at Amos with a report due in 2022. The analysis, which will gauge the plant's economic viability and market conditions, is a part of an agreement between Appalachian Power and the Sierra Club.[7]

Environmental mitigation

[edit]

Appalachian Power installed selective catalytic reduction (SCR) on its three units beginning with Unit 3 in 2002, Unit 2 in 2004, and Unit 1 in 2005. The installation of SCRs reduced nitrogen oxide (NOx) emissions by 90%.[8][9] The cost of installing all three SCRs totaled $346 million.[8] The construction of flue-gas desulfurization (FGD) equipment at Amos was a $1.3 billion project completed in 2010. The FGD equipment reduced the plant's sulfur dioxide (SO2) emissions by 95%.[10]

See also

[edit]

References

[edit]
  1. ^ "Existing Electric Generating Units in the United States". Energy Information Administration. 2007. Retrieved 2008-06-19.
  • ^ Line, Les (January 2007). "One Picture". Audubon Magazine. Archived from the original on 2008-05-16. Retrieved 2008-06-20.
  • ^ Young, William L.; John E. Amos (August 6, 1965). "John E. Amos Oral History Interview" (PDF). Oral History Program. John F. Kennedy Library. Archived from the original (PDF) on October 20, 2007. Retrieved 2008-06-25.
  • ^ a b c d e American Electric Power (2018) John E. Amos Plant [Pamphlet]
  • ^ "B&W Awarded Environmental Equipment Contract for AEP'S Amos Plant in West Virginia". Business Wire. 2005-11-04. Retrieved 2008-06-20.[permanent dead link]
  • ^ Speciale, Samuel (March 19, 2017). "Plant continues to churn out power". The Herald Dispatch. Retrieved May 2, 2018.
  • ^ Kercheval, Hoppy (September 21, 2020). "WV Coal Industry Sees Threat in Appalachian Power-Sierra Club Agreement". WV MetroNews. Retrieved September 21, 2020.
  • ^ a b "AEP expands emission control efforts at John Amos plant". POWERGrid International. June 11, 2002. Retrieved September 22, 2020.
  • ^ "AEP to make additional environmental investments at Mitchell, Mountaineer plants in West Virginia". POWERGrid International. February 27, 2004. Retrieved September 21, 2020.
  • ^ Pace, Fred (April 20, 2008). "AEP installing scrubbers at John Amos Plant". The Register-Herald. Retrieved September 21, 2020.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=John_E._Amos_Power_Plant&oldid=1219111189"

    Categories: 
    Energy infrastructure completed in 1971
    Energy infrastructure completed in 1972
    Energy infrastructure completed in 1973
    Coal-fired power stations in West Virginia
    Buildings and structures in Putnam County, West Virginia
    American Electric Power
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    All articles with dead external links
    Articles with dead external links from April 2017
    Articles with permanently dead external links
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Thermal power station articles using Infobox power station
    Commons category link is on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 15 April 2024, at 20:22 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki