Payra Bridge







Nederlands
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 22°2751N 90°2029E / 22.4641012°N 90.3412547°E / 22.4641012; 90.3412547
 

From Wikipedia, the free encyclopedia
 


Payra Bridge


পায়রা সেতু
Coordinates22°27′51N 90°20′29E / 22.4641012°N 90.3412547°E / 22.4641012; 90.3412547
CarriesMotor vehicles
CrossesPayra River
LocalePatuakhali, Bangladesh
Other name(s)Lebukhali Bridge
Characteristics
DesignExtradosed bridge
MaterialConcrete, steel, rope
Total length1,470 metres (4,820 ft)
Width19.76 metres (64.8 ft)
Height18.30 metres (60.0 ft)
Longest span200 metres (660 ft)
History
Construction startJuly 24, 2016 (2016-07-24)
Construction endOctober 2021 (2021-10)
OpenedOctober 28, 2021 (2021-10-28)
Location
Map

Payra Bridge is a road bridge across the Burishwar River. It connects Barisal and Patuakhali, linking the southwest of the country to the northern regions.

History

[edit]

A student from Patuakhali wrote a letter to Prime Minister Sheikh Hasina requesting to build a bridge over the river on which the bridge is located. After reading the letter, the Prime Minister assured to build the bridge.[1] In 2012, the Department of Roads and Highways adopted a plan to build the Payra Bridge. At that time its construction cost was estimated at Tk 4.58 billion. The bridge is funded by Kuwait Fund for Arab Economic Development and OPEC Fund for International Development. On March 13, 2013, Sheikh Hasina laid the foundation stone of the bridge.[2] Two years later, the budget for the bridge was doubled by revising the project. One year later, on July 24, the Longjian Road and Bridge Company was commissioned to build the bridge. In 2018, the construction work was delayed due to an error in the design of the bridge. However, in 2019,[3] the final construction cost of the bridge was fixed at Tk 14.46 billion and the design of the bridge was changed.[4] The four-lane bridge was scheduled to be completed in June 2020.[5] But due to the COVID-19 epidemic, the work could not be completed on time. Later, the completion date was postponed to June 2022.[6] The bridge was inaugurated on 28 October 2021.[2]

Specifications

[edit]

Payra Bridge is one of the first bridges in Bangladesh to have a bridge health monitoring system. The length of the bridge is 1.48 km. The bridge has been constructed at a height of 18.3 meters above the water level to facilitate navigation. Not more than one pillar of this bridge has been placed in the river.[2]

Usage and benefits

[edit]

Kuakata Beach is easily accessible from the bridge. Besides, this bridge connects Port of Payra with Dhaka.[7]

References

[edit]
  1. ^ "প্রধানমন্ত্রী প্রতিশ্রুত পায়রা সেতু নির্মাণের প্রক্রিয়া শুরু". Janakantha (in Bengali). 4 November 2016.
  • ^ a b c "PM opens Payra Bridge to traffic". The Business Standard. 24 October 2021. Archived from the original on 30 October 2021. Retrieved 27 June 2022.
  • ^ "Toll rate for Payra Bridge fixed". New Age. 26 March 2021.
  • ^ "Payra bridge that establishes road connectivity with South opens today". The Financial Express. 24 October 2021. Archived from the original on 2 November 2021. Retrieved 27 June 2022.
  • ^ Basu, Rajib (20 January 2019). "Payra Bridge halfway into completion". Bangla Tribune. Archived from the original on 25 September 2021. Retrieved 27 June 2022.
  • ^ Tuhin Shubhra Adhikary (16 September 2021). "Payra Bridge: Cost 3.5 times the original estimate". The Daily Star. Archived from the original on 17 September 2021. Retrieved 27 June 2022.
  • ^ M Jahirul Islam Jewel (4 July 2021). "Lebukhali bridge to boost trade in Patuakhali, connecting Kuakata, Payra". The Business Standard. Archived from the original on 23 March 2022. Retrieved 27 June 2022.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Payra_Bridge&oldid=1123028816"

    Categories: 
    Road bridges in Bangladesh
    Extradosed bridges in Bangladesh
    Barishal Division
    Toll bridges in Bangladesh
    Bridges completed in 2021
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 Bengali-language sources (bn)
    Articles with short description
    Short description is different from Wikidata
    Coordinates on Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Commons category link is on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 21 November 2022, at 10:00 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki