Line M101 | |
---|---|
![]()
Construction site of Beijing Dajuyuan station
| |
Overview | |
Status | Under construction |
Locale | Tongzhou district Beijing |
Termini |
|
Stations | 14 |
Service | |
Type | Rapid Transit |
System | Beijing Subway |
Operator(s) | Beijing MTR Corp. Ltd.[1] |
Depot(s) | Fuhaocun[2] |
Rolling stock | 3 car Type A, reservations for 3+3 car Type A in the future[3] |
History | |
Planned opening | 2027; 3 years' time (2027) (planned) |
Technical | |
Line length | 18.1 km (11.2 mi)[2][3] |
Character | Underground |
Operating speed | 100 km/h (62 mph) |
Line M101 of the Beijing Subway (Chinese: 北京地铁M101线; pinyin: Běijīng Dìtiě M101 Xiàn) is a rapid transit line under construction in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawandong station. It is fully underground. It is scheduled to open in 2027.[3][4] The line will be 18.1 kilometres (11.2 mi) in length with 14 stations.[3][2]
Station name | Connections[3] | |||||
---|---|---|---|---|---|---|
English | Chinese | |||||
Shangwuyuan | 商务园 | |||||
Tongzhou West Railway Station | 通州西站 | M102 (under planning) | ||||
Tongshun Lu | 通顺路 | |||||
Tongzhou Huiyi Zhongxin | 通州会议中心 | |||||
Longwangzhuang | 龙旺庄 | |||||
Tonghu Dajie | 通胡大街 | M103 (under planning) | ||||
Yudaihe Dajie | 玉带河大街 | |||||
Beijing Sub-Center Railway Station | 城市副中心站 | Pinggu (U/C) 6 (via Beiyunhedong) | ||||
Xingzheng Bangong Xiqu | 行政办公西区 | |||||
Beijing Dajuyuan | 北京大剧院 | M104 (under planning) | ||||
Tiyu Zhongxin | 体育中心 | |||||
Zhangjiawanxi | 张家湾西 | |||||
Zhangjiawan | 张家湾 | M102 (under planning) M104 (under planning) | ||||
Zhangjiawandong | 张家湾东 | |||||
Public transportation in Beijing
| |||||||
---|---|---|---|---|---|---|---|
![]() ![]() |
| ||||||
![]() |
| ||||||
![]() (Beijing Suburban Railway) |
| ||||||
CR C/G-train (intercity railways) |
| ||||||
![]() |
| ||||||
Other urban transit |
| ||||||
Transportation hubs |
| ||||||
|