Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Description  





2 Power Uprate  





3 Awards  





4 See also  





5 References  





6 External links  














Laguna Verde Nuclear Power Station






Čeština
Dansk
Deutsch
Español
فارسی
Français
Italiano
Norsk bokmål
Русский
Svenska
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 19°4315N 96°2423W / 19.72083°N 96.40639°W / 19.72083; -96.40639
 

From Wikipedia, the free encyclopedia
 


Laguna Verde Nuclear Power Plant
Map
CountryMexico
LocationAlto Lucero, Veracruz
Coordinates19°43′15N 96°24′23W / 19.72083°N 96.40639°W / 19.72083; -96.40639
StatusOperational
Commission date1990 (Unit 1)
1995 (Unit 2)
Owner(s)Mexican Government
Operator(s)Comisión Federal de Electricidad (CFE)
Nuclear power station
Reactor typeBoiling Water Reactors (BWR-5)
Reactor supplierGE
Power generation
Units operational2 reactors
Nameplate capacity1620 MW (2 x 810 MW)
Annual net output4.782 TWh x 2
External links
CommonsRelated media on Commons

The Laguna Verde Nuclear Power Plant (LVNPP) is located on the coast of the Gulf of Mexico, in Alto Lucero, Veracruz, Mexico. It is the only nuclear power plant in Mexico[1] and produces about 4.5% of the country's electrical energy. It consists of two GE Boiling Water Reactors, also known as a BWR-5 reactor, each one with an installed capacity of 682 MW using low enriched uranium (3%) as fuel. Unit-1 (U-1) started its operation on July 29, 1990. Unit-2 (U-2) started its operation on April 10, 1995. Initial architects in 1975 for the plant were Burns and Roe Inc, and later Ebasco Services designed and supervised the project. The steam turbine and other components were manufactured by Mitsubishi Electric. The plant is owned and operated by Comisión Federal de Electricidad (CFE), the national electric company owned by the Mexican government.

Laguna Verde has been considered a strategic facility for the National Power System (SEN) due to its high power generation capacity, lowest operating cost, and frequency and voltage regulation capacity. All the electric power generated is delivered to its single client, the National Energy Control Center (CENACE). CENACE is entrusted with planning, directing, and supervising the transmission and distribution of electric power to end users. CENACE has classified LVNPP as Base Load Power Plant since the beginning of its operations.

The annual generation average for LVNPP in the last five years[when?] has been of 10.5 TWh, electric energy sufficient to meet the demand of more than 4 million inhabitants.

In 2020, the Ministry of Energy authorized the operating license extension of unit 1 for an additional 30 years, to a 60-year lifetime until 2050.[2]

Description[edit]

The generation of electric power at the CLV is based on the technology of nuclear fissionofuranium atoms, which takes place in the reactor. The energy released by the nuclear fission is transferred as heat from the fuel to the cooling water, which boils into steam. The quality of steam is controlled through a separator and dryer. The separator and dryer are part of the internal processes of the reactor pressure vessel. The turbine transforms power from steam (kinetic energy) into mechanical energy causing an electric generator to move (electric power production). Once the steam has gone through the turbine, it is cooled in a condenser; the water obtained in this manner is pumped again toward the nuclear reactor, to restart the generation cycle.

Steam flow rate from each reactor is 3944 kilotons/hour (kt/h) to generate 682 MW of electric power. Both Reactor Units (U1 and U2) operate using 444 enriched uranium assemblies, storing power equal to 38.9 million oil barrels. This nuclear fuel is specifically designed to be admitted into the core of the reactor. The fuel is purchased only from qualified vendors worldwide. After 18 months of operation, between 25% and 30% of the nuclear fuel is replaced. This activity is called "Refueling Outage" process.

Power Uprate[edit]

In 2007, CFE signed a contract with an investment of USD 600 million to increase the original capability of each of the units of Laguna Verde by 20%, equivalent to 255 MW, in order to tend the growth of the demand of electric power in Mexico. This power uprate will allow to LVNPP an additional annual generation of 2.1 TWh, equivalent to the demand of a city of 800,000 inhabitants.

GE and CFE jointly performed the engineering analysis to determine the necessary plant modifications and to support the safety analysis report necessary for approval of the power uprate by the national nuclear regulator, the Comisión Nacional de Seguridad Nuclear y Salvaguardias [es],[3][4]

Work began in 2008 by Iberdrola and Alstom and finished late 2010. The main modifications consist in a turbine and condenser retrofit and the replacement of the electric generator, main steam reheater and the feedwater heater. The budget for the project is USD 605 million.[5]

Awards[edit]

The following table shows the chronologic developments at Laguna Verde.[citation needed]

YEAR EVOLUTION
1976 Implementation of the Quality Assurance Program as part of the international nuclear standard during the construction phase
1982 Implementation of the Quality Assurance Program in the operation phase
1990 Start of Reactor Unit 1 commercial operation
1991 World record broken for reaching 250 days of continuous operation (without interruptions) during the first generation cycle
1995 Start of Reactor Unit 2 commercial operation
1995 Laguna Verde used as a base to institutionalize the Total Quality program at the Comisión Federal de Electricidad (CFE) nationwide
1995 Accreditation of the Environmental Engineering Laboratory by the Mexican Accrediting Entity
1997 For the first time, CFE awards the Total Quality institutional prize, won by the Laguna Verde
1997 ISO 9001:1994 quality standard certification is obtained as part of the Continuous improvement program
1999 ISO 14001 quality standard certification was obtained
1999 Power generation boosted by 5% (sufficient to satisfy the needs of 200,000 persons)
2002 Certification in the Mexican Industrial Safety Standard NMX-SAST-001-IMNC-2000, which is the equivalent of the international OSHAS-18000.
2003 Certification in the ISO 9001:2000 Quality Standard based on process management.
2004 Laguna Verde reached Level-3 in the WANO excellence rating (maximum 1, minimum 5)
2004 to 2007 CLV significantly reduced the duration of refueling outage periods to 27 days
2005 Prize for the Nuclear Power Station with the best performance outside the USA given by WANO/ATLANTA
2005 Approval of the Extended Power Uprate Project (EPU) with an investment of $600 million USD, which will make it possible to increase the installed capacity by 20% compared with the original and which is strategically important to extend the station's useful life up to 50 years
2006 and 2008 Clean Industry biennial certification issued by the Mexican government through the Federal Environment Protection Agency as a result of complying with the 66 environment and safety standards
2006 Laguna Verde reached Level-2 in the WANO excellence rating, the highest level obtained by a nuclear power station outside the United States according to WANO/ATLANTA
2006 Recognition for world-class operation performance in Reactor Units 1 and 2 granted by General Electric
2006 Accreditation of the Metrology Laboratory by the Mexican Accrediting Entity
2007 Environmental Excellence Recognition (the highest award for the environment) obtained by the Mexican government because of high sustainability in the preservation of natural resources
2008 Laguna Verde obtains National Quality Prize 2007, which the highest recognition for policy and strategy quality and execution in congruence with the competitiveness and sustainability results obtained
2008 to 2009 Annual recognition as a Socially Responsible Enterprise awarded by the Mexican Centre for Philanthropy in compliance with ethical values, community support and respect and care for the environment
2009 Iberoamerican Quality Prize 2009 obtained, the highest award given by the Fundación Iberoamericana para Gestión de la Calidad (FUNDIBEQ/Iberoamerican Quality Management Foundation)
2010 Laguna Verde Manager receives the Nuclear Excellence Recognition delivered by WANO during Biennial Meeting, for promoting leadership that makes an extraordinary contribution to the promotion of Safe Operation Excellence at nuclear power stations

Laguna Verde has obtained several awards. The plant received the National Quality Award (IFCT 2007), and Golden Award from Iberoamerican Foundation for Quality Management (FUNDIBEQ 2009).

In 2009, Laguna Verde obtained Annual recognition as a Socially Responsible Enterprise awarded by the Mexican Center for Philanthropy.[citation needed]

See also[edit]

  • iconEnergy portal
  • Nuclear technology portal
  • References[edit]

    1. ^ "Nuclear Power in Mexico". World-Nuclear.org. World Nuclear Association. Retrieved April 7, 2015.
  • ^ "Mexico's Laguna Verde plant relicensed for 30 years". World Nuclear News. 20 July 2020. Retrieved 20 July 2020.
  • ^ Comisión Nacional de Seguridad Nuclear y Salvaguardias
  • ^ GE Energy's Nuclear Business Wins Contract to Boost Mexico Nuclear Plant's Output
  • ^ Laguna Verde Power Uprate and Modernization Project Archived 2011-07-13 at the Wayback Machine
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Laguna_Verde_Nuclear_Power_Station&oldid=1213090591"

    Categories: 
    Nuclear power stations in Mexico
    Buildings and structures in Veracruz
    Veracruz (city)
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Webarchive template wayback links
    Articles with short description
    Short description is different from Wikidata
    Articles with a promotional tone from June 2018
    All articles with a promotional tone
    Articles needing additional references from March 2011
    All articles needing additional references
    Articles with broken or outdated citations from November 2022
    All articles with broken or outdated citations
    Articles with multiple maintenance issues
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Nuclear power station articles using Infobox power station
    All articles with vague or ambiguous time
    Vague or ambiguous time from July 2020
    All articles with unsourced statements
    Articles with unsourced statements from March 2011
    All articles with dead external links
    Articles with dead external links from December 2017
    Articles with permanently dead external links
    Pages using the Kartographer extension
     



    This page was last edited on 11 March 2024, at 02:55 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki