Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  1996 construction accident  







2 Description  





3 References  





4 External links  














Rambler Channel Bridge (railway bridge)






Euskara


 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 22°2124.9N 114°644.5E / 22.356917°N 114.112361°E / 22.356917; 114.112361
 

From Wikipedia, the free encyclopedia
 


Rambler Channel Bridge
Tsing Lai Bridge viewed from Tsing Yi
Coordinates22°21′25N 114°06′45E / 22.3569°N 114.1124°E / 22.3569; 114.1124
CarriesTung Chung line
Airport Express
CrossesRambler Channel
LocaleKwai Chung, Hong Kong
Characteristics
MaterialConcrete
Total length1,100 m
History
DesignerBouygues Travaux Publics
Constructed byDragages Hong Kong-Penta-Ocean ConstructionJV
Construction startOctober 1995; 28 years ago (1995-10)
Construction endFebruary 1997; 27 years ago (1997-02)
Construction cost$490 million
Opened21 June 1998; 25 years ago (1998-06-21)
Location
Map

The Rambler Channel Bridge is a quadruple-track railway bridgeinHong Kong. It carries the MTR's Airport Express and Tung Chung line over the Rambler Channel, linking Tsing Yi station and Lai King station.

History[edit]

In 1994, the Mass Transit Railway Corporation awarded the contract to design and construct the bridge to Dragages et Travaux Publics, in partnership with Penta-Ocean Construction.[1] The contract was worth $490 million.[1] The bridge was designed by Bouygues Travaux Publics.[2] Construction began in October 1995.[3] It was structurally completed in February 1997.[4] The bridge began carrying revenue passengers with the opening of the Tung Chung line on 21 June 1998.[5]

1996 construction accident[edit]

Six construction workers were killed when a metal work platform collapsed on 6 June 1996.[6] The platform, which held four men, plunged 20 metres and crushed two workers below.[7] The men were rushed to Yan Chai Hospital in nearby Tsuen Wan and declared dead shortly after arrival at 6:00 pm.[8]

Those killed were engineer Tam Wai-shing, 40; Yeung Sung-po, 50; Shek Shing, 58; Wong Kam-wo, 30; and brothers-in-law Law Tai-yau, 36, and Cheng Chi-ming, 33.[7]

The Labour Department launched an investigation to determine the cause of the accident. It was aided by specialists from the Electrical and Mechanical Services Department and the Buildings Department.[6] Construction of the bridge was temporarily halted and the Labour Department inspected all similar work platforms across the territory.[9]

The tragedy was blamed on the wrong type of bolt being used to affix the work platform to a concrete pillar.[7] A Coroner's Court inquest before coroner David Thomas heard that the anchor bolts were only half the length required, were designed to hold electric cables, and were screwed into plastic sockets.[7] The platform collapsed after two of the bolts detached.[7] The weight on the platform exceeded four tonnes, or three times more than the bolts could support.[10]

On 4 December 1996, the Labour Department issued summonses to Dragages et Travaux Publics; its manager, Didier Noel; and subcontractor Takamura Limited (which built the platform), under charges of breaching general duties provisions under the Factory and Industrial Undertakings Ordinance.[11] Dragages was accused of not providing sufficient training to workers, and failing to ensure the safety of the platform.[12] A representative for Takamura argued against prosecuting the company as it was only responsible for installing the platform.[11]

Dragages et Travaux Publics was found solely responsible for the collapse.[13] The company was fined HK$105,000 on 8 August 1997 after admitting to three charges of failing to ensure safety and failing to maintain properly built scaffolding. In October 1997 Takamura Limited (also known as Pacific Island Consultants) was cleared of responsibility for the accident.[13]

The tragedy was the single greatest loss of life during the Airport Core Programme.[14]

Description[edit]

The bridge is 1,100 metres long.[5] It is made up of precast concrete segments lowered into place by a launching gantry.[5] The bilevel main deck segments are eight metres high and weigh 120 tonnes each.[5] The segments are held together with epoxy glue and high-strength steel tendons.[3]

References[edit]

  1. ^ a b Wallis, Keith (29 November 1994). "MTRC awards $1.4b in new airport orders". South China Morning Post. p. 3.
  • ^ "Rambler Channel Rail Bridge". Bouygues Asia. Retrieved 7 June 2016.
  • ^ a b Wallis, Keith (7 June 1996). "Pieces held in place by glue". South China Morning Post. p. 3.
  • ^ Howlett, Bob, ed. (1997). Hong Kong Yearbook 1997. Hong Kong: Information Services Department.
  • ^ a b c d "Rambler Channel Rail Bridge". Dragages Hong Kong. Retrieved 7 June 2016.
  • ^ a b "Platform tests ordered after death plunge". South China Morning Post. 9 June 1996. p. 4.
  • ^ a b c d e Chin, Michelle (16 January 1998). "`Wrong bolts used' in collapsed platform". South China Morning Post. p. 3.
  • ^ Chin, Michelle (7 June 1996). "Sisters mourn men in bridge tragedy". South China Morning Post. p. 3.
  • ^ Lee, Naomi; Wong, Billy Wai-yuk (10 June 1996). "Tragedy may delay airport bridge project". South China Morning Post. p. 3.
  • ^ Chin, Michelle (17 January 1998). "Warning on fatal misuse of materials". South China Morning Post. p. 5.
  • ^ a b Delfino, Brendan; Szeto, Wanda (5 December 1996). "Viaduct deaths firm charged". South China Morning Post. p. 3.
  • ^ Chin, Michelle (16 January 1997). "Companies accused on safety". South China Morning Post. p. 7.
  • ^ a b Poole, Oliver (10 October 1997). "Firm cleared over platform deaths". South China Morning Post. p. 6.
  • ^ Gren, Manuel (3 August 1998). "Campaign on airport project deaths allowed at terminal". South China Morning Post. p. 3.
  • External links[edit]

    22°21′24.9″N 114°6′44.5″E / 22.356917°N 114.112361°E / 22.356917; 114.112361


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Rambler_Channel_Bridge_(railway_bridge)&oldid=1227668406"

    Categories: 
    Tsing Yi
    Railway bridges in Hong Kong
    MTR
    1996 industrial disasters
    Bridges completed in 1998
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from October 2017
    Use Hong Kong English from October 2017
    All Wikipedia articles written in Hong Kong English
    Infobox mapframe without OSM relation ID on Wikidata
    Pages using infobox bridge with empty coordinates parameter
    Commons category link is on Wikidata
    Coordinates on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 7 June 2024, at 04:26 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki