Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Identifying number  





2 Cascading RISSP  





3 Multiple directions  





4 Control boundaries  





5 Authorisation  





6 References  














RISSP







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


RISSP stands for Record of Inter System Safety Precautions .[1] It is a written record of inter-system safety precautions to be compiled in accordance with the provisions of Operating Code no. 8 (OC8).[2] Where a High Voltage electrical boundary occurs, for instance between a power station and electrical utility, the safety controllers each side of the boundary must co-ordinate their activities. For the electrical transmission systeminEngland, Wales and Scotland, the Ofgem-defined industry standard document OC8 of the Grid code defines how safety precautions can be managed with the Record of Inter System Safety Precautions (RISSP) independently from the safety rules of the connected parties. The purpose of the RISSP is to guarantee that safety precautions provided by a third-party can be quoted in a safety document so that work can take place.

Identifying number[edit]

The RISSP form must have a uniquely identifying number, provided by the party requesting safety precautions. To achieve this, all parties connected to the national grid must have a RISSP prefix code. These are, in general, abbreviations of the company name at the time it applied for its code. All RISSPs have the suffix 'R'. The requester states the location and equipment that requires the RISSP. The implementer then states the location and nature of the precautions provided for adequate safety of that equipment.

Cascading RISSP[edit]

Some interfaces may include more than two parties, for instance on substation busbars (BB). This may require one request via a party on the BB to go via the BB controller to the other parties. It is then for the BB controller to get all required safety from other parties to cascade on to the initial requesting controller. This is sometimes referred to as a cascading RISSP. Where a third-party making a request for safety precautions controls some of the other infeeds to an interface on which safety has been requested (such as a distribution network operator who has more than one circuit on a BB, but is requesting safety for just one of those circuits) it is up to the requester themselves to control the linked safety precautions to ensure that safety from the interface. This is often referred to as linkage. It is possible to have both linkage and cascading in a single job, requiring use of RISSP forms with multiple users.

Multiple directions[edit]

In addition it is possible for to request safety in multiple directions, which results in controllers having both requesting and implementing RISSPs in force simultaneously. These RISSPs may be cascading and/or linkage. It is not possible to have RISSPs going in multiple directions if HV testing is taking place across a boundary. In these circumstances only a single safety document can be in force at any one time and any RISSPs in place can only be to ensure the safety precautions for this document.

Control boundaries[edit]

RISSPs do not have to be from one company to another, only one control boundary to another. Thus two distribution network operators owned by the same parent company but with different geographical areas of responsibility use RISSPs with each other. Also, the boundary between a High Voltage controller and a Low Voltage controller can be controlled by the RISSP process. This most commonly occurs with the fuses/links between an auxiliary transformer and a substation's 415 volt AC supplies.

Authorisation[edit]

RISSPs can only be agreed to and signed by a suitably authorised person. Any company that is connected to the grid must have somebody authorised available or on call at all times.

References[edit]

  • ^ "Archived copy" (PDF). Archived from the original (PDF) on 2011-06-06. Retrieved 2010-01-12.{{cite web}}: CS1 maint: archived copy as title (link)

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=RISSP&oldid=1214904313"

    Categories: 
    Electric power
    National Grid (Great Britain)
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from April 2018
    Articles with permanently dead external links
    CS1 maint: archived copy as title
     



    This page was last edited on 21 March 2024, at 22:52 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki