Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Titley Junction - Eardisley  





1.2  Kington - New Radnor  







2 Operations  





3 Closure  





4 References  





5 External links  














Kington and Eardisley Railway






Deutsch
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Kington and Eardisley Railway
Overview
Statusclosed
OwnerKington and Eardisley Railway until Great Western Railway buy out in 1897
LocaleHerefordshire
Termini
  • Eardisley
  • Stations8
    Service
    TypeHeavy rail
    Operator(s)Great Western Railway
    History
    Opened3 August 1874 to Eardisley, 25 September 1875 to New Radnor
    Closed1 July 1940 to Eardisley, 31 December 1951 to New Radnor, 1958 remainder of line
    Technical
    Line length13 miles (21 km)
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
  • t
  • e
  • Kington and Eardisley Railway

    New Radnor

    Dolyhir

    Stanner

    border

    Kington
    joint with L&KR

    Titley Junction

    Lyonshall

    Almeley

    Eardisley

    The Kington and Eardisley Railway took over the Kington Tramway, which served the Welsh Marches border town of Kington, Herefordshire. In 1874 it opened a 6 miles 72 chains (11.1 km) line south from Titley Junction to a junction with the Hereford, Hay and Brecon Railway, 5 chains (330 ft; 100 m) east of Eardisley. A year later it replaced the remainder of the tramway with a branch west to New Radnor. Between these two branches it had running powers on the Titley Junction to Kington section of the Leominster and Kington Railway. The Eardisley branch closed in 1940, the New Radnor branch in 1951.

    History[edit]

    The two branches cost £263,459 to build, of which £5,100 was lent by the Great Western Railway (GWR). The company was bought by the GWR on 1 July 1897. Debenture shares were bought for £62 10s per £100 share and ordinary £100 shares for £2.[1]

    Titley Junction - Eardisley[edit]

    When the Hay Tramway was authorised for conversion to a railway in 1859, it was decided that its extension, the Kington Tramway, would also need to be converted. The tramway shares were bought for £45 for each £100 share by an agreement dated 19 December 1861. The Kington and Eardisley Railway Act received Royal Assent on 30 June 1862, authorising the company to raise £100,000, buy and convert the Kington Tramway to standard gauge and build a link from Lyonshall to Marston, which was never built. Thomas Savin, the railway contractor, backed the scheme, though his £16,000 of shares were sold when he went bankrupt in January 1866. Running powers over the Leominster and Kington Railway from Kington to Titley Junction were agreed on 14 April 1868. The line opened on 3 August 1874.[1]

    Kington - New Radnor[edit]

    After the Leominster and Kington Railway opened to Kington in 1857, most of the lime traffic from Burlinjobb (between Dolyhir and Stanner) was transferred from the 3 feet 6 inches (1.07 m) tramway (from 1862 owned by the Kington and Eardisley Railway) to the railway at Kington. The lime traffic was increasing and it was hoped to build a railway to Rhayader and Aberystwyth, so the Kington and Eardisley Railway got an Act for a railway from Kington to New Radnor, mainly parallel to the tramway, on 16 June 1873. It opened on 25 September 1875.[1]

    Operations[edit]

    All the lines were worked by the GWR from their Kington shed using two locos. Initially they were 0-6-0 saddle tanks, then from about 1900 0-4-2 and 2-4-0 tanks, and finally GWR 5800 Class tanks. Passenger trains were formed of three or four coach sets of four wheelers, until eight wheel coaches were introduced in the late 1920s. Both branches were worked on the train staff system.[1]

    Closure[edit]

    The Eardisley branch never carried much regular traffic and closed on 1 January 1917 (the list of stations closed in 1917 shows at least 125 others closed for wartime economy). Its rails were shipped overseas. It reopened with one train a day from Titley to Almeley on 18 September 1922 and fully on 11 December 1922. Wartime brought final closure on 1 July 1940.[1]

    Stanner became an unstaffed halt from April 1938 and coal shortages (explained in a House of Commons speech as due to weather and productivity declines)[2] stopped all passenger trains to New Radnor from 5 February 1951. The line from Dolyhir to New Radnor closed completely from 31 December 1951[1] and the rest of the line in 1958[3]

    References[edit]

    1. ^ a b c d e f Railway Magazine September 1957 pp. 599-605 C. R. Clinker: The railways of West Herefordshire
  • ^ Hansard 1951 Column 1101 speech by Mr. Noel-Baker
  • ^ "Dolyhir Railway Station (418317)". Coflein. RCAHMW.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Kington_and_Eardisley_Railway&oldid=1176431376"

    Categories: 
    Rail transport in Herefordshire
    Great Western Railway constituents
    Railway stations in Great Britain opened in 1874
    Railway stations in Great Britain opened in 1875
    Railway stations in Great Britain closed in 1917
    Railway stations in Great Britain closed in 1940
    Railway stations in Great Britain closed in 1951
    1874 establishments in Wales
    Kington, Herefordshire
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from July 2017
    Use British English from July 2017
     



    This page was last edited on 21 September 2023, at 17:56 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki