Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Opening timeline  





2 Stations (northwest to southwest)  





3 References  














Line 5 (Tianjin Metro)









 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Line 5
Line 5 train leaving Wenhuazhongxin station
Overview
StatusOperational
OwnerTianjin
LocaleTianjin, China
Termini
  • Liqizhuangnan
  • Stations28
    Service
    TypeRapid transit
    SystemTianjin Metro
    Services1
    Operator(s)Train Service Center III, Tianjin Rail Transit Group Corporation
    History
    Opened22 October 2018; 5 years ago (2018-10-22)
    Technical
    Line length34.8 km (21.62 mi)[1][2]
    Number of tracks2
    CharacterUnderground, At-grade, & Elevated
    Track gauge1,435 mm (4 ft 8+12 in)

    Line 5 of the Tianjin Metro (Chinese: 天津地铁5号线; pinyin: Tiānjīn Dìtiě Wǔ Hào Xiàn) is a rapid transit line running semi-circular from north-west to south-west Tianjin. It is run by Tianjin Binhai Mass Transit Development Co., Ltd, which becomes a subsidiary of Tianjin Rail Transit Group Corporation since 2017.

    The line is 34.8 km[1][2] in length and has 28 stations. Beichenkejiyuanbei is half-underground. Liqizhuangnan is at-grade. All other stations are underground. The line uses 6 car B size trains. Line 5, together with Line 6 forms a loop around Tianjin.

    Opening timeline[edit]

    On 22 October 2018, the section from Danhebeidao to Zhongyiyifuyuan (26 stations) became operational. On 31 January 2019, the line was extended one station to Beichenkejiyuanbei. On 7 December 2021, the line was extended one station to Liqizhuangnan.[3]

    Segment Commencement Length Station(s) Name
    Danhebeidao — Zhongyiyifuyuan 22 October 2018 34.8 km[1][2] 26 (initial section)
    Beichenkejiyuanbei — Danhebeidao 31 January 2019 1 one-station extension
    Zhongyiyifuyuan — Liqizhuangnan 7 December 2021[3] 1 one-station extension

    Stations (northwest to southwest)[edit]

    Station name Connections Bus Connections Distance
    km
    Location
    English Chinese
    Beichenkejiyuanbei 北辰科技园北 Beichen
    Danhebeidao 丹河北道
    Beichendao 北辰道 764 850 909
    Zhiyedaxue 职业大学
    Huaihedao 淮河道 27 334 343 733 740 743 803 811 812 813 910
    Liaohebeidao 辽河北道 733 743 803 811 812 813 910
    Yixingfubei 宜兴埠北 150 160 182 195 619 641 670 671 675 733 749 811 812 908
    Zhangxingzhuang 张兴庄  3  675 852
    Zhichenglu 志成路 675
    Siyuanlu 思源路 Hebei
    Jianchangdao 建昌道 1 602 633 679 869
    Jinzhonghedajie 金钟河大街  6   Z2  602 633 646 679 701 702 804 868 870 Dongli/Hebei
    Yueyahe 月牙河 15 353 602 608 609 679 902 911 Hebei
    Xingfugongyuan 幸福公园 22 315 602 608 842
    Jingjianglu 靖江路  2  32 35 327 353 602 622 635 660 663 689 861 907 Hedong
    Chenglindao 成林道  4  30 35 42 47 47区 48 48区 353 516 608 639 640 656 665 666 681 827 836 847 856 866 905 912 916 963
    Jintanglu 津塘路 28 185 511 608 621 643 656 665 676 806 847 856 862 905 962
    Zhigu 直沽  9  92 359 511 608 665 668 678 760 840 860 962
    Xiawafang 下瓦房  1   8  3 20 175 186 369 511 608 631 641 652快线 659 659区间 665 668 685 688 760 846 860 867 868 962 963 通勤665 专线678 Hexi
    Xi'nanlou 西南楼 47 47区 48 48区 95 175 529 604 606 619 632 657 682 697 698 803 835 855 857 866 872 908 953 954 963
    Wenhuazhongxin 文化中心  6   11   Z1  511 529 606 619 636 641 655 662 675 682 800 803 826 838 857 859 866 906 912 953 通勤826 通勤838 通勤912
    Tianjinbinguan 天津宾馆  6  13 511 608 619 628 668 675 682 857 859 866 953
    Zhongliuyiyuan 肿瘤医院  6   7  8 13 511 608 619 668 682 685 697 704 835 901 963
    Tiyuzhongxin 体育中心 8 52 162 301 306 349 761 Nankai
    Lingbinlu 凌宾路 870 Xiqing
    Changlinglu 昌凌路  10  349 712 713 753 953
    Zhongyiyifuyuan 中医一附院 713 753
    Liqizhuangnan 李七庄南
    Jinghua East Road 京华东道  jinjing 

    References[edit]

    1. ^ a b c "开始试乘体验 天津地铁5号线开通在即". 2018-10-18.
  • ^ a b c "天津地铁5号线开通试运营". 2018-10-22.
  • ^ a b "天津地铁5号线李七庄南站7日开通运营". 2021-12-05.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_5_(Tianjin_Metro)&oldid=1230922256"

    Categories: 
    Tianjin Metro lines
    Railway lines opened in 2018
    2018 in Tianjin
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Articles containing simplified Chinese-language text
    Articles containing Chinese-language text
     



    This page was last edited on 25 June 2024, at 12:48 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki