Qiaowan
桥湾 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]()
Platform
| |||||||||||
General information | |||||||||||
Location | Zhushikou East Street (珠市口东大街) Dongcheng District, Beijing China | ||||||||||
Coordinates | 39°53′34″N 116°24′30″E / 39.892725°N 116.408464°E / 39.892725; 116.408464 | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 28, 2014 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Qiaowan Station (simplified Chinese: 桥湾站; traditional Chinese: 橋灣站; pinyin: Qiáowān Zhàn) is a stationonLine 7 of the Beijing Subway. It was opened on December 28, 2014, as a part of the stretch between Beijing West railway station and Jiaohuachang and is located between Zhushikou and Ciqikou.[1]
The station has an underground island platform.
There are 3 exits, lettered B, C, and D. Exit D is accessible.
| |
---|---|
Line 7 |
|
Stations that are proposed, under planning or under construction are shown in italics. |
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it. |