Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Chronology  





3 Rolling stock  





4 Station list  



4.1  Renamed stations  







5 Ridership  





6 Tourism  





7 See also  





8 Notes  





9 References  














Mexico City Metro Line 1






Čeština
Español
Français
Հայերեն
Bahasa Indonesia
Italiano

Norsk bokmål
Português
Русский

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Line 1 / Línea 1
Observatorio terminal
Overview
LocaleMexico City
Termini
  • Pantitlán
  • Connecting lines
    Stations20
    Service
    TypeRapid transit
    SystemMexico City Metro
    Operator(s)Sistema de Transporte Colectivo (STC)
    Rolling stockNM-16, NM-22
    Ridership665,171 passengers per day (2019)[1]
    History
    Opened4 September 1969
    Technical
    Line length16.654 km (10 mi)
    Track length18.828 km (12 mi)
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
    with roll ways along track
    ElectrificationGuide bars
    Operating speed36 km/h (22 mph)

    Route map

    Observatorio yard

    Observatorio
    Mexico City Metro Line 12

    Tacubaya
    Mexico City Metro Line 7 Mexico City Metro Line 9

    Juanacatlán

    Chapultepec

    Sevilla

    Insurgentes

    Cuauhtémoc

    Balderas
    Mexico City Metro Line 3

    Salto del Agua
    Mexico City Metro Line 8

    Isabel la Católica

    Pino Suárez
    Mexico City Metro Line 2

    Merced

    Candelaria
    Mexico City Metro Line 4

    San Lázaro
    Mexico City Metro Line B

    Moctezuma

    Balbuena

    Boulevard Puerto Aéreo

    Gómez Farías

    Zaragoza

    Zaragoza workshops

    Pantitlán
    Mexico City Metro Line 5 Mexico City Metro Line 9 Mexico City Metro Line A
  • talk
  • edit
  • Mexico City Metro Line 1 is one of the twelve Metro lines operating in Mexico City, Mexico. Officially inaugurated in 1969, it was the first metro line to be built in the country. Its identifying color is pink, and it runs west–east.

    Juanacatlán, Tacubaya, and Observatorio, Chapultepec, Sevilla, Insurgentes, Cuauhtémoc, Balderas, and Salto del Agua stations are currently closed for reconstruction through September 2024.

    The line is built under several avenues: Parque Lira, Pedro Antonio de los Santos, Circuito Interior, Avenida de los Insurgentes, Avenida Chapultepec, Arcos de Belén, Balderas, Eje Central Lázaro Cárdenas, José María Izazaga, Isabel la Católica, Anillo de Circunvalación, Congreso de la Unión, Eduardo Molina, and Ignacio Zaragoza.

    It connects with Lines 7 and 9 at the Station Tacubaya, Line 3 at Balderas, Line 8 at Salto del Agua, Line 2 at Pino Suárez, Line 4 at Candelaria, Line B at San Lázaro and Lines 5, 9 and A at Pantitlán. When Line 12 extension is completed, it will also connect with Line 12atObservatorio.[2]

    History

    [edit]
    refer to adjacent text
    Chapultepec station during the first day of operations after the inauguration.

    The first section of Line 1 was opened on 4 September 1969 as part of Mexico City Metro's first construction stage, it was inaugurated by Gustavo Díaz Ordaz, President of Mexico from 1964 to 1970, and Alfonso Corona del Rosal, Regent of the Federal District Department.[3] The inauguration ceremony took place at the Insurgentes station.[4]

    The next day the line was opened to the public. To the original route (ChapultepecZaragoza) a new station, Juanacatlán, was added to the west on 11 April 1970, and the first correspondencia (atransfer station) became functional on 1 August 1970 when Line 2 was opened. The two westernmost stations Tacubaya and current terminal Observatorio were inaugurated on 20 November 1970 and 10 June 1972 respectively.

    Station Pantitlán was opened on 22 August 1984 as the eastern terminal during a fourth and final expansion. All twenty stations have operated since then, running a total track length of 18.83 km (11.70 mi), of which 16.65 km (10.35 mi) are passenger track. The 1 is the only line in the network that is fully underground except for some surface track in Observatorio used for maintenance.

    As of 2020, an extension of Line 12 is under construction, this stretch will connect Line 12 with Line 1 at the Observatorio station.[2]

    Temporary platform installed at Balderas station

    Authorities warned on 10 August 2020 that Line 1 is in danger of a major fire due to an aging electrical system that is in need of major improvements. Lines 1, 2, and 3 report an average of 2.5 electrical failures daily.[5] As a result, the line started undergo renovations that require its closure. The first closure was from Pantitlán to Salto de Agua stations starting on 11 July 2022 and it was expected to conclude in March 2023. The second closure was expected to start in March 2023 from Balderas to Observatorio stations and was expected to conclude in August 2023. During both periods, all railway elements will be replaced with modern material, the wiring will be replaced, damage due to leaks and cracks will be repaired, stations that are not yet modernized will be updated, and accessibility will be added to stations that lack it.[6][7]

    In April 2023, Siemens Mobility claimed that they would install CBTC on Line 1.[8] On October 29, 2023, the modernized section of Line 1 was inaugurated.[9] The second stage is expected to begin on 9 November 2023.[10]

    Chronology

    [edit]

    Rolling stock

    [edit]

    Line 1 has had different types of rolling stock throughout the years.

    Currently, out of the 390 trains in the Mexico City Metro network, 49 are in service in Line 1.[11]

    Station list

    [edit]
    Key[a]
    Handicapped/disabled access Denotes a partially accessible station
    Handicapped/disabled access Denotes a fully accessible station
    Mexico City Metro Denotes a metro transfer
    CETRAM Denotes a connection with the Centro de transferencia modal (CETRAM) system
    Ecobici Denotes a connection with the Ecobici system
    Metrobús Denotes a connection with the Metrobús system
    Mexibús Denotes a connection with the Mexibús system
    Public buses Denotes a connection with the public bus system
    RTP Denotes a connection with the Red de Transporte de Pasajeros (RTP) system
    Trolleybus Denotes a connection with the Trolleybus system

    The stations from west to east:

    Mexico City Metro Line 1 map Scheme of the Mexico City Metro Line 1
    No. Station Date opened Level Distance (km) Connection Location
    Between
    stations
    Total
    01 Pantitlán Handicapped/disabled access August 22, 1984 Underground
    trench
    - 0.0
  • Mexico City Metro Mexico City Metro Line 5 Line 5
  • Mexico City Metro Mexico City Metro Line 9 Line 9 (out of service)
  • Mexico City Metro Mexico City Metro Line A Line A
  • CETRAM Pantitlán
  • Metrobús Line 4 Line 4 (Alameda Oriente branch): Pantitlán station (also temporary Line 9 service)
  • Mexibús Line 3 Line III: Pantitlán station
  • RTP Route: 168
  • Trolleybus Line 2 Line 2: Pantitlán stop
  • Public buses Routes: 11-B, 11-C, 19-F, 19-G
  • Venustiano Carranza
    02 Zaragoza Handicapped/disabled access September 4, 1969 1.5 1.5
  • CETRAM Zaragoza
  • RTP Routes: 162B, 163, 163A, 163B, 164, 166, 167
  • 03 Gomez Farías Handicapped/disabled access 0.9 2.4
    04 Boulevard Puerto Aéreo Handicapped/disabled access 0.7 3.1
  • CETRAM Boulevard Puerto Aéreo
  • RTP Route: 43
  • Trolleybus Line 4 Line 4: Boulevard Puerto Aéreo stop
  • Public buses Routes: 20-B, 22-D
  • 05 Balbuena Handicapped/disabled access 0.8 3.9
  • CETRAM Balbuena
  • 06 Moctezuma Handicapped/disabled access 0.8 4.7
  • Metrobús Line 4 Line 4 Moctezuma station (at distance)
  • Metrobús Line 5 Line 5 Moctezuma station (at distance)
  • Public buses Routes: 19-E, 19-F, 19-G, 19-H (all at distance)
  • 07 San Lázaro Handicapped/disabled access 0.7 5.4
  • Mexico City Metro Mexico City Metro Line B Line B
  • CETRAM San Lázaro
  • Metrobús Line 4 Line 4: San Lázaro station
  • Metrobús Line 5 Line 5: San Lázaro station
  • Bus interchange East Bus Terminal (TAPO)
  • 08 Candelaria 1.1 6.4
  • Mexico City Metro Mexico City Metro Line 4 Line 4
  • Metrobús Line 4 Line 4: Cecilio Robelo station (at distance)
  • RTP Route: 37
  • Public buses Route: 5-A
  • 09 Merced Handicapped/disabled access 0.9 7.3
  • Metrobús Line 4 Line 4: La Merced station
  • Public buses Route: 5-A
  • 10 Pino Suárez Handicapped/disabled access 0.8 8.2
  • Mexico City Metro Mexico City Metro Line 2 Line 2
  • Mexico City Metro Passage Zócalo-Pino Suárez
  • CETRAM Nezahualcóyotl (at distance)
  • Ecobici
  • Metrobús Line 4 Line 4: Pino Suárez station (south route)
  • RTP Routes: 2-A, 31-B, 111-A, 145-A
  • Public buses Routes: 17-C, 17-H, 17-I, 19-E, 19-F, 19-G, 19-H
  • Cuauhtémoc
    11 Isabel la Católica Handicapped/disabled access 0.5 8.7
  • Ecobici
  • RTP Isabel la Católica stop (temporary Line 1 service)
  • Public buses Routes: 19-E, 19-F, 19-G, 19-H
  • 12 Salto del Agua Handicapped/disabled access 0.6 9.3
  • Mexico City Metro Mexico City Metro Line 8 Line 8
  • Ecobici
  • RTP Salto del Agua stop (temporary Line 1 service)
  • Trolleybus Line 1 Line 1: Salto del Agua stop
  • Public buses Routes: 19-E, 19-F, 19-G, 19-H
  • 13 Balderas Handicapped/disabled access 0.6 9.9
  • Ecobici
  • RTP Route: 34-A (also temporary Line 1 service)
  • Mexico City Metro Mexico City Metro Line 3 Line 3
  • Metrobús Line 3 Line 3: Balderas station
  • Public buses Routes: 19-E, 19-F, 19-G, 19-H
  • 14 Cuauhtémoc Handicapped/disabled access 0.5 10.5
  • Ecobici
  • Metrobús Line 3 Line 3: Cuauhtémoc station
  • RTP Route: 34-A (also temporary Line 1 service)
  • Public buses Routes: 19-E, 19-F, 19-G, 19-H
  • 15 Insurgentes Handicapped/disabled access 0.9 11.4
  • Ecobici
  • Metrobús Line 1 Line 1: Glorieta de los Insurgentes station
  • RTP Route: 34-A (also temporary Line 1 service)
  • Public buses Routes: 18-C (at distance), 19-E, 19-F, 19-G, 19-H
  • 16 Sevilla Handicapped/disabled access 0.8 12.2
  • Ecobici
  • RTP Routes: 19, 19-A, 34-A (also temporary Line 1 service)
  • Public buses Routes: 13-D, 18-C, 19-E, 19-F, 19-G, 19-H
  • 17 Chapultepec Underground
    two-story trench
    0.6 12.9
  • CETRAM Chapultepec
  • Ecobici
  • Metrobús Line 7 Line 7: Chapultepec station (at distance) (also temporary Line 1 service)
  • RTP Routes: 11-A, 13-A, 34-A, 115-A, 200 (also temporary Line 1 service)
  • Trolleybus Line 2 Line 2: Chapultepec stop
  • Trolleybus Line 6 Line 6: Chapultepec stop
  • Public buses Routes: 7-D, 8-A, 8-B, 8-C, 8-D, 13-C, 13-E, 18-C, 18-D, 19-E, 19-F, 19-G, 19-H, 21-A
  • 18 Juanacatlán Handicapped/disabled access April 11, 1970 1.1 14.0
  • Ecobici
  • RTP Routes: 13-A, 115-A (also temporary Line 1 service)
  • Public buses Route: 21-A
  • Miguel Hidalgo
    19 Tacubaya Handicapped/disabled access November 20, 1970 Underground
    multi-story trench
    1.3 15.2
  • Mexico City Metro Mexico City Metro Line 7 Line 7
  • Mexico City Metro Mexico City Metro Line 9 Line 9
  • CETRAM Tacubaya
  • Ecobici (at distance)
  • Metrobús Line 2 Line 2: Tacubaya station (also temporary Line 1 service)
  • RTP Routes: 110, 110-B, 110-C, 112, 113-B, 115, 118, 119, 200 (also temporary Line 1 service)
  • Public buses Routes: 1-B, 9-C, 9-E, 21-A
  • 20 Observatorio Handicapped/disabled access June 10, 1972 Hillside trench 1.4 16.7
  • Mexico City Metro Mexico City Metro Line 12 Line 12 (under construction)
  • Bus interchange West Bus Terminal
  • CETRAM Observatorio
  • Mainline rail interchange El Insurgente
    (under construction)
  • RTP Observatorio stop (temporary Line 1 service)
  • Public buses Route: 21-D
  • Álvaro Obregón

    Renamed stations

    [edit]
    Date Old name New name
    1997 Aeropuerto Boulevard Puerto Aéreo

    Ridership

    [edit]

    The following table shows each of Line 1 stations total and average daily ridership during 2019.[1]

    Transfer station
    Terminal
    †‡ Transfer station and terminal
    Rank Station Total ridership Average daily
    1 Observatorio 26,388,110 72,296
    2 Insurgentes 20,753,676 56,859
    3 Chapultepec 19,388,677 53,120
    4 Merced 18,129,244 49,669
    5 Pantitlán†‡ 17,860,457 48,933
    6 Zaragoza 16,963,497 46,475
    7 Tacubaya 12,369,808 33,890
    8 San Lázaro 11,915,094 32,644
    9 Pino Suárez 11,456,022 31,386
    10 Sevilla 11,123,527 30,475
    11 Gómez Farías 10,360,851 28,386
    12 Candelaria 8,554,561 23,437
    13 Boulevard Puerto Aéreo 8,429,972 23,096
    14 Cuauhtémoc 8,311,511 22,771
    15 Isabel la Católica 8,262,282 22,636
    16 Moctezuma 8,050,035 22,055
    17 Balderas 7,825,656 21,440
    18 Salto del Agua 7,482,564 20,500
    19 Balbuena 4,902,639 13,432
    20 Juanacatlán 4,259,229 11,669
    Total 242,787,412 665,171

    Tourism

    [edit]

    Line 1 passes near several places of interest.

    See also

    [edit]

    Notes

    [edit]
    1. ^ The following list was adapted from different websites and official maps.
      • Metro () connections obtained from the official Mexico City Metro system map.[12]
  • Accessibility obtained from the Mexico City Metro system map. In some cases, the map omits the accessibility icon as the station(s) are actually partially accessible. However, the respective websites of each station on the official site indicate the respective accessibility methods. Stations with the symbol Handicapped/disabled access‡ are fully accessible; stations with the symbol Handicapped/disabled access† are partially accessible.[12]
  • Centro de transferencia modal (CETRAM; ) obtained from the official website of the Órgano Regulador de Transporte.[13]
  • Ecobici () obtained from their official website.[14]
  • Metrobús () obtained from the Mexico City Metrobús system map.[15]
  • Mexibús () obtained from the official Mexico City Metro system map.[12]
  • Public buses network (peseros) () obtained from the official website of the Órgano Regulador de Transporte.[16]
  • Red de Transporte de Pasajeros () obtained from their official website.[17]
  • Trolleybuses () obtained from their official website.[18]
  • References

    [edit]
    1. ^ a b "Afluencia de estación por línea 2019" (in Spanish). Metro CDMX. Retrieved 25 April 2020.
  • ^ a b "Ampliarán Línea 12 del Metro del DF". Sipse (in Spanish). February 14, 2013. Retrieved July 27, 2018.
  • ^ "Línea 1 del Metro renueva el transporte capitalino". El Universal (in Spanish). September 4, 2016. Retrieved August 13, 2018.
  • ^ "El origen del Metro del DDF". siempre.mx (in Spanish). Revista Siempre. 4 September 2018. Retrieved 4 April 2020.
  • ^ "Advierten sobre riesgo de incendio en Línea 1 del Metro". El Universal (in Spanish). 20 August 2020. Retrieved August 20, 2020.
  • ^ Yeferson, Armando (28 June 2022). "Accesibilidad incluyente será del 100% en la Línea 1 del Metro: Calderón Aguilera". 24 Horas (in Spanish). Retrieved 10 July 2022.
  • ^ López, Alejandro I. (9 July 2022). "Línea 1 del metro de Ciudad de México: cuándo cierra, rutas y alternativas de transporte". El País (in Spanish). Retrieved 10 July 2022.
  • ^ Siemens Mobility. "El CBTC en Línea 1 del Metro CDMX" (PDF) (in Spanish). Asociación Mexicana de Ferrocarriles.
  • ^ "Reabre primer tramo de L1". sinembargo.mx (in Spanish). October 29, 2023. Retrieved October 29, 2023.
  • ^ https://www.infobae.com/mexico/2023/11/01/cierre-de-la-linea-1-del-metro-en-esta-fecha-dejara-de-dar-servicio-el-tramo-isabel-la-catolica-observatorio/?outputType=amp-type
  • ^ http://www.metro.cdmx.gob.mx/operacion/parque-vehicular Parque vehicular (Rolling stock)
  • ^ a b c "Mi Mapa Metro 22032021" [My Metro Map 22032021] (PDF) (in Spanish). Sistema Transporte Colectivo Metro. 22 March 2021. Retrieved 30 October 2021.
  • ^ "Centros de Transferencia Modal (CETRAM)" [Modal Transfer Centers] (in Spanish). Órgano Regulador de Transporte. Retrieved 30 October 2021.
  • ^ "Mapa de disponibilidad" [Disponibility map] (in Spanish). Ecobici. Retrieved 30 October 2021.
  • ^ "Mapa del sistema" [System map] (in Spanish). Mexico City Metrobús. Retrieved 30 October 2021.
  • ^ "Red de corredores" [Route network] (in Spanish). Retrieved 30 October 2021.
  • ^ "Red de Rutas" [Routes network] (in Spanish). Red de Transporte de Pasajeros. Retrieved 30 October 2021.
  • ^ "Servicios" [Services] (in Spanish). Servicio de Transportes Eléctricos. Retrieved 30 October 2021.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Mexico_City_Metro_Line_1&oldid=1218325904"

    Categories: 
    1969 establishments in Mexico
    Mexico City Metro lines
    Railway lines opened in 1969
    Hidden categories: 
    CS1 Spanish-language sources (es)
    Articles with short description
    Short description matches Wikidata
     



    This page was last edited on 11 April 2024, at 01:39 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki