Puketi hydroelectric power plant






Nederlands
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 4°724N 54°3754W / 4.12333°N 54.63167°W / 4.12333; -54.63167
 

From Wikipedia, the free encyclopedia
 


Puketi micro hydro plant
Puketi hydroelectric power plant is located in Suriname
Puketi hydroelectric power plant

Location of Puketi micro hydro plant in Suriname

LocationSipaliwini District, Suriname
Coordinates4°7′24N 54°37′54W / 4.12333°N 54.63167°W / 4.12333; -54.63167
Construction began1980
Opening date7 December 1981
Dam and spillways
Type of damrun-of-the-river
ImpoundsTapanahony River
Power Station
TypeMicro hydro
Turbines1 x Cross-flow turbine
Installed capacity50 kW (67 hp)

The Puketi hydroelectric power plant was a micro hydropower plant constructed near the village of Puketi in Suriname, with a capacity of 50 kW (67 hp). The plant provided electricity between 1981 and 1987 before it went into disrepair. According to hydrologist Rudi van Els, the plant could be rehabilitated,[1] but efforts are now focussed on the construction of the Gran Olo hydroelectric power plant nearby.

History

[edit]

Construction of the micro-hydro plant started in 1980 and was completed in 1981. The plant was opened on 7 December 1981 by President Henk Chin A Sen, and electricity was provided from that day to the villages of Puketi and Futupasi. Electricity meters were installed in the houses connected to the network, and an officer of the Dienst Elektriciteitsvoorziening (DEV) of the Ministry of Natural Resources traveled from Paramaribo to Puketi every few months to collect the bills.[2] After initial plans to use the energy for a cassava mill and a sawmill were abandoned, neighboring villages began pressing for access to the network. In 1985, work began on a 7 kilometres (4.3 mi) long 12 kV overhead power line between Puketi and the Ndyuka capital of Diitabiki, which was also to connect the villages of Moitaki, Jawsa and Mainsi to the grid.[3]

The power consumption of the villages combined exceeded the average of 33 kW produced by the plant, which caused the supply of electricity to be unreliable. To make matters worse, the overhead power line was constructed without lightning conductors, which made it prone to outages. During the Surinamese Interior War, which lasted from 1986 to 1992, the interior of Suriname was out of reach for technicians from Paramaribo, and as such the power plant stopped working somewhere in 1987.[4]

In 1995, INGRO NV Engineering consultants proposed to rehabilitate the power plant, but nothing substantial happened before a delegation of the Anton de Kom University of Suriname visited the site in September 2003. This delegation under the leadership of professor Sieuwnath Naipal was sent by the Ministry of Regional Development to investigate the possibilities for hydroelectric power in the area, but rather than proposing the rehabilitation of the existing facility, Naipal set up a follow-up mission in February 2004 to investigate other sites nearby with the potential to generate more electricity. Going by the advice of Naipal and his team, the Ministry of Regional Development eventually decided to construct the Gran Olo hydroelectric power plant nearby.[5] Although the most effort is now dedicated to the construction of the latter plant, the rehabilitation of the old Puketi hydroelectric power plant remains a possibility.[1]

Technical specifications

[edit]

The power plant operated on one Michell-Bánki cross-flow turbine. The minimum hydraulic head was set at 2.5 metres (8 ft 2 in) and the maximum head at 4.6 metres (15 ft). The maximum flow rate was calculated for 1,390 litres per second (49 cu ft/s).[6]

Notes

[edit]
  1. ^ a b Van Els 2012, p. 287.
  • ^ Van Els 2012, pp. 281–283.
  • ^ Van Els 2012, p. 284.
  • ^ Van Els 2012, pp. 285–286.
  • ^ Van Els 2012, p. 286.
  • ^ Van Els 2012, pp. 281–282.
  • References

    [edit]

  • iconWater portal
  • iconRenewable energy portal

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Puketi_hydroelectric_power_plant&oldid=1152909817"

    Categories: 
    Hydroelectric power stations in Suriname
    Sipaliwini District
    Energy infrastructure completed in 1981
    1981 establishments in Suriname
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Coordinates on Wikidata
    Pages using infobox dam which are not about dams
     



    This page was last edited on 3 May 2023, at 01:32 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki