Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 GKN 1  





2 GKN 2  





3 Traction current converter plant  



3.1  Dimensions  







4 Cooling towers  



4.1  Hybrid cooling tower  







5 Malfunctions  





6 Powerlines  





7 Public opposition  





8 Popular culture  





9 References  














Neckarwestheim Nuclear Power Plant






Čeština
Deutsch
فارسی
Français
Hrvatski
Italiano
Nederlands
Norsk bokmål
Русский
Srpskohrvatski / српскохрватски
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 49°0230N 9°1030E / 49.04167°N 9.17500°E / 49.04167; 9.17500
 

From Wikipedia, the free encyclopedia
 


Neckarwestheim Nuclear Power Plant
Nuclear power plant Neckarwestheim
Map
CountryGermany
LocationNeckarwestheim
Coordinates49°02′30N 9°10′30E / 49.04167°N 9.17500°E / 49.04167; 9.17500
StatusDecommissioned
Construction began1971
Commission date26 May 1976
Decommission date15 April 2023
Owner(s)EnBW
Operator(s)EnBW
Cooling towers1
Cooling sourceNeckar River
Power generation
Units operational1 × 1,400 MW
Nameplate capacity1,435 MW
Capacity factor87.1%
Annual net output17,060 GW·h
External links
Websitewww.enbw.com/unternehmen/konzern/energieerzeugung/kernenergie/standorte/
CommonsRelated media on Commons
The containment buildings of the two Neckarwestheim units

Neckarwestheim Nuclear Power Station is a nuclear power plantinNeckarwestheim, Germany, sometimes abbreviated GKN (for German: Gemeinschaftskraftwerk Neckar), operated by EnBW Kernkraft GmbH, a subsidiary of EnBW.

As part of the nuclear power phase-out, it was taken out of service on April 15, 2023.[1][2] Since the shutdown of the plant, Germany has been dependent on coal and natural gas to generate electricity.[3][4]

GKN 1[edit]

Unit I, in service since 1976, carried a nominal electrical power of 840 megawatts. The 50 Hzthree phase AC power was 567 megawatts and for the 16.7 Hztraction current power 174 MW. The traction current generator is the world's largest single-phase AC generators. The generator block 1 is rated 21,000 volts at a current of 27,000 amperes, and the traction current generator is rated 14,500 volts and a current of 12,000 amperes. The current produced by the generators was stepped up to 220 kilovolts (three-phase alternating current) or 110 kilovolts (single-phase traction current) with the unit transformers. Unit I was the only nuclear power station which produced traction current. Block I was shut down on 17 March 2011, for a three-month moratorium on nuclear power, an announcement on 30 May 2011 named block I as a unit that would not be returning to service for political reasons.

GKN 2[edit]

Block 2, in service since 1988, has a nominal electrical power of 1400 megawatts. The generator produces 50 Hz three-phase alternating current with a voltage of 27,000 V and a current of 35,000 amperes. Unlike Unit 1, no dedicated traction current generation takes place, but some of the power produced is converted at the traction current substation. This is transmitted through the 380 kV generator transformer block of the II and the 380 kV-machine transformer of the motor-generator sets.

The Unit 1 of the Neckarwestheim Nuclear Power Plant (right) and the cooling tower of Unit 2 (left)

Traction current converter plant[edit]

Traction Current Inverter under construction

The GKN station has a 16.7 Hztraction current converter plant. It is close to the switchgear of block II, has two identical sets, consisting of a three-phase 50 Hz AC motor with 12 poles and a four pole single phase 16.7 Hz AC synchronous generator. The rated voltage of the three-phase AC asynchronous machine and the traction current machine is 12.5 kV. The set has a length of 17.5 meters and a maximum width of 7 meters. The nominal power rating for each set is 70 megawatts, which are the largest traction current motor-generator sets ever built. It feeds the 110 kV balanced line traction power network through appropriate transformers. Power can be transferred from the Block II nuclear generator over the 380 kV transmission network.[citation needed]

As of 2011, there was a traction current inverter with a transmission rate of 140 MW under construction. It uses GTOs manufactured by ABB.[citation needed]

Dimensions[edit]

Dimensions of the outer concrete building of the double-containment are height of around 54,5 m and diameter of around 67 m.[5]

Cooling towers[edit]

The cell cooling towers from
Unit 1
The "hybrid" cooling tower for the plant

In order to avoid overheating of the river Neckar, both blocks have cooling towers. These are not built in the usual way. Block I uses two rows of cell cooling towers. Each row has a length of 186.8 meters and a height of 18 meters. Block II uses a hybrid cooling tower with a height of 51.22 meters. It was originally going to use a wet cooling tower, but later it was decided to use dry cooling towers because it would have less effect on the environment though more expensive. This unique type of cooling tower causes the unique shape seen in pictures.

Hybrid cooling tower[edit]

Malfunctions[edit]

Unit 1

In 1977, Unit I had the second most serious incident of a nuclear power plant in the German Federal Republic to that date. Numerous errors of a new crew led to damage of the secondary cycle and, at the same time, a defect of a valve led to an automatic reactor shutdown.

On 27 July 2004, water contaminated with two megabecquerels leaked unnoticed from Unit II into the Neckar river. As a result, for the first time in the Federal Republic, the operator company of a nuclear power plant paid a fine of €25,000 and a managing director was dismissed.[citation needed]

Powerlines[edit]

The Neckarwestheim Nuclear Power Plant photographed from the castle "Liebenstein" near Neckarwestheim
The nuclear power plant in 1979: only Unit 1 was operational, Unit 2 was under construction

Power produced at GKN is transmitted over a transmission line carrying two circuits of traction current and three-phase alternating current line to the 220 kV-three phase AC and the 110 kV-traction current switchyard situated east of Neckarwestheim. This line is hung on pylons of unusual design with five cross beams. On the lowest cross bar there are two traction current circuits, while the second, third and fourth cross beam carry the three-phase circuits. These are operated, in the case of the GKN 1, with 220 kV and in the case of the GKN 2 with 380 kV. On the highest cross beam two ground conductors are installed. It is notable that the traction current circuits were insulated for 220 kV, although they are operated only with 110 kV. This measure was taken because, in case of a disturbance of the parallel 380 kV-line, overvoltages can occur which insulation designed for 110 kV cannot stand.[citation needed]

The traction current lines from the GKN to the traction current switching station at Neckarwestheim, and from there to the central substation in Stuttgart Zazenhausen, are implemented as four-bundle conductors.[citation needed]

The three-phase 380 kV circuit leading away from the nuclear power station GKN 2 runs past the 220 kV-three phase switchyard at Neckarwestheim to the transformer station at Großgartach near Heilbronn. another 110 kV-line for three phase AC with one circuit which originates in the switchgear of the coal-fired power stationatWalheim also runs to the GKN. This line is not for export of the power produced by the GKN, but for start-up power for the nuclear plant.

Neckarwestheim and the GKN have never had a track connection to the railway network.

Public opposition[edit]

Geologist Hermann Behmel was a prominent opponent of the Neckarwestheim Nuclear Power Plant.[6]

In April 2009, anti-nuclear activists blocked the entrance to the controversial Neckarwestheim Nuclear Plant with an 8-metre wall. Their protest coincided with the annual meeting of the company that runs the plant, Energie Baden-Württemberg (EnBW).[7]

Popular culture[edit]

On April 23rd 2014, the power plant featured on an episode of The Technical Difficulties in the game 'Citation Needed' presented by Tom Scott, Gary Brannan, Matt Gray, and Chris Joel. [8]

References[edit]

  • ^ Connolly, Kate (8 July 2022). "Germany to reactivate coal power plants as Russia curbs gas flow". The Guardian. ISSN 0261-3077. Retrieved 5 June 2023.
  • ^ Jordans, Frank (15 April 2023). "Over and out: Germany switches off its last nuclear plants". ABC News. Archived from the original on 5 June 2023.
  • ^ Siemens: Druckwasserreaktoren von Siemens - Power for Generations
  • ^ der Spiegel
  • ^ Protestors block nuclear power plant entrance
  • ^ Neckarwestheim and the End of the World: Citation Needed 1x06
  • iconEnergy portal
  • Nuclear technology portal

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Neckarwestheim_Nuclear_Power_Plant&oldid=1219835921"

    Categories: 
    EnBW
    Former nuclear power stations in Germany
    Buildings and structures in Heilbronn (district)
    Economy of Baden-Württemberg
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from November 2021
    Articles needing additional references from August 2008
    All articles needing additional references
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Articles containing German-language text
    All articles with unsourced statements
    Articles with unsourced statements from March 2017
    Articles with VIAF identifiers
    Articles with GND identifiers
    Pages using the Kartographer extension
     



    This page was last edited on 20 April 2024, at 03:43 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki