Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 See also  





2 References  














Orhideea Towers






Română
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 44°2638.4N 26°335.3E / 44.444000°N 26.059806°E / 44.444000; 26.059806
 

From Wikipedia, the free encyclopedia
 


Orhideea Towers
Completed in Nov 2017
Map
General information
StatusUnder construction
TypeOffice building
LocationBucharest
Coordinates44°26′38.4″N 26°3′35.3″E / 44.444000°N 26.059806°E / 44.444000; 26.059806
Groundbreaking2015
Estimated completion2018
Opening2018
Cost€75 million
OwnerCA Immo
Height
Tip85 m (279 ft)
Technical details
Floor count17
Floor area37,000 m2 (400,000 sq ft)
Design and construction
Architect(s)BEHF Corporate Architects
Structural engineerPopp & Asociații

The Orhideea Towers, is a class A office building complex constructed in the western part of Bucharest in the vicinity of the Politehnica University of Bucharest. The complex comprises two office buildings, one 17 floors, 85 m (279 ft) tall and the other 13 floors, 64 m (210 ft) with a total gross leasable area of 37,000 m2 (400,000 sq ft).[1] At completion the 85 m (279 ft) high building complex will be one of the tallest in Bucharest.[2] The construction of the building started in October 2015 and was completed in the first quarter of 2019 at a total cost of €75 million.[3]

The original project consisted of two 20 floor buildings covering 50,000 m2 (540,000 sq ft) but eventually was modified to comprise the current 17 and 13 floor buildings linked together by a skybridge. The complex is directly linked to the nearby Grozăvești metro station by a tunnel specially built for the project.[4]

See also[edit]

References[edit]

  1. ^ "Office development project in Bucharest" (in Romanian). caimmo.com. 2 July 2016.
  • ^ "Austriecii de la PORR Construct construiesc clădirile Orhideea Towers pentru CA Immo" (in Romanian). zf.ro. 2 July 2016.
  • ^ "Orhideea Towers". Porr Construct. Retrieved 24 June 2016.
  • ^ "CA Immo îşi îndreaptă atenţia spre proiectul de 70 mil. euro de la Orhideea: Avem autorizaţie şi începem lucrările în primăvară" (in Romanian). zf.ro. 2 July 2016.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Orhideea_Towers&oldid=1002178048"

    Category: 
    Skyscraper office buildings in Bucharest
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 Romanian-language sources (ro)
    Articles with short description
    Short description matches Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 23 January 2021, at 05:49 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki