Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Terminology  





2 Risk management  





3 Scale dependence of plant properties  



3.1  Other factors  







4 Bench scale vs pilot vs demonstration  





5 Steps to creating a custom pilot plant  





6 See also  





7 References  





8 Bibliography  














Pilot plant






Deutsch
Español

Bahasa Indonesia
Italiano
Nederlands

Português
Українська

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Large pilot plant under construction

Apilot plant is a pre-commercial production system that employs new production technology and/or produces small volumes of new technology-based products, mainly for the purpose of learning about the new technology. The knowledge obtained is then used for design of full-scale production systems and commercial products, as well as for identification of further research objectives and support of investment decisions. Other (non-technical) purposes include gaining public support for new technologies and questioning government regulations.[1] Pilot plant is a relative term in the sense that pilot plants are typically smaller than full-scale production plants, but are built in a range of sizes. Also, as pilot plants are intended for learning, they typically are more flexible, possibly at the expense of economy. Some pilot plants are built in laboratories using stock lab equipment, while others require substantial engineering efforts, cost millions of dollars, and are custom-assembled and fabricated from process equipment, instrumentation and piping. They can also be used to train personnel for a full-scale plant. Pilot plants tend to be smaller compared to demonstration plants.

Terminology

[edit]

A word similar to pilot plant is pilot line.[2] Essentially, pilot plants and pilot lines perform the same functions, but 'pilot plant' is used in the context of (bio)chemical and advanced materials production systems, whereas 'pilot line' is used for new technology in general. The term 'kilo lab' is also used for small pilot plants referring to the expected output quantities.[3]

Risk management

[edit]

Pilot plants are used to reduce the risk associated with construction of large process plants. They do so in several ways:

These theoretical modeling methods return the following:
  • Finalized mass and energy balances
  • Optimized system design and capacity
  • Equipment requirements
  • System limitations
  • The basis for determining the cost to build the pilot module

If a system is well defined and the engineering parameters are known, pilot plants are not used. For instance, a business that wants to expand production capacity by building a new plant that does the same thing as an existing plant may choose to not use a pilot plant.

Additionally, advances in process simulation on computers have increased the confidence of process designers and reduced the need for pilot plants. However, they are still used as even state-of-the-art simulation cannot accurately predict the behavior of complex systems.

Scale dependence of plant properties

[edit]

As a system increases in size, system properties that depend on quantity of matter (with extensive properties) may change. The surface area to liquid ratio in a chemical plant is a good example of such a property. On a small chemical scale, in a flask, say, there is a relatively large surface area to liquid ratio. However, if the reaction in question is scaled up to fit in a 500-gallon tank, the surface area to liquid ratio becomes much smaller. As a result of this difference in surface area to liquid ratio, the exact nature of the thermodynamics and the reaction kinetics of the process change in a non-linear fashion. This is why a reaction in a beaker can behave vastly differently from the same reaction in a large-scale production process.

Other factors

[edit]

Other factors that may change during the transformation to a production scale include:

After data has been collected from operation of a pilot plant, a larger production-scale facility may be built. Alternatively, a demonstration plant, which is typically bigger than a pilot plant, but smaller than a full-scale production plant, may be built to demonstrate the commercial feasibility of the process. Businesses sometimes continue to operate the pilot plant in order to test ideas for new products, new feedstocks, or different operating conditions. Alternatively, they may be operated as production facilities, augmenting production from the main plant.

Bench scale vs pilot vs demonstration

[edit]

The differences between bench scale, pilot scale and demonstration scale are strongly influenced by industry and application. Some industries use pilot plant and demonstration plant interchangeably. Some pilot plants are built as portable modules that can be easily transported as a contained unit.

For batch processes, in the pharmaceutical industry for example, bench scale is typically conducted on samples 1–20 kg or less, whereas pilot scale testing is performed with samples of 20–100 kg. Demonstration scale is essentially operating the equipment at full commercial feed rates over extended time periods to prove operational stability.

For continuous processes, in the petroleum industry for example, bench scale systems are typically microreactor or CSTR systems with less than 1000 mL of catalyst, studying reactions and/or separations on a once-through basis. Pilot plants will typically have reactors with catalyst volume between 1 and 100 litres, and will often incorporate product separation and gas/liquid recycle with the goal of closing the mass balance. Demonstration plants, also referred to as semi-works plants, will study the viability of the process on a pre-commercial scale, with typical catalyst volumes in the 100 - 1000 litre range. The design of a demonstration scale plant for a continuous process will closely resemble that of the anticipated future commercial plant, albeit at a much lower throughput, and its goal is to study catalyst performance and operating lifetime over an extended period, while generating significant quantities of product for market testing.

In the development of new processes, the design and operation of the pilot and demonstration plant will often run in parallel with the design of the future commercial plant, and the results from pilot testing programs are key to optimizing the commercial plant flowsheet. It is common in cases where process technology has been successfully implemented that the savings at the commercial scale resulting from pilot testing will significantly outweigh the cost of the pilot plant itself.

Steps to creating a custom pilot plant

[edit]

Custom pilot plants are commonly designed either for research or commercial purposes. They can range in size from a small system with no automation and low flow, to a highly automated system producing relatively large amounts of products in a day. No matter the size, the steps to designing and fabricating a working pilot plant are the same. They are:

  1. Pre-engineering - completing a process flow diagram (PFD), basic piping and instrumentation diagrams (P&ID's) and initial equipment layouts.
  2. Engineering modeling and optimization - 2D and 3D models are created, using a simulation software to model the process parameters and scale the chemical processes. These modeling software help determine system limitations, non-linear chemical and physical changes, and potential equipment sizing. Mass and energy balances, finalized P&ID's and general arrangement drawings are produced.
  3. Automation strategies for the system are developed (if needed). Controls system programming begins and will continue through fabrication and assembly
  4. Fabrication and assembly - after an optimized design has been determined, the custom pilot is fabricated and assembled. Pilot plants can either be assembled on-site or off-site as modular skids that will be constructed and tested in a controlled environment.
  5. Testing - testing of completed systems, including system controls, is conducted to ensure proper system function.
  6. Installation and startup - if constructed offsite, pilot skids are installed onsite. After all equipment is in place, full system startup is completed by integrating the system with existing plant utilities and controls. Full operation is tested and affirmed.
  7. Training - operator training is complete and full system documentation is handed over.

See also

[edit]

References

[edit]
  1. ^ Hans Hellsmark, Johan Frishammar, Patrik Söderholm, Håkan Ylinenpää, The role of pilot and demonstration plants in technology development and innovation policy, Research Policy, Volume 45, Issue 9, November 2016, Pages 1743-1761, ISSN 0048-7333, https://dx.doi.org/10.1016/j.respol.2016.05.005.
  • ^ Pilot Production in Key Enabling Technologies; Crossing the Valley of Death and boosting the industrial deployment of Key Enabling Technologies in Europe, Netherlands Organisation for Applied Scientific Research TNO on behalf of the European Commission, DG GROW—Directorate General for Internal Market, Industry, Entrepreneurship and SME, 2015. ISBN 978-92-79-52140-9
  • ^ David J. am Ende; Mary T. am Ende (28 March 2019). Chemical Engineering in the Pharmaceutical Industry: Active Pharmaceutical Ingredients. Wiley. pp. 1012–. ISBN 978-1-119-28588-5.
  • ^ "Industrial Process Scale Up Capabilities | EPIC Process Experts". EPIC Modular Process. Retrieved 2022-07-23.
  • Bibliography

    [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Pilot_plant&oldid=1116357318"

    Categories: 
    Industrial engineering
    Industrial processes
    Hidden categories: 
    Articles needing additional references from September 2014
    All articles needing additional references
     



    This page was last edited on 16 October 2022, at 04:42 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki