Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Planning  



1.1  Stations  







2 References  














Line 24 (Guangzhou Metro)







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Line 24
 24 
Overview
Native name广州地铁24号线
StatusUnder construction
OwnerCity of Guangzhou
Termini
  • Sun Yat-sen Memorial Hall
  • Stations18
    Service
    TypeRapid transit
    SystemGuangzhou Metro
    Services1
    Operator(s)Guangzhou Metro Corporation
    Technical
    Line length31.7 km (19.70 mi)
    Number of tracks2
    CharacterUnderground
    Track gauge1,435 mm (4 ft 8+12 in)
    Operating speed100 km/h (62.14 mph)

    Route map

    Huadu Railway Station (left)

    Guangzhou North Railway Station
     9 

    Xiuquan Park

    Huadu Lake

    Yayao

    Yayuan

    Dongjing

    Yayao Depot

    Shenshandong

    Shuili

    Connection to Line 8

    Jiangfu
     8 

     8  Down arrow to Lianhua

    Liuxi River

    Taoyuan

    Tangge Stabling Yard

    Junhe

    Baiyun Dalang

     22  Up arrowtoAirport North (Terminal 2)

    Xiamao
     22 

    Huangshi
    Line reservation

    Line reservation

    Baiyun Railway Station
     12   22 

    Connection to Line 12

    Tangjing

    Yuanjing

    Ziyuangang
     11 

     11 
    Left arrow anti-clockwise
    clockwise Right arrow

    Sun Yat-sen Memorial Hall
     2   13 

     13 
    Left arrow to Chaoyang
    toXinsha Right arrow

  • talk
  • edit
  • Line 24 drawn to scale

    Line 24ofGuangzhou Metro is an under construction rapid transit line in Guangzhou, Guangdong Province, China. The whole line runs roughly from northtosouth, connecting Huadu District, Baiyun District, Yuexiu District and Haizhu District, and connects two railway hubs, Guangzhou North railway station and Guangzhou Baiyun railway station.[1] Line 24 will use 6-car Type A trains similar to Line 8.[2]

    Planning[edit]

    In 2014, the Guangzhou Municipal Planning Bureau revealed that it was studying the extension of Line 8 through to Jianggao station, and then along National Highway 107 to Guangzhou North Railway Station in Huadu District. This section was known as the North-North Extension of Line 8 as it was the north extension of the first North Extension project of Line 8 that brought the line up to Jiaoxin station. The project was approved by the National Development and Reform Commission in late March 2017. However, project was somewhat controversial as experts and the public have expressed doubts about the extension plan from an operations perspective, as with the completion of the North-North Extension, the total length of Line 8 from Guangzhou North Station to Wanshengwei station will exceed 50 kilometers. Being that the maximum operating speed of Line 8 is only 80 kilometers per hour and the entire line has moderate stop spacings, it was questioned whether a normal subway line should be this long.[3] In response to these concerns, planners decided to reserve for the line to be split at Jiangfu Station, leaving the Jiangfu to Guangzhou North Station section to spun off from Line 8 extended south as an independently operated new line also known as Line 24.[4][5]

    The latest plans for Line 24 show the line running from Guangzhou North to Jiangfu Stations, taking over most of the North-North Extension of Line 8 project outright, and continuing south to Sun Yat-sen Memorial Hall station. The first section of Line 24 is planned to start construction in 2021 and be completed in 2025.[2] In the future Line 24 will be extended further south to Shixi station.[6][7]

    Line 24 is part of Phase 3 adjustment plan of Guangzhou Metro, now under review by the National Development and Reform Commission as of September 2022.[8]

    However, according to the latest environmental impact assessment announcement, Line 24 is used as an extension of Line 8 to announce the line design information. The part to the north of Jiangfu Station is taken as part of the further north extension of Line 8, and the part to the south of Jiangfu Station is taken as the "Subline of the North Extension of Line 8". Even so, the line specifications of these two parts are still configured according to the separate Line 24.[9][10][11][12]

    Stations[edit]

    Project name Station name Connections Location
    English Chinese
    Main line of the North Extension of Line 8 Guangzhou North Railway Station 广州北站  9  Huadu
    Xiuquan Park 秀全公园
    Yayao 雅瑶
    Yayuan 雅源
    Dongjing 东镜
    Shenshandong 神山东 Baiyun
    Shuili 水沥
    Jiangfu 江府  8 
    Subline of the North Extension of Line 8 Taoyuan 桃源
    Junhe 均禾
    Baiyun Dalang 白云大朗
    Xiamao 夏茅  22 
    Huangshi 黄石
    Baiyun Railway Station 白云站  12   22 
     8  (via Shitan)
    Guangzhou Baiyun railway station GBA
    Tangjing 棠景
    Yuanjing 远景
    Ziyuangang 梓元岗  11 
    Sun Yat-sen Memorial Hall 纪念堂  2   13  Yuexiu

    References[edit]

  • ^ a b 赵小满 (2020-12-13). "重磅!广州地铁24号线计划明年动工!". huacheng.gz-cmc.com. Retrieved 2021-12-26.
  • ^ "广州日报 - 2014年716日 - A16:身边纸·关注版 - 8号线还要再延长?". 2014-07-16. Archived from the original on 16 July 2014. Retrieved 2021-12-26.
  • ^ "最新!广州地铁八号线,"两端"都要延长!_媒体_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2021-12-26.
  • ^ "广州地铁 全程为你--信息公示". 2020-09-16. Archived from the original on 16 September 2020. Retrieved 2021-12-26.
  • ^ "多条地铁新线拟"变身":24号线或成又一南北大动脉,10号线设支线通往佛山_广州日报大洋网". 2019-02-17. Archived from the original on 17 February 2019. Retrieved 2021-12-26.
  • ^ "广州8条新地铁重磅曝光!站点逐一列明,以后没那么挤了!_手机新浪网". 2019-02-19. Archived from the original on 19 February 2019. Retrieved 2021-12-26.
  • ^ "广州地铁24号线、8号线北延江府段正纳入建设规划调整向国家申报". 2022-09-20. Archived from the original on 2022-11-01.
  • ^ "广州市城市轨道交通8号线北延段工程(滘心~广州北站)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. Archived from the original on 2022-12-11.
  • ^ "广州市城市轨道交通8号线北延段支线工程(江府~纪念堂)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. Archived from the original on 2022-12-11.
  • ^ 王彤 (2019-12-10). "地铁24号线纳入三期调整 争取年内上报国家审批". 新快报. Archived from the original on 2022-12-13.
  • ^ 李天研 (2022-12-21). "8号线北延段速度分两档,快速列车可由广州北站直通纪念堂". 广州日报. Archived from the original on 2022-12-22.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_24_(Guangzhou_Metro)&oldid=1221662488"

    Category: 
    Guangzhou Metro lines
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Articles containing Chinese-language text
     



    This page was last edited on 1 May 2024, at 07:10 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki