Name | Community | Coordinates | Type | Capacity (MW) | Year completed | River | Ref |
---|---|---|---|---|---|---|---|
Roseires | Ad-Damazin | 11°47′56″N 34°23′17″E / 11.79889°N 34.38806°E / 11.79889; 34.38806 (Roseires Dam) | Reservoir | 280 MW | Blue Nile | [2] | |
Merowe | 18°40′08″N 32°03′09″E / 18.66889°N 32.05250°E / 18.66889; 32.05250 (Merowe Dam) | Reservoir | 1,250 MW | 2009 | Nile | [3] | |
Shereyk | Reservoir | 350 MW Prop. | Proposed Not Installed | Nile | [4] | ||
Upper Atbara and Setit | 14°14′58.2″N 35°55′47.7″E / 14.249500°N 35.929917°E / 14.249500; 35.929917 (Atbara and Setit Dam) | Reservoir | 320 MW Prop. | 2017- Proposed | [5] | ||
Kajbar | Reservoir | 300 MW Prop. | Proposed Not Installed | Nile | [6] | ||
Jebel Aulia | Jabal Awliya | 15°14′19″N 32°28′37″E / 15.23861°N 32.47694°E / 15.23861; 32.47694 (Jabal Awlia Hydroelectric Power Plant) | Reservoir | 35 | 1937 | ||
Sennar | Reservoir | 15 | 1925 | Nile | [7] | ||
Khashm el-Girba | 14°55′31.2″N 35°54′26.6″E / 14.925333°N 35.907389°E / 14.925333; 35.907389 (Khashm el-Girba Dam) | Reservoir | 10 | 1964 |
Name | Community | Coordinates | Type | Capacity (MW) | Year completed | Ref |
---|---|---|---|---|---|---|
Um-Dabakir | Kosti | Crude Oil(STEAM TURBINES) | 500 MW | 2016 | [8] | |
El Jaili | Garri Expansion 1&2 | 16°07′12″N 32°41′31″E / 16.12000°N 32.69194°E / 16.12000; 32.69194 (El Jaili CCGT Power Station) | Combined Cycle Gas Turbine | 410 MW | 2007 | [9] |
Garri expansion 3. | Gas turbines | 450 MW | Under Const. | |||
Garri expansion 4. | Coke | 100 MW | ||||
Khartoum Noth S. | Kafouri | Steam turbine | 380 MW | |||
Khartoum Noth G. | Gas Turbine | 180 MW | ||||
Port sudan | Diesel |