Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 References  





2 External links  














McNeill HVDC Back-to-back station







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 50°3556N 110°0125W / 50.59889°N 110.02361°W / 50.59889; -110.02361
 

From Wikipedia, the free encyclopedia
 


McNeill back to back HVDC converter station
Location
CountryCanada
StateAlberta
Coordinates50°35′56N 110°01′25W / 50.59889°N 110.02361°W / 50.59889; -110.02361 (McNeill Back to Back HVDC Station)
FromAlberta
ToSaskatchewan
Ownership information
OwnerATCO Electric
OperatorATCO Electric
Construction information
Installer of substationsGEC-Alstom
Commissioned1989
Technical information
TypeBack to Back
Type of currentHVDC
Total length0 km (0 mi)
Power rating150 MW
DC voltage42 kV
No. of poles1

McNeill HVDC Back-to-back station is an HVDC back-to-back station at 50°35'56"N 110°1'25"W, which interconnects the power grids of the Canadian provinces Alberta and Saskatchewan and went in service in 1989. McNeill HVDC back-to-back station is the most northerly of a series of HVDC interconnectors between the unsynchronised eastern and western AC systems of the United States and Canada. The station, which was built by GEC-Alstom, can transfer a maximum power of 150 MW at a DC voltage of 42 kV. The station is unusual in many respects and contained several firsts for HVDC.

Most notably, the McNeill station was the first HVDC installation to dispense with the DC smoothing reactor, a component which most engineers consider as an absolute must at HVDC plants. Even today, only a small number of back to back HVDC stations (and no point-to-point transmission schemes) have been built without DC smoothing reactors.

The McNeill station was also notable for operating with an exceptionally low Short Circuit Ratio (SCR). The SCR is a measure of how strong or weak the connected AC system is. Most HVDC schemes using line-commutated converters operate with a SCR of at least 3, but the McNeill scheme was designed to operate with an Effective Short Circuit Ratio (ESCR – a measure which subtracts the harmonic filters from the evaluation of SCR and is more meaningful on very weak AC systems) of less than 1.0 on the Saskatchewan side.[1] This is one of the lowest ESCR values ever achieved with a line-commutated HVDC converter.

McNeill was also the first HVDC station to use three-phase, four-winding converter transformers. The transformers, which are connected to 138 kV on the Alberta side and 230 kV on the Saskatchewan side, are each equipped with a 25 kV tertiary winding (to which the harmonic filters are connected) in addition to the two valve windings. This arrangement allowed the harmonic filters to be switched by vacuum switchgear which is more tolerant of large numbers of operations than high-voltage switchgear connected directly to the 138 kV or 230 kV busbars. This was a significant advantage since the extremely low short circuit ratio required the reactive power to be controlled within very tight limits,[1] leading to frequent switching operations.

The 12 thyristor valves at each side are arranged in a conventional twelve-pulse bridge. The valves are cooled by a mixture of de-ionised water and ethylene glycol, which does not freeze at a temperature of -50 °C. These were the first thyristor valves ever to use water/glycol mixtures directly inside the valve, with no separate secondary cooling circuit. The valves use 100mm, 5.2 kV electrically triggered thyristors with 11 in series per valve on the Alberta side and 12 in series per valve on the Saskatchewan side.

In January 2012, Alstom was awarded a contract to replace the analogue control system by a more modern digital control system.[2]

References[edit]

  1. ^ a b Burgess, R.P., Ainsworth, J.D., Thanawala, H.L., Jain, M., Burton, R.S., Voltage/Var control at McNeill Back to Back HVDC converter station, CIGRÉ session, Paris, 1990, paper reference 14-104.
  • ^ Alstom to renew control system for key HVDC link in North American electrical network, Penn Energy, 27 January 2012.
  • External links[edit]

    50°35′56N 110°01′25W / 50.59889°N 110.02361°W / 50.59889; -110.02361


    Retrieved from "https://en.wikipedia.org/w/index.php?title=McNeill_HVDC_Back-to-back_station&oldid=1198090992"

    Categories: 
    Power stations in Alberta
    Cypress County
    Electric power transmission systems in Canada
    Converter stations
    1989 establishments in Alberta
    Energy infrastructure completed in 1989
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Coordinates on Wikidata
     



    This page was last edited on 22 January 2024, at 23:48 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki