Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Construction  





2 Technical features  





3 Safety  





4 Stations  





5 Rolling stock  





6 See also  





7 References  





8 External links  














M3 (Istanbul Metro)






Deutsch
Español
فارسی
Français
Bahasa Indonesia
Italiano
Русский
Türkçe
Українська

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


M3 Bakırköy Sahil – Kayaşehir Merkez
M3 Alstom Metroplis AM4 Train at Kayasehir Merkez Station
Overview
StatusOperating
OwnerIstanbul Metropolitan Municipality
Line numberM3
LocaleIstanbul, Turkey
Termini
  • Kayaşehir Merkez
  • Stations19[1]
    • 1 under construction
    WebsiteM3
    Service
    TypeRapid transit
    SystemIstanbul Metro
    Services1
    Operator(s)Metro Istanbul A.Ş.
    Depot(s)Olimpiyatköy
    Rolling stock80 Alstom Metropolis[1]
    4 carriages per trainset
    History
    Opened14 June 2013; 11 years ago (2013-06-14)
    Kirazlı - Başakşehir/MetroKent

    8 April 2023; 14 months ago (2023-04-08)
    Başakşehir/MetroKent - Kayaşehir Merkez

    10 March 2024; 3 months ago (2024-03-10)
    Kirazlı - Bakırköy Sahil, except Yıldıztepe
    Technical
    Line length26.7 km (16.6 mi)
    Number of tracks2
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
    Electrification1,500 V DC Overhead line
    Operating speed80 km/h (50 mph)

    Route map

    Kayaşehir Merkez M11 (Istanbul Metro)

    Toplu Konutlar

    Şehir Hastanesi

    Menekşe Deresi

    Onurkent

    MetroKent

    Başak Konutları

    Siteler

    Turgut Özal

    depot

    connection to Line M9

    İkitelli Sanayi Line M9

    İSTOÇ

    Mahmutbey Line M7

    Yenimahalle

    Kirazlı Line M1

    Molla Gürani

    Yıldıztepe

    İlkyuva

    Haznedar

    Bakırköy—İncirli Line M1 İncirli (Metrobus)

    Özgürlük Meydanı Bakırköy railway station

    Bakırköy Sahil İDO
  • talk
  • edit
  • The M3, officially referred to as the M3 Bakırköy Sahil–Kayaşehir Merkez Metro Line (Turkish: M3 Bakırköy Sahil-Kayaşehir Merkez Metro Hattı), is a 26.7-kilometre (16.6 mi), 19-station[1] rapid transit line of the Istanbul Metro system on the European part of Istanbul, Turkey. It operates between Bakırköy Sahil and Kayaşehir Merkez. The M3-line is colored light blue on station signs, route signs and the official rapid transit network map.[1]

    Construction[edit]

    The construction of the line began in 2006 following the signing of the related contract in May of that year. By March 2009, the tunnels were completed. The rolling stock was delivered in January 2010, and in December of the same year, the first test run of the trains was accomplished. The line's operation rights were transferred from the İETT bus authority to Istanbul Ulaşım company in June 2011. After the line signalization system was completely installed in March 2012, test runs began in June 2012.[1] On 11 September 2012 the M3-line started operating unofficially.[2] The M3-line went into service officially on 14 June 2013.[3][4] The Ikitelli-Olimpiyat branch was converted into the M9 in May 29, 2021. The northern extension to Kayaşehir Merkez was opened on 8 April 2023.

    Özgürlük Meydanı, Haznedar, İlkyuva, Onurkent, Toplu Konutlar and Kayaşehir Merkez stations are bored in situ without removing the ground above, while all other underground stations on the line are built by cut-and-cover method, constructed in a shallow trench and then covered over. The line's tunnels are twin tubes. The Kirazlı-Metrokent and Kirazlı-Bakırköy Sahil sections was constructed by tunnel boring machine (TBM).

    Technical features[edit]

    The M3 line is 26.7-kilometre (16.6 mi) long, serving 19 stations in total,[1] with Yıldıztepe station is under construction. The operation control center of the M3-line is situated in MetroKent. The rolling stock and maintenance depots are located in Olimpiyatköy beyond Olimpiyat Parkı Terminal, stretching over an area of (70,000 m2 (750,000 sq ft)). The rolling stock depot is capable of holding 180 cars. The maintenance workshop occupies a covered area of 10,000 m2 (110,000 sq ft).[1]

    The rolling stock was delivered by the French company Alstom. The fully air-contioned cars, costing each 1.149 million, feature seats covered with antibacterial textile material. It is possible to pass from one car to another in a train to enable a homogeneous distribution of the passenger crowd.[5]

    A total of 80 cars, 20 sets of four-car trains, are able to transport up to 70,000 passenger per hour per direction[6] between the operating hours from 6:00 h in the early morning to 0:00 h in the midnight. The ride between the terminals Bakırköy Sahil and Kayaşehir Merkez takes 39 minutes. The trains run every five minutes during rush hours.[1]

    Safety[edit]

    All the stations are equipped with closed-circuit video system for continuous monitoring of the platforms. High-level fire safety systems, which include automatic fire extinguishers and fire exits, are installed in the metro line, where non-flammable and fireproofing materials were used.[1]

    Power supply of the line is provided at two different points. In case of power cut at both supply points, an emergency power system that becomes operational within 15 seconds, ensures running of the trains until the next station. If the backup generator system fails, an uninterruptible power source (UPS) supplies energy for emergency lighting and the electronic devices at the operations control center up to three hours. The signalization of the metro line as well as at the depots and railroad switches, also the vehicle drive-control systems are fully automated. However, they can be handled manually when needed.[1]

    Stations[edit]

    All stations are underground.

    No Station District Transfer Notes
    1 Bakırköy Sahil Bakırköy (Bakırköy Terminal)

    İETT Bus:

    Rauf Orbay St・Ataköy Marina・Galleria・Kennedy St
    2 Özgürlük Meydanı Marmaray (Halkalı - Gebze) Banliyö Train LineHigh Speed Train (YHT) (Bakırköy Train Station)

    İETT Bus: 50B, 71T, 72T, 94A 73B, 76, 76B, 76C, 76V, 76Y, 79B, 89YB, 94Y, 98, 98A, 98AB, 98B, 98D, 98E, 98G, 98H, 98K, 98M, 98MB, 98S, 98T, 98TB, 98Y, 146, E-57

    Bakırköy Özgürlük Square・İncirli St・Yusuf Köksal Park・Bakırköy Anadolu imam hatip high school
    3 İncirli M1ᴀ (Yenikapı - Atatürk Airport) MetroM2 (Yenikapı - Hacıosman & Sanayi Mahallesi - Seyrantepe) MetroMetrobüs

    İETT Bus: 31, 31E, 50B, 71T, 72T, 73, 73F, 76D, 78ZB, 79G, 79Ş, 82, 89, 89A, 89B, 89K, 89M, 89S, 92, 94, 94A, 94Y, 97, 97A, 97BT, 97E, 97KZ, 97T, H-9, HT13, MK97

    Hatice Küçük Park・Bakırköy Adalet Sarayı・İsmail Erak Boulevard・Botanik Park
    4 Haznedar Güngören İETT Bus: 36CY, 92, 97T, 98D, 98G, 98Y, MK97 Güngören Park・Naci Kazım St・Naci Kazım Park
    5 İlkyuva Bahçelievler İETT Bus: 36CY, 92, 98D, 98Y Bağcılar Street・Bahçelievler İSKİ Build
    6 Yıldıztepe Bağcılar İETT Bus: 36CY, 92, 98D, 98S, 98Y Bağcılar St・Kıbrıs St・Bağcılar Anadolu High School・Bağcılar Yıldıztepe Primary School・Hoca Ahmet Yesevi Middle School
    Station Under Construction - Passing
    7 Molla Gürani İETT Bus: 98K, HT10, HT11 Molla Gürani Park・Mehmet Akif Boulevard・Yıldıztepe Park
    8 Kirazlı M1ʙ (Yenikapı - Halkalı) Metro

    İETT Bus: 92K, 98K, HT10, MK42

    9 Yenimahalle İETT Bus: 92, 92B, 92K, 92Ş, 97G, 98D, 98K, HT13 15 Temmuz Şehit Ramazan Sarıkaya Park・Dökumcüler Street
    10 Mahmutbey M7 (Kabataş - Mahmutbey) Metro Line

    İETT Bus: 141K, 141M, 144M, 89C, 89T, 91E, 97E, 97GE, 97M, 98A, 98M, H-1, HT10

    Maslak Street・İnönü Street・Bosna Street
    11 İSTOÇ İETT Bus: 143, 146B, 146K, 146M, 31Y, 76O, 78, 89F, 98M İSTOÇ
    12 İkitelli Sanayi Başakşehir M9 (Ataköy - Olimpiyat) Metro

    İETT Bus: 31Y, 82S MK31

    M9 (Ataköy - Olimpiyat) Metro Free Transfer
    13 Turgut Özal İETT Bus: 31Y, 78B, 78Ş, 82S, 98KM, 146K, 146M, MK31 Evren Sanayi Site・Süleyman Demirel Boulevard
    14 Siteler İETT Bus: 143, 146B, 146K, 146M, 78C, 79E, 82S, 98KM Atatürk Bulvarı
    15 Başak Konutları İETT Bus: 78ZB, 89C, 98, 98KM, 143 Prof.Dr Necmettin Erbakan Street・Başakşehir 1.Etap Yürüyüş Yolu Park
    16 Başakşehir/MetroKent Havaist Bus Transfer・Başakşehir/MetroKent - Habibler Metro Line (Plan)

    İETT Bus: 78, 78BE, 78F, 89C, 98H, 98KM, 146B, MK1, MK22

    Metrokent Residences
    17 Onurkent Başakşehir İETT Bus: 78E, 78F, 78ZB, 89C, 98, 146B, 146K Onurkent Park・Mimar Kemalettin Street・Akif İnan Anadolu İmam Hatip Lİsesi
    18 Şehir Hastanesi İETT Bus: 36F, 78E, 78F, 78Ş, 79B, 79E, 79F, 79FY, 79GE, 79KM, 79KT, 79T, 146BA, 146F, HS1, HS2, MK1, MK2, MK22, MR50 Başakşehir Çam and Sakura City Hospital
    19 Toplu Konutlar İETT Bus: 36AS, 78E,78G, 78Ş, 79B, 79C, 79E, 79F, 79G, 79K, 79KM, 79KT, 79T, 79Y, MK11 Kayaşehir Boulevard・Kayaşehir Millet Bahçesi
    20 Kayaşehir Merkez M11 (Gayrettepe - Istanbul Airport - Halkalı) Metro Line

    İETT Bus: 36F, 78E, 78F, 79F, 79FY, 79GE, 79KM, 79KT, 79M, 146BA, 146F, MK1, MK2

    Kayaşehir Boulevard・Başakşehir Millet Bahçesi

    Rolling stock[edit]

    This line is operated by Alstom trains which are visually similar to the AM5-M2 and AM4-M4 trains also built by Alstom that operate on the Budapest Metro. The main difference is that the Istanbul units are equipped with pantographs for overhead line operation only while the Budapest units are equipped with shoegear for third rail operation only.[1]

    See also[edit]

    References[edit]

    1. ^ a b c d e f g h i j k "M3 Başakşehir Metro Hattı" (in Turkish). İstanbul Ulaşım. Retrieved 2015-12-11.
  • ^ "Başakşehir-Kirazlı Metrosu Açıldı". Duble Yol (in Turkish). 2012-09-11. Retrieved 2013-11-15.
  • ^ "İstanbul'a yeni metro". Sabah (in Turkish). 2013-06-14. Retrieved 2013-11-15.
  • ^ "İstanbullular yeni metro hattına kavuşuyor..." (in Turkish). İstanbul Büyükşehir Belediyesi. 2013-06-13. Retrieved 2013-11-15.
  • ^ "İstanbul'a 68 tane hijyenik metro aracı" (in Turkish). İstanbul Büyükşehir Belediyesi. 2007-10-02. Retrieved 2013-11-15. |
  • ^ "M3 Kirazlı-Olimpiyat-Başakşehir Metro Hattı". www.metro.istanbul. Retrieved 2019-02-14.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=M3_(Istanbul_Metro)&oldid=1228473669"

    Categories: 
    Istanbul Metro lines
    Bağcılar
    Başakşehir
    Railway lines opened in 2013
    2013 establishments in Turkey
    Hidden categories: 
    CS1 Turkish-language sources (tr)
    Articles with short description
    Short description is different from Wikidata
    Transport articles needing translation from Turkish Wikipedia
    Articles containing Turkish-language text
    Official website different in Wikidata and Wikipedia
     



    This page was last edited on 11 June 2024, at 12:32 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki