Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Path  





2 Landing points  





3 Impact  





4 Ownership  





5 Acquisition  





6 Construction time-line  





7 See also  





8 Footnotes  





9 Sources  














Main One






Français
Bahasa Indonesia
Italiano
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Main One (cable system))

Main One
Owners:
Main Street Technologies
Key people:
Funke Opeke
Landing points
  • 2. Nigeria Lagos, Lagos State, Nigeria
  • 3. Ghana Accra, Ghana
  • 4. South Africa South Africa
  • Total length14,000 km
    Topologytrunk and branch
    Design capacity1280 Gbit/s
    Currently lit capacityn/a
    TechnologyFiber optics
    Date of first useJuly 22, 2010; 14 years ago (July 22, 2010)

    The Main One Cable is a submarine communications cable stretching from PortugaltoSouth Africa with landings along the route in various west African countries. On April 28, 2008, it was announced that Main Street Technologies has awarded a turnkey supply contract for the Main One Cable System to Tyco Telecommunications.

    The cable system spans 14,000 km and provides additional capacity for international and Internet connectivity to countries between Portugal and South Africa on the west coast of Africa. The submarine cable project was designed in two phases, both of which were scheduled for completion in May 2010. The dual fiber pair, 1.28-Tbit/s, DWDM project connects Nigeria, Ghana, and Portugal in Phase 1 with onward connectivity through PortugaltoEurope, Asia and the Americas. The Phase 1 cable system spans 6,900 kilometres. Additional connectivity extending to Angola and South Africa occurred in the second phase of the project.

    Main One provides international capacity into a region that has experienced explosive growth in tele-density in recent years, but which remains constrained with respect to access to international cable capacity for global connectivity. The system is being developed by Main Street Technologies headquartered in Lagos. An October 10, 2008 press release states that the desk top study and engineering for the system has been completed. On July 22, 2010, the cable was launched. MainOne also owns a data centre subsidiary, MDXi which builds and operates Tier III data centres across West Africa.

    Project management and engineering for the cable system has been contracted to specialist undersea consulting firm, Pioneer Consulting.[1]

    The Chief Executive Officer of Main One is Funke Opeke.

    Path

    [edit]
    Main One - phase 1

    The Main One Cable is an undersea cable system stretching from PortugaltoSouth Africa with landings along the route in various west African countries.

    Landing points

    [edit]

    The Main One cable system has the following landing points in operation in July 2010:[2]

    planned landing points for phase 2 are:

    Impact

    [edit]

    Main One provides international capacity into a region that has experienced explosive growth in tele-density in recent years, but which remains constrained with respect to access to international cable capacity for global connectivity.

    The Main One Cable system provides open access to regional telecom operators and Internet service providers at rates that are less than 20% of current international bandwidth prices in the region available via SAT3 or satellite service providers, according to the project's organizers. Main Street says it will encourage local content development via skills transfer of critical networking technologies and job creation with the location of the network operational center (NOC) for the entire system in Nigeria.[3]

    Ownership

    [edit]

    The cable is privately owned by Main Street Technologies, international investors like the Africa Finance Corporation and the Pan-African Infrastructure Development Fund (PAIDF) and a couple of Nigerian banks.

    Acquisition

    [edit]

    Equinix announced they will be acquiring Mainone for an enterprise value of $320m, the deal is expected to be completed in the first quarter of 2022.

    Construction time-line

    [edit]

    On April 28, 2008, it was announced that Main Street Technologies had awarded a turnkey supply contract for the Main One Cable System to Tyco Telecommunications.[4] An October 10, 2008 press release states that the desk top study and engineering for the system had been completed.[5] On July 1, 2010, press release states that Main One had been completed and commissioned.[6] The cable went live on July 22, 2010.[7]

    See also

    [edit]

    Individual cable systems off the west coast of Africa include:

    Footnotes

    [edit]
  • ^ "Home". mainonecable.com.
  • ^ http://lw.pennnet.com/display_article/327046/13/ARCHI/none/NNEWS/1/Tyco-awarded-Main-One-cable-contract/
  • ^ http://lw.pennnet.com/display_article/342314/13/ARTCL/none/none/1/Main-One-Cable-System-progressing-on-schedule/
  • ^ "Untitled Document". Archived from the original on 2010-09-25. Retrieved 2010-07-05.
  • ^ "allAfrica.com: Nigeria: MainOne Fibre Optic Cable Launched". Archived from the original on 2010-07-25.
  • Sources

    [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Main_One&oldid=1234366906"

    Categories: 
    West Africa
    Submarine communications cables in the North Atlantic Ocean
    Submarine communications cables in the South Atlantic Ocean
    Telecommunications infrastructure
    Infrastructure in Europe
    Infrastructure in Africa
    Infrastructure in Portugal
    Infrastructure in South Africa
    2010 establishments in Africa
    2010 establishments in Portugal
    Hidden categories: 
    Webarchive template wayback links
    Articles needing cleanup from September 2022
    Articles with bare URLs for citations from September 2022
    All articles with bare URLs for citations
    Articles covered by WikiProject Wikify from September 2022
    All articles covered by WikiProject Wikify
     



    This page was last edited on 14 July 2024, at 00:15 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki