Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  



























Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Route  





2 History  



2.1  Opening dates  





2.2  Unfulfilled plans  





2.3  2015 incident  





2.4  Smart motorway conversion  







3 Junctions  





4 Nearby attractions  





5 See also  





6 References  





7 External links  














M27 motorway






Deutsch
فارسی
Italiano
Lombard
Nederlands
Simple English
Svenska
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 

















Route map: 


From Wikipedia, the free encyclopedia
 


M27 shield

M27

Map

M27 highlighted in blue
Route information
Maintained by National Highways
Length27.9 mi (44.9 km)
Existed1972–present
HistoryConstructed 1972–83
Major junctions
West endCadnam
50°55′06N 1°35′35W / 50.9182°N 1.5930°W / 50.9182; -1.5930 (M27 motorway (western end))
Major intersections
J3 → M271 motorway

J4 → M3 motorway

J12 → M275 motorway
East endPortsmouth
50°50′12N 1°03′54W / 50.8366°N 1.0650°W / 50.8366; -1.0650 (M27 motorway (eastern end))
Location
CountryUnited Kingdom
Primary
destinations
Southampton, Fareham, Portsmouth, (Ringwood), (Bournemouth), (Poole), (Salisbury), (Winchester), (Chichester), (Brighton)
Road network
M26 M32
Looking down onto the M27 from Portsdown Hill
M27 Between junctions 5 and 7 (there is no junction 6)

The M27 is a motorwayinHampshire, England. It is 27.9 miles (44.9 km) long and runs between Cadnam and Portsmouth. It was opened in stages between 1975 and 1983, providing the largest two urban areas in Hampshire (Southampton and Portsmouth) with a direct motorway link. An extension into the county of West Sussex was planned but never constructed.[1] A number of smaller motorways were proposed, connecting the city centres of Southampton and Portsmouth to the motorway;[2] of these only the M271 and M275 were built. Three sections of the M27 have since been widened to four lanes each way, the first between junctions 7 and 8, the second between junctions 3 and 4, and the third begins at the slip road where junction 11 joins until mid-way to junction 12.

Route[edit]

Running approximately parallel both to the coast of the Solent and to the A27, the M27 starts as an eastwards continuation of the A31 from Bournemouth and Poole, at Cadnam in the New Forest. The motorway meets the A36 from Salisbury, crosses the Wessex Main Line railway, and then meets the M271 to central Southampton. After the M271, the road becomes a dual four lane motorway and passes Rownhams services, it then meets the M3, (two lanes going off, two lanes continuing to the other side of the junction) reverting to a dual three lane motorway as it passes to the north of Southampton, passes Southampton Airport, meeting junction 7 and becoming dual four lanes again, then becoming dual three lanes after junction 8, it then runs alongside the West Coastway Line as it heads south-east towards Fareham. It then runs alongside the northern outskirts of Fareham, briefly with a fourth climbing lane in either direction, before its junction with the M275toPortsmouth. Very shortly after this point the motorway ends, becoming the A27, a four lane dual carriageway almost to motorway standards until the junction with the A3 (M) motorway. The official reason for this section of road not being a continuation of the motorway is the hard shoulders being too narrow. Although the M275 which the M27 junctions with, has no hard shoulders along its entire length.

History[edit]

Opening dates[edit]

The M27 was opened in stages (in common with many UK motorways) between 1975 and 1983.[3]

The South Stoneham Crematorium, which was located north of South Stoneham Cemetery, was demolished during 1973 to make way for the construction of the M27 motorway. The South Stoneham garden of remembrance is now located at the north end of the cemetery, adjacent to the motorway.[4]

Unfulfilled plans[edit]

It has been said[clarification needed] that the M27 was intended as a motorway connecting south coast towns from PenzancetoRamsgate.[5] However the only proposal of a route similar to that was by the Institution of Highway Engineers in 1936.[1][6][7] Road developments in the New Forest are also restricted due to its national park status.

The M27 was meant to be extended to Chichester; a sign of this is the width of the A27 road between junction 12 and the junction with the A3(M), which has three or four lanes, a hard shoulder and grade-separated junctions. It is not part of the M27 as its hard shoulders are not quite wide enough to comply with motorway regulations.[1][8]

The M272 was meant to go from junction 5 through Portswood to the centre of Southampton. The M272 was instead built (in much-reduced form) as the A335 Thomas Lewis Way.[9]

Junction 6 was never built – there were plans for a motorway spur (probably to be numbered M273) connecting the M27 to the centre of the Townhill Park area of Southampton.[2]

A planned service area just east of junction 9 was never constructed. The long westbound exit slip road at junction 9 was designed to allow an entry to and exit from the service area.[10]

2015 incident[edit]

In November 2015, an elderly woman died after falling from the A3057 bridge that crosses over the M27, into westbound traffic, just before junction 3. She had not taken her anti-psychotic medication, and escaped from her Southampton home through an upstairs window before climbing off the garage roof and running away.[11][12]

Smart motorway conversion[edit]

In March 2018, work began to convert the section between junctions 11 and 4 to a smart motorway. The scheme will turn the hard shoulder into a permanent fourth running lane, adding refuge areas along the route and installing new CCTV and speed cameras with mandatory variable speed limit signs.

In early January 2019, official work began when average speed cameras were switched on between junctions 5 and 4. Average speed cameras further along on the scheme will be turned on as work continues along the route. The work has suffered repeated delays, originally due to be complete in Spring 2021. The commissioning phase began in mid February 2022, during which time the smart motorway technology will be tested, including stopped vehicle detection radars. This is with a fully open carriageway and a 60 mph (97 km/h) speed limit controlled by electronic signs on new gantries and CCTV and speed cameras. The 60 mph limit was lifted on 29 June 2022 when the upgraded section was fully opened and returned to the national speed limit.[13]

Junctions[edit]

Data from driver location signs are used to provide distance and carriageway identifier information.[14] Where a junction spans several hundred metres and start and end points are available, both are cited.

M27 motorway junctions
miles km Westbound exits (B carriageway) Junction Eastbound exits (A carriageway) Coordinates
0.0
1.2
0.0
2.0
Road continues as A31toThe WEST, Poole, Bournemouth and Ringwood Terminus
J1
Cadnam A336, Brook, Bramshaw B3079, Lyndhurst A337
50°55′14N 1°35′23W / 50.9205°N 1.5896°W / 50.9205; -1.5896 (M27, Junction 1)
The New Forest, Cadnam, Lyndhurst A337
Start of motorway
4.2
4.6
6.8
7.4
Salisbury A36, Fawley A326 J2 Salisbury, Romsey A36, Fawley A326, Paultons Park 50°56′45N 1°31′46W / 50.9458°N 1.5295°W / 50.9458; -1.5295 (M27, Junction 2)
6.6
6.8
10.6
11.0
Southampton, The Docks M271(S), Romsey M271(N) J3 Southampton, The Docks M271 50°56′45N 1°28′35W / 50.9458°N 1.4764°W / 50.9458; -1.4764 (M27, Junction 3)
Rownhams Services (Roadchef) Services Rownhams Services (Roadchef) 50°57′26N 1°26′57W / 50.9573°N 1.4492°W / 50.9573; -1.4492 (M27, Rownhams Services)
9.4
9.8
15.2
15.7
The MIDLANDS, London, Winchester M3 J4 The MIDLANDS, London, Winchester M3 50°57′14N 1°24′28W / 50.9539°N 1.4077°W / 50.9539; -1.4077 (M27, Junction 4)
11.7
11.9
18.9
19.2
Southampton, Eastleigh, Airport A335 J5 Southampton, Eastleigh, Airport A335 50°56′58N 1°22′16W / 50.9495°N 1.3712°W / 50.9495; -1.3712 (M27, Junction 5)
Non- existent J6 'Non-existent'
15.5
15.7
24.9
25.2
Hedge End A334 J7 Hedge End, Botley A334 50°55′01N 1°19′03W / 50.9170°N 1.3176°W / 50.9170; -1.3176 (M27, Junction 7)
16.2
17.0
26.0
27.4
Southampton, Hamble, East Docks A3024 J8 Southampton (E), Hamble A3024 50°53′54N 1°18′44W / 50.8984°N 1.3122°W / 50.8984; -1.3122 (M27, Junction 8)
19.9
20.6
32.1
33.1
Fareham (W) A27, Whiteley J9 Fareham (W) A27, Whiteley 50°52′27N 1°15′09W / 50.8743°N 1.2526°W / 50.8743; -1.2526 (M27, Junction 9)
23.2
23.5
37.4
37.8
Alton A32 (No access from A32 to M27) J10 No exit 50°52′00N 1°10′56W / 50.8668°N 1.1823°W / 50.8668; -1.1823 (M27, Junction 10)
24.4
24.7
39.2
39.8
Fareham (C) A27, Gosport (A32) J11 Fareham (C) A27, Gosport (A32) 50°51′36N 1°09′27W / 50.8600°N 1.1576°W / 50.8600; -1.1576 (M27, Junction 11)
27.7
28.1
44.6
45.2
Portsmouth, Ferries M275 J12 Cosham, Paulsgrove, Hilsea A27, Portsmouth (W), Ferries M275 50°50′32N 1°05′34W / 50.8421°N 1.0927°W / 50.8421; -1.0927 (M27, Junction 12)
29.0 46.6 Start of motorway Terminus No exit, access to A3 via J12 50°55′14N 1°35′23W / 50.9205°N 1.5896°W / 50.9205; -1.5896 (M27, Junction 1)
Cosham A3(N), Hilsea A3(S) Road continues as A27toHavant, Portsmouth (E), Chichester, Brighton and London (A3(M))
Notes
  • Distances in kilometres and carriageway identifiers are obtained from driver location signs/location marker posts. Where a junction spans several hundred metres (yards) and the data is available, both the start and finish values for the junction are shown.
  • Coordinate data from ACME Mapper.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Nearby attractions[edit]

Junction 1 is about 1,800 metres (2,000 yd) (2,400 metres (2,600 yd) by road) from The Rufus Stone, where King William II, also known as William Rufus, was killed in what may have been a hunting accident in 1100.[15]

See also[edit]

References[edit]

  1. ^ a b c "M27 Portsmouth-Chichester". Pathetic Motorways.
  • ^ a b "Overall plans for the city". Retrieved 27 January 2007.[permanent dead link]
  • ^ "M27 – The South Coast Motorway and A3(M) Statistics and options". The Motorway Archive Trust. Archived from the original on 11 March 2007. Retrieved 27 January 2007.
  • ^ "South Stoneham Cemetery". Southampton City Council. 13 November 2009. Archived from the original on 16 May 2010. Retrieved 16 November 2009.
  • ^ Marshall, Chris; Le Poidevin, Nigel; McGuire, Dave; Denson, James; Steve; Clive. "CBRD Motorway Database – M27". Retrieved 30 September 2008.
  • ^ "Appendix A". The post war development of highways. Institution of Highway Engineers. 1943.
  • ^ Charlesworth, George (1984). "2". A history of British Motorways. London: Thomas Telford Ltd. ISBN 978-0-7277-0159-6.
  • ^ "M27 – The South Coast Motorway, M271, M275 and A3(M)". Archived from the original on 2 January 2007. Retrieved 25 January 2007. The land acquired for this stretch of the motorway was not quite wide enough – by less than a foot – and the Chief Highway Engineer of the day, quite rightly if a little pedantically, ruled that it didn't conform to motorway standards and must therefore be an all-purpose trunk road.
  • ^ "Pathetic Motorways".
  • ^ "Meon". Motorway services online. Retrieved 28 October 2009.
  • ^ Reporters, The Daily Telegraph (24 October 2016). "NHS care workers did not aid patient in crisis 'as staff about to go home'". The Telegraph.
  • ^ "Bridge fall death a 'wake-up call' for Southern Health". BBC News. 27 October 2016. Retrieved 12 October 2021.
  • ^ "M27 junctions 4 to 11: Smart motorway - Highways England". 15 May 2020.
  • ^ Area 3 Driver Location Signs (map) – Highway Authority, 2009
  • ^ As measured on Google Maps
  • External links[edit]

    KML is from Wikidata

    Retrieved from "https://en.wikipedia.org/w/index.php?title=M27_motorway&oldid=1222256462"

    Categories: 
    Motorways in England
    Roads in Hampshire
    Transport in Hampshire
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from January 2018
    Articles with permanently dead external links
    Articles with short description
    Short description matches Wikidata
    Use British English from May 2014
    Use dmy dates from April 2020
    Pages using gadget WikiMiniAtlas
    Infobox road instances in the United Kingdom
    Wikipedia articles needing clarification from January 2023
    Wikipedia articles needing a junction list from December 2021
    All pages needing cleanup
    Lists of coordinates
    Geographic coordinate lists
    Articles with Geo
    Articles using KML from Wikidata
    Articles with J9U identifiers
    Articles with LCCN identifiers
    Pages using the Kartographer extension
     



    This page was last edited on 4 May 2024, at 21:24 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki