Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Service  





2 References  














Limebank station







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 45°1635N 75°4006W / 45.27639°N 75.66833°W / 45.27639; -75.66833
 

From Wikipedia, the free encyclopedia
 


Limebank

General information
Coordinates45°16′35N 75°40′06W / 45.27639°N 75.66833°W / 45.27639; -75.66833
Owned byOC Transpo
PlatformsSide platforms
Tracks2
Construction
Structure typeElevated
AccessibleYes
Other information
Station code3068
History
Opening2024
Future services
Preceding station OC Transpo Following station
Terminus Line 2
Reopens 2024
Bowesville
toward Bayview

Limebank is an under construction terminal station on the Trillium LineinOttawa, Ontario. When constructed, it will be the southern terminus of the Stage 2 O-Train expansion and is scheduled for completion in 2024. The station will be elevated with two side platforms and is located southwest of the intersection of Limebank and Earl Armstrong roads.[1][2] OC Transpo Rapid bus routes 74 and 99 will connect to this station once revenue service begins in 2024.[3]

This station will serve the Riverside South community within an expansive area zoned for commercial and retail purposes. As with the Bayview terminus station, it will feature a public washroom. When the Line 2 expansion becomes operational, OC Transpo Route 73 and OC Transpo Route 74 will be extended east from Nepean Woods station and Leikin station along Strandherd and Earl Armstrong, with a stop at Riverview station, before ending at Limebank station.[3] OC Transpo Route 99 will also be shortened with its eastern terminus being moved to Limebank station. Route 99 service east of Limebank station will be replaced by Line 2.

As of May 2023, under the City of Ottawa's Transportation Master Plan (TMP), the undeveloped-yet-protected transit corridor linking Limebank station with Riverview station and the park-and-ride to the west is slated to be used for a bus rapid transit (BRT) corridor. Despite this, there were growing local calls to zone this corridor for a future Line 2 LRT extension in the next version TMP, which was due to be published in late 2023 or early 2024.[citation needed]

Service

[edit]

The following routes are planned to serve Limebank station

Stop Routes
O-Train (north)
Future routes  R2   70   73   74   99   110   198   283   299 

References

[edit]
  1. ^ Porter, Kate (December 3, 2019). "Stage 2 LRT work means chopping trees, moving roads". CBC News. Retrieved May 5, 2020. The latest design for Limebank Station in Riverside South will see the train run above the road
  • ^ "Trillium Line South Extension". ottawa.ca. November 19, 2019. Retrieved May 2, 2020.
  • ^ a b "OC Transpo to keep parallel bus service through the first winter when Trillium Line launches". Ottawa. 2023-05-26. Retrieved 2023-05-28.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Limebank_station&oldid=1230107138"

    Categories: 
    Trillium Line stations
    Railway stations scheduled to open in 2024
    O-Train stations
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Coordinates on Wikidata
    All articles with unsourced statements
    Articles with unsourced statements from May 2023
     



    This page was last edited on 20 June 2024, at 17:52 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki