Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Route  





2 Construction  



2.1  Opposition to east end of line  







3 Stations  



3.1  METRORail line key  







4 Expansion  





5 See also  





6 References  





7 External links  














METRORail Green Line






Русский
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Green Line
Overview
StatusOperating
LocaleHouston, Texas
Termini
  • Magnolia Park Transit Center (east)
  • Stations9
    Service
    TypeLight rail/Streetcar[1]
    SystemMETRORail
    Operator(s)METRO
    Daily ridership4,188 (September 2023)[2]
    History
    OpenedMay 23, 2015[3]
    Technical
    Line length3.3 mi (5.3 km)[4][5]
    CharacterStreet running downtown, exclusive right-of-way elsewhere
    Track gauge4 ft 8+12 in (1,435 mm)
    ElectrificationOverhead cantenary
    Highest elevationStreet level until Altic/Howard Hughes, then returns to street level. Elevated overpass between the streets.

    Route map

    Theater District

    Central Station

    Convention District

    EaDo/Stadium

    Coffee Plant/Second Ward

    Lockwood/Eastwood

    Altic/Howard Hughes

    Cesar Chavez/67th Street

    Magnolia Park Transit Center

    Key

    Tracks shared with Purple Line

    Station
    Transit center

    Transfer station

    Handicapped/disabled access All stations are accessible
  • talk
  • edit
  • The Green Line[6] is a 3.3 mi (5.3 km)[4][5][7] METRORail light rail/streetcar[1] line operated by METROinHouston, Texas, serving the East End area. The first seven-station segment of this line opened on May 23, 2015.[3] The two-station eastern end of this route was delayed due to issues over crossing Union Pacific Railroad tracks, but eventually opened in January 2017.[8][9]

    Route[edit]

    Between Theater District and EaDo/Stadium stations, the Green Line shares tracks with the Purple Line. In downtown, the eastbound track runs along Capitol Street, while its westbound counterpart runs along Rusk Street. On both of these streets, trains operate in mixed traffic using the rightmost lane.[1] Transfers to the Red Line will occur at the Fannin Station. Before crossing I-69/US 59, the 2 tracks converge onto a dedicated right-of-way along the south side of Texas Avenue to EaDo/Stadium Station, which will give access to the BBVA Compass Stadium where the MLS soccer team Houston Dynamo & Texas Southern Tigers football play. East of EaDo/Stadium Station, the Green Line and the Purple Line diverge, with the Purple Line turning south and the East End Line continuing east.

    The Green line continues in a dedicated right-of-way on the south side of Harrisburg Road, which transitions to the center of Harrisburg Road at Middleton Street. It remains in the median to its former eastern terminus at Altic/Howard Hughes Station.

    A six-block-long bridge carries the line over freight rail tracks located on Harrisburg and Hughes, extending the line eastward to the Magnolia Transit Center. Construction of this bridge began in March 2015 and finished in late 2016, with the extension opening on January 11, 2017.[10][11][12]

    Construction[edit]

    Phase I of construction was due to be completed by spring 2012, with Phase II scheduled to be complete by summer 2012,[13] and a planned opening in 2013 or 2014. By fall 2010, it became clear that a late 2013 opening was impossible, and the line would not open until late 2014.[14]

    Problems with non-MetroRAIL construction projects downtown, as well as with the axle-counters used to regulate light rail traffic, subsequently pushed back the opening of the line to April and then May 2015.[15][16]

    Opposition to east end of line[edit]

    As early as about a month after construction began for this line, it was reported that there opposition existed to this line, particularly because of the installation of the six-block-long bridge meant to avoid the freight railroad at the east end of the line.[17] Further opposition to this line arose when area resident began to notice a loss in business in areas where construction was taking place.[18] Subsequently, Metro decided to build the western portion of the line in the meantime, while the construction of the portion of the line between Altic/Howard Hughes Station and Magnolia Transit Center Station was deferred.

    An overpass segment meant to avoid the freight railroad track and to complete the line between Altic/Howard Hughes Station and Magnolia Transit Center is expected to take up to 18 months to complete and broke ground in March, 2015.[19][20][21][22] The bridge was completed in early 2017, and the first train traveled across it on January 9, with regular service beginning on the 11th, which marked the completion of the Green Line to its Magnolia terminus.[8][23]

    Stations[edit]

    The following is a list of stations for the Green Line, listed in order from west to east.[24]

    METRORail line key[edit]

         Red Line
         Purple Line

    Station Opening
    year
    Connections
    METRORail METRO Bus
    Theater District 2015      20, 30, 44, 85, 151, 160/161/162, Park & Ride routes
    Central Station (Capitol/Rusk) 2015           6, 11, 51/52, 137
    Convention District 2015     
    EaDo/Stadium 2015     
    Coffee Plant/Second Ward 2015 29
    Lockwood/Eastwood 2015 80
    Altic/Howard Hughes 2015
    Cesar Chavez/67th Street 2017
    Magnolia Park Transit Center 2017 20, 28, 38, 50, 76

    Expansion[edit]

    A possible expansion for the line would bring it south from the Magnolia Transit Center to converge with the Purple Line at a station yet to be named, and moving along the same right-of-way to Hobby Airport.[25][unreliable source?]

    See also[edit]

    References[edit]

    1. ^ a b c "Station Guide Downtown" (PDF). METRORail. March 7, 2014. pp. 3–4. Retrieved 2014-07-24.
  • ^ "Executive Summary - September 2023". Houston METRO. Retrieved October 21, 2023.
  • ^ a b "Railfest Celebrates New Rail Lines". Metropolitan Transit Authority of Harris County. Retrieved 23 May 2015.[permanent dead link]
  • ^ a b "East End Line (landing page)". METRORail. Retrieved 2015-01-15.
  • ^ a b "METRORail". Metropolitan Transit Authority of Harris County, Texas. Retrieved 2015-08-11.
  • ^ "East End Line". METRORail. Archived from the original on 2013-01-21. Retrieved 2015-01-15.
  • ^ Abrahams, Tom (April 16, 2010). "East End light rail reaches milestone". KTRK-TV ABC13. Retrieved 2015-01-15.
  • ^ a b "Metro completes light rail line with new overpass just before Super Bowl". Houston Business Journal. January 11, 2017. Retrieved January 13, 2017.
  • ^ Rivas, Elissa (2017-01-11). "METRORail Green Line opens Wednesday morning". ABC13 Houston. Retrieved 2020-08-31.
  • ^ "East End Harrisburg Overpass Project Celebrates with Groundbreaking" (Press release). Metropolitan Transit Authority of Harris County. March 11, 2015. Retrieved May 23, 2015.
  • ^ "Metro completes light rail line with new overpass just before Super Bowl". Houston Business Journal. January 11, 2017. Retrieved January 20, 2024.
  • ^ https://upload.wikimedia.org/wikipedia/commons/e/ed/Houston_MetroRail_Harrisburg_%40_Wayside_Dr_2017-02-08.jpg [bare URL image file]
  • ^ "Construction Schedule". METRORail. Retrieved 2015-01-15.
  • ^ "Rail Lines Will Not Meet Oct. 2013 Deadline". KRIV (FOX 26 Houston). September 9, 2010. Archived from the original on January 18, 2015. Retrieved 2015-01-15.
  • ^ "Construction Issues Prompt New April 2015 Rail Opening Date" (Press release). Metropolitan Transit Authority of Harris County (Metro). September 25, 2014. Retrieved 2015-01-15.
  • ^ Begley, Dug (September 17, 2014). "More trouble for rail lines as opening pushed to next year". Houston Chronicle. Hearst Newspapers, LLC. Retrieved 2015-01-14.
  • ^ "East End residents angered over Metro's plans to build bridge". KHOU 11CBS. October 22, 2009. Retrieved 2015-01-15.
  • ^ Cisneros, Cynthia (August 23, 2010). "East-end light rail construction faces opposition". KTRK-TV ABC13. Retrieved 2015-01-15.
  • ^ Delaughter, Gail (May 21, 2014). "Major Decision Expected On East End Light Rail Project". Houston Public Media. Archived from the original on August 12, 2014. Retrieved 2014-07-24.
  • ^ Begley, Dug (May 22, 2014). "Metro rejects pleas for delay, proceeds with East End overpass plan". Houston Chronicle. Hearst Newspapers, LLC. Retrieved 2014-07-24.
  • ^ Delaughter, Gail (July 2, 2014). "Metro Unveils Preliminary Designs For East End Overpass". Houston Public Media. Archived from the original on August 12, 2014. Retrieved 2014-07-24.
  • ^ Hennes, Rebecca (March 14, 2015). "Groundbreaking of Metro overpass unites community". Houston Chronicle. Hearst Newspapers, LLC. Retrieved 2015-03-23.
  • ^ https://upload.wikimedia.org/wikipedia/commons/e/ed/Houston_MetroRail_Harrisburg_%40_Wayside_Dr_2017-02-08.jpg [bare URL image file]
  • ^ "East End Line [map]" (PDF). METRORail. March 27, 2012. Archived from the original (PDF) on March 20, 2013. Retrieved 2015-01-15.
  • ^ "Metro Light Rail (Houston, Sugar Land, Galveston: 2015, university, tax) - Texas (TX) - City-Data Forum".
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=METRORail_Green_Line&oldid=1197529010"

    Categories: 
    METRORail
    Railway lines opened in 2015
    2015 establishments in Texas
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from January 2018
    Articles with permanently dead external links
    All articles with bare URLs for citations
    Articles with bare URLs for citations from March 2022
    Articles with image file bare URLs for citations
    Articles with short description
    Short description is different from Wikidata
    All articles lacking reliable references
    Articles lacking reliable references from February 2018
     



    This page was last edited on 20 January 2024, at 22:24 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki