Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Planning  





1.2  Opening  





1.3  Second World War  





1.4  Post war  





1.5  Smallest public railway in the world  





1.6  The Romney, Hythe & Dymchurch Railway Association  







2 Stations  



2.1  Stations currently open  





2.2  Stations closed  





2.3  Stations proposed  







3 Way and works  



3.1  Permanent Way  





3.2  Way and works data  







4 Signalling  



4.1  Signal boxes  







5 Locomotives  



5.1  Locomotives in service  





5.2  Locomotive names  





5.3  Locomotives withdrawn from service  





5.4  Locomotives on site  







6 Freight traffic  



6.1  Freight services  



6.1.1  Dungeness fish trade  





6.1.2  Uncrushed shingle transport  





6.1.3  Postal service  





6.1.4  Parcels service  







6.2  Freight vehicles  







7 Passenger traffic  



7.1  Passenger services  





7.2  Passenger vehicles  







8 Armoured train  





9 Proposed extension to Sandling  





10 Tenders  



10.1  Greenly tenders  





10.2  Ashford tenders  





10.3  Tender shortage  







11 Safety  



11.1  Incidents  





11.2  Level crossings  







12 Ownership and operation  



12.1  Ownership  





12.2  Directors  





12.3  Operation  







13 See also  





14 Notes  





15 Sources  





16 External links  














Romney, Hythe and Dymchurch Railway






Čeština
Deutsch
فارسی
Nederlands

Русский
Suomi
Svenska
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 51°2N 1°0E / 51.033°N 1.000°E / 51.033; 1.000
 

From Wikipedia, the free encyclopedia
 


Romney, Hythe and Dymchurch Railway
Northern Chief at New Romney
Overview
LocaleKent, South East England
Termini
  • Dungeness
  • Stations8
    Websitewww.rhdr.org.uk Edit this at Wikidata
    Service
    TypeLight railway
    Operator(s)Romney, Hythe & Dymchurch Railway Co.
    Depot(s)New Romney
    History
    Opened1927
    Technical
    Line length13+12 miles (21.7 km)
    Number of tracks2 (north of New Romney), 1 (south of New Romney with passing loops at the stations)
    Track gauge15 in (381 mm)
    Operating speed25 mph (40 km/h)

    Route map

    The Romney, Hythe & Dymchurch Railway, 1927 and 1928 sections, showing the location within Kent, and proximity to other railways. The red line is the boundary of Kent.
  • t
  • e
  • Romney, Hythe &
    Dymchurch Railway

    Hythe

    Prince of Wales Halt

    Prince of Wales Bridge
    over Burmarsh Road

    Freight siding

    Botolph's Bridge Halt

    Botolph's Bridge Road

    New Cut

    Burmarsh Road

    Burmarsh Road

    Eastbridge Road

    Dymchurch

    St Mary's Road

    Golden Sands Halt

    St Mary's Bay

    Jefferstone Lane

    New Sewer

    Duke of York Camp
    branch sidings

    Warren ballast pit line

    Warren Halt

    Romney Depots

    New Romney

    Greatstone Dunes

    Baldwin Road

    Seaview Road

    Maddieson's Camp

    Romney Sands crossing

    Romney Sands

    War Department Halt

    Derville Road

    Hull Road

    Taylor Road

    Lade

    Williamson Road

    Kerton Road

    former turning triangle

    Battery Road

    The Pilot Inn

    Dungeness Road

    Beach Fish Line

    Britannia Points Halt

    Britannia points

    Dungeness

    The Romney, Hythe and Dymchurch Railway (RH&DR) is a 15 in (381 mm) gauge light railwayinKent, England, operating steam and internal combustion locomotives. The 13+12-mile (21.7 km) line runs from the Cinque PortofHythe via Dymchurch, St. Mary's Bay, New Romney and Romney Sands to Dungeness, close to the Dungeness nuclear power stations and Dungeness Lighthouse.[1] The line is double track north of New Romney and single track south.

    History[edit]

    Planning[edit]

    The railway was the dream of millionaire racing drivers Captain John Edwards Presgrave ("Jack") Howey and Count Louis Zborowski. The latter had constructed a railway at Higham Park, his home at Bridge, Kent, and agreed to donate the rolling stock and infrastructure to the project. However, he was killed in a motor racing accident at the Monza Grand Prix on 19 October 1924 before the Romney Marsh site was chosen, and Howey continued the project alone.

    After Howey had unsuccessfully attempted to buy the Ravenglass and Eskdale Railway and extend it, he investigated a greenfield site between Burnham-on-Sea and Weston-super-Mare in Somerset and offered to buy the Hundred of Manhood and Selsey Tramway in Sussex, Henry Greenly drew Howey's attention to the potential for a 15-inch gauge line between New Romney and Hythe. Howey first visited New Romney on 8 September 1925 and decided there and then that it was an ideal location for his proposed railway.[2]

    The railway would cross public highways, and would need to acquire land from a number of different owners. Thus a Light Railway Order under the Light Railways Act 1896 was necessary and was applied for in November 1925. A Public Inquiry was held by the Light Railway Commissioners in the Assembly Rooms at New Romney on 15 and 16 January 1926.[3] The Minister of Transport indicated his intention to approve the application on 19 February 1926 and The Romney, Hythe & Dymchurch Light Railway Order 1926 was made on 26 May.[4] This incorporated the Romney, Hythe & Dymchurch Light Railway Company as a statutory public utility undertaking, gave it powers to construct and work the proposed railway and also included compulsory purchase powers over the land required (which ultimately had to be used to acquire six plots of land on the proposed route).[2]

    During construction, the Duke of York (later King George VI) visited the railway on 5 August 1926 and drove Northern Chief, hauling a train with about 100 passengers from Jesson Halt to New Romney and back.[5]

    Opening[edit]

    The railway was opened on 16 July 1927 by Lord Warden of the Cinque Ports, William Lygon, 7th Earl Beauchamp.[6] The locomotives were designed by Henry Greenly who was commissioned by Howey to work on the construction of the entire railway[7] and became the railway's first chief engineer until his abrupt resignation in March 1929.[2] Mountain Class Hercules hauled the inaugural train from Hythe to New Romney, with guests including the mayors of the two towns and General Sir Ivor Maxse.

    Howey was not satisfied with just 8+14 miles (13.3 km) of track from Hythe to New Romney and plans were in hand for an extension even before the original section had opened. The line was to be extended 5+12 miles (9 km) from New Romney to Dungeness, double-tracked throughout apart from a balloon loop on which the station at Dungeness was sited. A Light Railway Order for this extension was applied for and, following a Public Inquiry on 18 April 1928, the Romney, Hythe & Dymchurch Light Railway (Extension) Order was granted on 12 July 1928. Ahead of this the line between New Romney and The Pilot had actually opened on 24 May 1928 and the rest of the line through to Dungeness opened on 3 August 1928.[8] Since it was laid directly onto the shingle forming the Dungeness peninsula it has been suggested that the extension was the most cheaply constructed railway in the world.[9]

    Second World War[edit]

    Troops from the Somerset Light Infantry manning the armoured train in October 1940.

    In 1940 the railway was taken over by the military during World War II, and a miniature armoured train was used on the line.[10] It was also used by the Department of Petroleum Warfare in the construction of PLUTO ("Pipe Line Under The Ocean") intended to supply fuel to the Allied forces after the D-Day Normandy landings. During the latter stages of the construction of PLUTO considerable damage was caused to the track on the extension when, to speed up the work, lengths of pipe were dragged along the trackbed by bulldozers, resulting in its reduction to a single track after the war.[2]

    Post war[edit]

    Hythe station with train in 1962

    The line re-opened between Hythe and New Romney in 1946, the New Romney to Dungeness section following with a formal opening by Laurel and Hardy on 21 March 1947.[11] Regular services started on 29 March 1947.

    In June 1947 the Duke of Westminster's railway from Eaton Hall, Cheshire was transported by the Great Western Railway and Southern Railway from Balderton, CheshiretoNew Romney in Kent. It comprised an engine, nine coaches and trucks, and track totalling 222 tons.[12]

    In 1949, Captain Howey bought the Duke of Sutherland's private train including engine Dunrobin and 60 feet (18 m) coach for the museum at New Romney. It was transported there in 1950[13] and displayed until sold in 1963.

    From 7 September 1977 until 24 July 2015, the railway provided school trains to transport children to and from the Marsh Academy in New Romney. The service was finally withdrawn due to falling usage.[14]

    The railway's role as part of the local public transport network was extended when Warren Halt re-opened in 2009, providing a link to the Romney Marsh Visitor Centre. Further discussions with local councils took place regarding the possible expansion of Burmarsh Road and the provision of a new station at the gravel pits in West Hythe, in connection with both the proposed extensive new housing construction and the need to provide alternative transport to the A259 coast road.[15]

    The railway, which carries over 150,000 passengers each year,[16] celebrated its 95th birthday in 2022 with a 2-day steam and diesel gala.

    Smallest public railway in the world[edit]

    From 1926 to 1978, the RH&DR held the title of the "Smallest public railway in the world" (in terms of track gauge). The title was lost to the 12+14 in (311 mm) gauge Réseau GuerlédaninFrance in 1978[17] and regained in 1979 when that line closed. It was lost again in 1982 when the 10+14 in (260 mm) gauge Wells and Walsingham Light Railway opened.

    The railway has featured in several television and radio shows including an episode of the BBC series The Inspector Lynley Mysteries in 2006,[18] Harry Secombe's Highway on 8 September 1991,[19] Michael Bentine's It's a Square World in 1964,[20] BBC's Multicoloured Swapshop (filmed on 20 February 1978)[21] and children's show Rainbow.[citation needed]

    The Romney, Hythe & Dymchurch Railway Association[edit]

    Formed in 1967 as a supporters association, and regarded with some suspicion by the railway's management of the time, the association has become a significant contributor to the railway's continuance and refurbishment. It is now the largest single shareholder in the railway and its members provide a significant input of voluntary labour on both operating and maintenance work.[failed verification] It became a registered charity on 23 January 2009.[22] At 31 December 2015 its membership stood at 3,355.[23]

    Stations[edit]

    Stations currently open[edit]

    No 2 Northern Chief awaits the signal at Hythe station.

    Stations in full or limited use:

    Stations closed[edit]

    Those shown as 'halt' never had a higher status; all stations below became halts prior to their closure.

    Stations proposed[edit]

    Stations which never existed but were at one time proposed by the directors or are currently under consideration:

    Way and works[edit]

    Permanent Way[edit]

    The line was originally laid using second-hand First World War surplus rail. Most was 25 lb/yd (12 kg/m) material rolled in the US, the rest was 12 kg/m (25 lb/yd) rolled in Belgium when the country was under German occupation.[27] In the late 1960s and early 1970s the railway managed to obtain supplies of good second-hand 30 lb/yd (15 kg/m) rail on the closure of the Sierra Leone Government Railway;[27] these are the oldest rails on the line, some of which date from the 1890s.

    During the mid-1980s the company began obtaining brand new 25 lb/yd rail from Luxembourg before switching to 30 lb/yd material produced British Steel Track Products in Scunthorpe and later obtained further supplies of the same from South Africa. The present standard rail for relaying work is 35 lb/yd (17 kg/m) obtained from a manufacturer in Spain.

    The original sleepers were creosoted Baltic fir spaced at 22-inch (560 mm) centres.[25] These have now been entirely replaced by second-hand standard gauge sleepers cut into thirds, creosoted douglas fir, or jarrah and karri (Australian hardwoods from the eucalyptus family).

    The railway has a Permanent Way team, with a full-time staff of platelayers. It forms part of the larger Engineering Department. Some platelayers work all year round, whilst others are diverted to other seasonal employment within the engineering department, for example as summer drivers, when more drivers are required than during the out of season periods. Additionally, the permanent way team is strengthened on many days of the year, especially in the winter months, by volunteer workers.

    Way and works data[edit]

    The longest underline bridge is Collins Bridge, with a span of approximately 60 feet (18 m).[27] The summit of the line is 20 ft (6.1 m) above Ordnance Datum, located between Hull Road and Taylor Road, Lydd-on–Sea.[28] The ruling gradient is 1 in 75 at the Dungeness end of New Romney Station rising from the Littlestone Road Tunnels.[29] The tightest curve measures 6.8 chains (450 ft; 140 m) radius and is at the Hythe end of 'The Deviation', a dogleg section of track at Pennypot on the outskirts of Hythe.[30]

    The ruling gradient and tightest curve are the results of post-1972 reconstruction work. Pre-1990 references to these give out-of-date figures. Statements in a number of books claiming the summit of the line is at Star Dyke (a point approximately midway between Burmarsh Road level crossing and Willop Sewer) are only partly correct; whilst it is the highest point between Hythe and New Romney[31] it is not the highest on the entire line.

    Signalling[edit]

    Signal boxes[edit]

    Hythe Signal Box
    New Romney station view north from the platform with signals and engine sheds.

    There were originally six signal boxes on the first section of the line to open (Hythe to New Romney). All were equipped with Greenly designed fully interlocked lever frames constructed by Jackson Rigby Ltd at New Romney. These were:

    Hythe - 16 levers controlling points and signals within the station area. Now the only original Jackson Rigby lever frame in existence.

    Palmarsh - although this building is known to have existed there is doubt about whether the 8 lever Jackson Rigby frame it contained was ever fully connected up. The frame was later transferred to Greatstone (see below). The box itself had vanished by the late-1940s.

    Burmarsh Road - 2 levers located in the booking office and controlling signals. The station building had vanished by the mid-1950s.

    Dymchurch - confusion surrounds the number of levers in this box, with different sources quoting 10,[32]12[33] and 16.[34] The box had vanished by 1963 and signalling is controlled here today by a push button electronic panel in the booking office and a 2 lever ground frame released by an Annett's key normally held in the signal panel.

    Holiday Camp – this building is known to have been erected on land owned by Allnatt Ltd since it is marked on the plans accompanying a combined conveyance/lease concluded by the railway with that company and is shown as measuring 12 by 6 ft (3.7 by 1.8 m).[35] Some rather poor quality photographic evidence of the existence of this box also exists. There is uncertainty as to whether it was ever brought into use though and if so how many levers it contained.

    New Romney – 17 levers controlling points and signals within the station area. The lever frame was enlarged to the present 24 levers when the line was extended to Dungeness in 1928.[25]

    The extension to Dungeness led to the enlargement of the lever frame at New Romney (as mentioned above) and also the opening of two new signal boxes:

    Greatstone - the 8 lever frame originally at Palmarsh was transferred here and installed in the booking office.[36]

    Dungeness - like Dymchurch it is uncertain how many levers this box actually contained.

    Arrangements for working the temporary turning wye at The Pilot are not known.

    Locomotives[edit]

    Locomotives in service[edit]

    Including engines serviceable, under overhaul, awaiting overhaul, or reserved to shunting or engineering duties.[37]

    No Name Picture Livery Locomotive type Wheel
    arrangement
    Builder Year built Whistle
    1 Green Goddess Green Goddess LNER Apple Green Steam 4-6-2 Davey Paxman & Co. 1925 Small Chime
    2 Northern Chief Northern Chief Brunswick Green Steam 4-6-2 Davey Paxman & Co. 1925 Bulleid
    3 Southern Maid Southern Maid SE&CR Green Steam 4-6-2 Davey Paxman & Co. 1926 ex-Isle of Wight Hooter
    4 The Bug The Bug Improved Engine Green Steam 0-4-0T+T Krauss, Munich 1926 RH&DR
    5 Hercules Hercules Midland Railway Maroon Steam 4-8-2 Davey Paxman & Co. 1927 GWR Hall
    6 Samson Samson Prussian Blue Steam 4-8-2 Davey Paxman & Co. 1927 US Crosby
    7 Typhoon TyphoonNR Southern Railway Malachite Green Steam 4-6-2 Davey Paxman & Co. 1927 BR Crosby
    8 Hurricane Hurricane Caledonian Railway Blue Steam 4-6-2 Davey Paxman & Co. 1927 Chrome LNER A4
    9 Winston Churchill Winston Churchill Maroon with yellow lining Steam 4-6-2 Yorkshire Engine Company 1931 Crosby
    10 Dr Syn Dr Syn Black with Yellow lining Steam 4-6-2 Yorkshire Engine Company 1931 LNER A4 from 4491 'Commonwealth of Australia'
    11 Black Prince Black Prince DB Black/Red Steam 4-6-2 Krupp, Essen 1937 Fowler
    12 J.B. Snell John Southland Black/Yellow Diesel-Mechanical Bo-Bo TMA Engineering 1983 2-Tone Horn (AirChime, Ltd)
    14 Captain Howey Captain Howey Blue/Silver Diesel-Mechanical Bo-Bo TMA Engineering 1989 2-Tone Horn (AirChime, Ltd)
    PW1 Simplex Green Diesel-Mechanical 4wdDM Motor Rail Ltd. (Simplex Wks) 1938 None
    PW2 Scooter WD Grey Petrol-Mechanical 0-4-0PM RH&DR 1949 Ex Fire Engine
    PW3 Red Gauntlet Red Petrol-Mechanical 0-4-0PM Jacot / Keef 1964 / 1975 Halfords

    Locomotive names[edit]

    Locomotives withdrawn from service[edit]

    This list includes engines sold, scrapped, failed in trials, or otherwise withdrawn. All engines were internal combustion locomotives.

    Name or designation Wheelarrangement Builder Year built Year withdrawn Notes
    Super-Scooter (JAP Scooter) Ultra-light

    4-wheel scooter

    RH&DR Was made by putting a two cylinder engine on a wagon chassis
    War Department Locomotive 4-wheel scooter War Department 1929 1949 The only privately owned locomotive to have seen long-term service on the RH&DR. Stabled at Hythe engine shed, worked the War Department branch line. Remained in RH&DR service briefly after the branch line closed. Used extensively as the basis for construction of locomotive PW2.
    Rolls-Royce Locomotive Bo2' RH&DR 1961
    Firefly 0-6-0 HCS Bullock (rebuilt RH&DR) 1936 (rebuilt 1945) 1947 Although a 10+14 in (260 mm)gauge engine, Firefly was liveried and lettered as a RH&DR locomotive, and operated the post-war shuttle service when part of the line from New Romney to Warren Halt was temporarily re-gauged to 10+14 in (260 mm) gauge. From 1947 the engine formed part of Howey's alternative project which became the Hastings Miniature Railway.[citation needed]
    Royal Anchor B-B Charles Lane of Liphook 1956 1956 Diesel Hydraulic double-ended (two cabs) locomotive, built for RH&DR service (as the Rolls-Royce locomotive was near withdrawal). Royal Anchor failed trials due to lack of power. The project was abandoned and the locomotive returned to Liphook. It operated on the R&ER 1960–1977, and then at Carnforth 1977–2000. It is now operating privately in the USA.

    Locomotives on site[edit]

    In addition to the railway's own 16 locomotives, one additional engine is currently housed at New Romney. This is a partially constructed third-scale reproduction of an LMS Princess Coronation Class locomotive, commonly known as the 'Duchess' type (although of the 38 engines of this class, only 10 were named after duchesses). The replica was commissioned by Paul Riley, a director of the railway, as a private project and is currently stored in an engineers' depot.[38] Following the unexpected death of Mr Riley on 4 June 2008 the future of this locomotive is currently unknown. It is understood that the machine is more than half complete.[39] This Locomotive was removed from the railway earlier this year and is currently (Summer 2023) up for sale with the Denver Light Railway

    Freight traffic[edit]

    Freight services[edit]

    From the outset, the railway's owners and designers envisaged freight services. Two of the original locomotives (No 5 Hercules and No 6 Samson) were built to the 'mountain' wheel arrangement (4-8-2), unique on any British railway and giving the ability to haul heavy freight with only a small loss of speed when used on passenger work. In the early years the railway carried a limited amount of freight (mainly shingle and fish traffic). A goods shed was built at New Romney and featured dual gauge track allowing easy transfer between the standard and 15-inch gauges. This was seldom used and was demolished in about 1934.

    The greater part of the railway's freight traffic in the early years was carried for the War Department, who made extensive use of the line to convey materials and equipment for the construction of the reinforced concrete sound ranging detectors they were experimenting with near Greatstone. A special siding was laid in joining their working site with the RHDR main line (the course of which can still be traced today [2016]) and the WD constructed their own locomotive to work their trains.

    From time to time, the railway has had short term ad hoc freight contracts, for example one in 1975 to transport drainage pipes. The most recent freight workings involved delivering gas mains from New Romney to Greatstone in 1989. As a publicity stunt the first gas main train was steam hauled using No 4 The Bug, which appeared on the local TV news that evening.

    The railway operates its own engineering and permanent way trains, which now form the majority of its non-passenger workings.

    Dungeness fish trade[edit]

    There are several disused sidings on the beach at Dungeness. These were used by fishermen to help move their hauls across the shingle. This joint provision was to allow transport of fish from Dungeness to Hythe and there to transfer it to road. The company had four-wheel fish wagons, stencilled "Fish Only". The service was developed from 1937 following closure of the South Eastern Railway's Dungeness line that year. The fish trade developed in a small way and was withdrawn. Two such sidings are still in place but are both in a very poor state of repair although they were used by fishermen to transport fish across the beach for many years after the main railway service was withdrawn.

    To facilitate the transfer of this traffic from rail to road on its arrival at Hythe the track serving Platform 1 there extended into the car park for some years.[9][verification needed]

    Uncrushed shingle transport[edit]

    The most successful freight service was the uncrushed ballast service. Following withdrawal of War Department operations over their siding near Maddieson's Camp, the railway utilised the infrastructure to operate ballast trains. In 1937 a subsidiary ballast company was formed. Tipper wagons (skips) were loaded with shingle and transported along the branch line and then up the main line to Hythe, often lying over in the sidings at Dymchurch to prevent delay to passenger trains using the same tracks. At Hythe the wagons were originally pushed by the locomotive up a concrete ramp and the wagons tipped into a large concrete holding bin or directly into waiting lorries, a precarious practice which was later replaced by mechanical haulage up the ramp. After the war the Hythe workings were cut back and the wagons were unloaded in a siding (in what is now New Romney station car park), the remnant of which is now used for loading coal into loco tenders. This practice did not last long and a purpose built siding and ramp was installed south of New Romney on the Dungeness line. The fence line can still be seen. In 1951, after 14 years, the subsidiary company switched to entirely road transport and the company closed the branch and the freight incline.[2][verification needed] At Hythe, the concrete pillars were still visible until the early 1980s when they were demolished to allow access to the car park extension along the former platform 4 and engine release siding.

    Postal service[edit]

    The railway is licensed by the Post Office for rail postal services, and is entitled to issue postage stamps. A number of first day covers have been issued. A four-wheel secure postage wagon was constructed.

    Parcels service[edit]

    The railway operates a casual parcels service. Parcels handed in at one station will be delivered to another for collection. This is the last remnant of the railway's freight services.

    Some of the freight wagons behind No 2

    Freight vehicles[edit]

    The railway has permanent way stock, examples of which include:

    Passenger traffic[edit]

    Passenger services[edit]

    The Romney, Hythe & Dymchurch Railway No 8 Hurricane

    The railway was conceived and constructed as a public service, not as a tourist attraction, although it now relies on tourist trade.

    School children were transported under contract to Kent County CounciltoThe Marsh Academy (known as Southland's Comprehensive School until 2007); this service was provided all year during term time. The contract ceased due to falling passenger numbers after the summer term in July 2015. Local residents are transported to shopping centres and the railway has operated 'shoppers specials'. Holiday camp trains have operated with camps at Romney Sands, St Mary's Bay and Dymchurch. Charters are operated as required. During the Second World War the railway was operated by The Royal Engineers and later the Somerset Light Infantry as a military railway and there was extensive transport of soldiers on troop trains.

    Passenger vehicles[edit]

    At the outset the railway was equipped with four-wheeled 8-seater coaches designed by Henry Greenly and his son Kenneth. 117 of these had been built by 1928.[2] With only half height doors and no glazing except in the end bulkheads these were totally unsuitable for winter operation, especially to Dungeness. In 1928 the railway took delivery of eight fully enclosed 12-seat bogie coaches built by the Clayton Carriage & Wagon Company of Lincoln which incorporated electric lighting and steam heating.

    In 1934 Howey decided to scrap all the original four-wheelers and replace them with fully enclosed bogie vehicles. The 16-foot underframes for these were constructed by Robert Hudson Ltd of Leeds and the bodies were built locally by the Hythe Cabinet & Joinery Works Ltd. By June 1936 54 of these together with two matching vans had been taken into stock.[2]

    The RH&DR now operates 20-seat and 16-seat open and closed coaches. These have been built on four different types of underframe:

    The first batch of 20-seater closed coaches were bodied with utile and numbered 51 to 61 inclusive. From coach 62 onwards aluminium has been used.

    Over 80 years, the coach livery has changed from all-over green to brown and cream, blue, blue and cream, green and cream, chocolate and cream, and red and cream in the late 1980s. Since 2000, rakes of coaches (trains of around a dozen coaches) have been painted in individual liveries and there are now maroon, green, blue, crimson and teak coaches; 'Heritage' coaches are chocolate and cream.

    The railway has built several coaches to accommodate wheelchair users, starting with driving trailer coach 105 (heavily re-built after extensive accident damage in 1993 and later named Marjorie) followed by 601 Elsie, then 602 Winn and 603 May.

    A new coach design featuring a lower floor, for easier loading, and a higher roof-line, giving better headroom for wheelchair users, was introduced in 2015. The first, Phylis, is painted lined brown and normally runs with the teak coaches. Two further coaches, Iris for the green set and Edith May for the teak/chocolate set, are under construction and will carry batteries in a compartment over one end bogie for coach lighting. As well as the wheelchair compartment, which has tip-up seats, each will have a guard's compartment with (emergency) brake valve, vacuum gauge, side ducket lookouts and a standard seating compartment. The guard's compartment has four seats and may be used by passengers when not in use by the guard

    In addition to the main stock, the 'Heritage' set is made up of:

    Armoured train[edit]

    Romney, Hythe and Dymchurch Railway armoured train, October 1940

    During World War II, a miniature armoured train was used on the line to patrol the coast in case of invasion. The train consisted of No 5 Hercules and a few wagons fitted with armour plating and armed with a Boys anti-tank rifle and Lewis guns.[10][41]

    Proposed extension to Sandling[edit]

    Objectors to the railway's first Light Railway Order advocated an extension from HythetoSandling (2 miles (3.2 km) away) to meet mainline services at Sandling Junction which they claimed would provide a more useful transport facility than the original proposals. Henry Greenly undertook a preliminary survey which demonstrated the scheme was impracticable.[42]

    Supposition that the 4-8-2 locomotives Hercules and Samson were ordered for the project, which involved steep inclines, is unfounded as the engines were intended for freight traffic, in particular a contract with Kent County Council to transport up to 30,000 tons of ballast a year from their pits at Palmarsh. In the end this contract failed to materialize.[43]

    In the 1980s, the directors reconsidered proposals to extend the line to Sandling and detailed surveys were undertaken. Again, consideration was given to motive power with new locomotives discussed. Although still called the "Sandling Extension", the 1980s plan was for a single-track line from Pennypot, 300 yards (270 m) short of Hythe, to provide a more gentle route to an area known as The Roughs, where a more powerful locomotive would take over for the heavy climb to Sandling station. It would therefore have been a branch line rather than an actual extension to the existing mainline. Again, the project was abandoned mainly because of the same obstacles as before.[44]

    Tenders[edit]

    The tender from Hurricane behind Samson at Dungeness
    The mock corridor tender behind Hurricane

    The following tenders are in use:

    Greenly tenders[edit]

    Of the seven Greenly tenders supplied new with locos 1–8, two are still in service albeit with new bodies to the original design. Originally built with vacuum brakes and a handbrake, both brake systems have been removed, leaving them as through-piped only. They were coupled to Hercules and Samson but withdrawn from mainline service due to concerns over safety, and their coal and water capacity.

    Ashford tenders[edit]

    The Southern Railway's Ashford works built four tenders in 1946–47. Ashford No 1 ran coupled to Hercules, but was built too high because John Iron, the Southern's draughtsman sent to New Romney to "measure a loco", took his measurements from a Canadian-type Pacific and not a British outline one. The design of subsequent tenders was altered hurriedly after this and the second one, Ashford No 2, was coupled to Typhoon. The design was further refined and two more were constructed. Ashford No 3 was coupled to Green Goddess and Ashford No 4 to Southern Maid. Ashford No 1 last ran in 1974 when Hercules was withdrawn for overhaul. Ashford Nos 2 and 3 are still in service with new bodies. Ashford No 4 was withdrawn when Southern Maid was overhauled in 1983.

    Until 1959, when its tender was cut down in size, Hercules ran with the cab roof raised on blocks of wood to match the height of the tender.

    Tender shortage[edit]

    Hercules was out of service after the Burmarsh Road level crossing incident in 2003, and Samson was withdrawn from service for an intermediate overhaul shortly afterwards. Once both locomotives were back in service, the railway was faced with a tender shortage. Samson was kept from mainline service while Hercules was coupled to the tender from Green Goddess while it was stored prior to overhaul. During the 2007 season, Samson saw service using the tender from Hurricane while it was being overhauled (a situation that had also happened in 1949 when Samson was used for ballast train duties).

    Safety[edit]

    The level crossing at Botolph's Bridge was the first to be converted to an ABCL.
    Hull Road level crossing just south of Romney Sands before barriers were fitted

    Incidents[edit]

    There have been a number of serious accidents over the railway's 90-year operation with an extensive mainline timetable. The majority of these have been related to level crossings, and in every documented case the road user has either admitted liability, or been found to have been in the wrong by the subsequent investigation. Despite the presence of large numbers of visitors and tourists, almost all recorded level crossing incidents have involved local car drivers. The more serious incidents, including those at level crossings, have been:

    Level crossings[edit]

    Following the two fatal accidents in 2003 and 2005, the railway began a programme of level crossing refurbishment. There are a number of occupation crossings with local control, where the railway meets farm tracks, but of the eighteen junctions of the railway with public highways, five are road bridges and the other thirteen are level crossings. During the late 1970s to early 1980s, all thirteen had been converted to automatic open crossings (AOCLs)[75] by installation of flashing warning lights. Between 2006 and 2016, twelve of them were upgraded to Automatic Barrier Crossing Locally Monitored (ABCL) status. This involved the decommissioning of the life expired AOCL control equipment, the installation of lifting half-barriers and totally new control and train detection systems, at a cost of around £90,000 per crossing.[71] On 22 March 2017 the crossing at Romney Sands was commissioned as an ABCL, this means that all the 13 crossings on the line have barriers and it brought the level crossing upgrade program to a close. During the single line crossing upgrades the Road Signal heads (Wig Wags) have either been replaced with new ones (Battery Road and Dungeness Road) or had their existing heads refurbished.[citation needed]

    Ownership and operation[edit]

    Ownership[edit]

    RH&DR Engine No 2 Northern ChiefatNew Romney
    No 5 Hercules at New Romney

    The railway is owned by Romney, Hythe & Dymchurch Railway PLC, which was originally incorporated as a private limited company on 15 November 1971 under the name RH&D Light Railway Holding Company Limited, adopting its present title on re-registration as a "new" public limited company under Section 8(3) of the Companies Act 1980 on 10 May 1982.[76] Its shareholders (of whom there are now over a thousand) travel free of charge on trains, but receive no financial dividend on their shareholdings, instead re-investing all operating profit back into the company. By 14 June 2015 there were 25 "Gold Medallion" shareholders owning 5,000 or more shares each and 119 "Silver Medallion" shareholders owning between 500 and 4,999 shares each. The remaining shareholders owned between 100 and 499 shares each. The PLC's issued and fully paid share capital at that date was £508,858 in £1 Ordinary Shares.[77]

    Shares in the PLC remain available to the public at a cost of £4 each. The minimum holding is 100 shares, but above this number potential shareholders may purchase any amount. The two largest shareholders in the PLC are the Romney, Hythe & Dymchurch Railway Association with 78,604 shares (15.45%) and the estate of the late Sir William McAlpine (leader of the group which saved the railway from closure in 1972) which holds 38,837 (7.63%).[77] The PLC controls the entire share capital of the older statutory Romney, Hythe & Dymchurch Light Railway Company, incorporated by The Romney, Hythe & Dymchurch Light Railway Order 1926. It acquired a controlling interest in the Statutory Company on 14 February 1972 for £106,947.64 when it purchased 50,447 of the 51,000 Statutory Company shares then in issue.[2] Since February 1972 it has bought out all of the minority shareholders in the Statutory Company which is now a wholly owned subsidiary.

    The Romney, Hythe & Dymchurch Light Railway (Amendment) Order 1974[78] altered the capital structure of the Statutory Company, allowing its issued share capital and borrowings to amount in aggregate to £400,000 (instead of the previously completely inadequate £68,000). On 1 October 1975 the Statutory Company created a further 24,000 new shares, bringing its issued capital up to £75,000 in £1 shares. The PLC subscribed for 23,950 of these new shares and the remaining 50 were acquired by a director of the Statutory Company in order to bring their holding up to the minimum for directors of 250 shares specified in the 1926 Light Railway Order.[79] Directors' shareholdings in the Statutory Company are subject to rights of pre-emption by the PLC and are therefore treated for most purposes as being owned by that company.

    It is usual[according to whom?] for the two companies to share the same board of directors; with the anomaly that whilst the Romney, Hythe & Dymchurch Railway Association has been granted a seat on the Statutory Company's board it has no direct representation on the PLC's board.

    Directors[edit]

    The Romney, Hythe & Dymchurch Light Railway Order 1926[80] restricted the maximum number of directors of the Statutory Company to five and named Captain John Edwards Presgrave Howey, Gladys May Howey, Captain John Alexander Holder, Major William Bertram Bell and Henry Greenly as the first directors. Greenly never owned more than 50 shares in the company so was ineligible to sit on the board and Holder did not achieve the qualifying holding of 250 shares until 30 December 1929.[2] Gladys Howey was also ineligible until 1931 when her shareholding reached 250 and she was able to join the board.

    Section 5 of The Romney, Hythe & Dymchurch Light Railway (Amendment) Order 1974[78] increased the maximum number of directors from five to ten and also set the minimum number of directors at three.

    Operation[edit]

    The day-to-day operation of the railway is in the hands of a full-time permanent staff of around 35 assisted by 5 part-time permanent staff.[81] These include a general manager, departmental managers (engineering, commercial and operations) and a large number of engineering staff (from locomotive fitters to permanent way gangers) and catering staff (the New Romney and Dungeness cafes and the restaurant adjoining Hythe station are open all year round; some of the railway's other commercial outlets are more seasonal). In addition to this core staff, seasonal employees are taken on through the summer season, particularly to increase the staffing of the shops and catering outlets and to provide the required levels of staffing at stations. At the height of the operating season there are over 60 staff on the payroll.[2]

    See also[edit]

    Notes[edit]

    1. ^ "History and Heritage - RH&DR - Romney, Hythe and Dymchurch Railway". www.rhdr.org.uk. Retrieved 28 September 2020.
  • ^ a b c d e f g h i j k l Snell (1993)
  • ^ "Marsh Light Railway Proposal. Enquiry at New Romney Yesterday". Folkestone, Hythe, Sandgate & Cheriton Herald. England. 16 January 1926. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ "Order Signed and Sealed Yesterday". Folkestone, Hythe, Sandgate & Cheriton Herald. England. 29 May 1926. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ "Duke of York as Engine Driver". Folkestone, Hythe, Sandgate & Cheriton Herald. England. 7 August 1926. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ "Miniature Railway at Romney Marsh. Opening by Lord Beauchamp". Dover Express. England. 22 July 1927. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ Steel & Steel (1973)
  • ^ "The smallest railway in the world". Folkestone, Hythe, Sandgate & Cheriton Herald. England. 11 August 1928. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ a b c Davies (1988)
  • ^ a b Popular Science. Bonnier Corporation. 1 May 1944. p. 87.
  • ^ "The Lighter Side". Nottingham Evening Post. England. 22 March 1947. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ "Railway goes by rail". Dundee Evening Telegraph. Scotland. 9 June 1947. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ "New Jet Express will do 90 m.p.h". Dundee Courier. Scotland. 14 March 1950. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ "Boat trains, but no more school trains...". Narrow Gauge World. No. 106. Atlantic Publishers Ltd. September 2015.
  • ^ Denham, Chris (30 October 2008), "Railway on track with more stations", Kentish Express, archived from the original on 26 May 2012, retrieved 16 April 2009
  • ^ Company's annual report and accounts 2014, p6
  • ^ Hollingsworth, Brian (1982). Railways of the World. London: W H Smith. pp. 54, p79. ISBN 0-86124-023-5.
  • ^ "Inspector Lynley in The AnswerBank: Media & TV". www.theanswerbank.co.uk.
  • ^ "Highway. A Journey from Dungeness to Rye". IMDb. IMDb.com Inc. Retrieved 14 August 2017.
  • ^ Calder, Jonathan (8 November 2015). "The Great Train Robbery on the Romney, Hythe and Dymchurch". Liberal England. Retrieved 14 August 2017. - includes a 6-minute 14 second video of the broadcast
  • ^ The Marshlander, issue 121 (Winter 1997)
  • ^ "1127688 - ROMNEY HYTHE AND DYMCHURCH RAILWAY ASSOCIATION". Charity Commission. Charity Commission for England and Wales. Retrieved 14 August 2017.
  • ^ Romney, Hythe & Dymchurch Railway Association, Annual Report and Accounts 2015 p 3
  • ^ Folkestone, Hythe, Sandgate & Cheriton Herald, 14 January 1928
  • ^ a b c Morris, 1946
  • ^ Details from Kentish Express newspaper.
  • ^ a b c Snell, 1993
  • ^ Ordnance Survey 1:25,000 Explorer sheet 125 and The Marshlander, issue 90 (Spring 1990) p10
  • ^ The Marshlander, issue 90 (Spring 1990) p10
  • ^ The Marshlander, issue 90 (Spring 1990) p15
  • ^ Ordnance Survey 1:25,000 Explorer sheet 138
  • ^ Morris, 1946 p29
  • ^ Davies, 1975 p157
  • ^ Ransome-Wallis, 1962 p35
  • ^ Title deeds and leases held by the Romney, Hythe & Dymchurch Light Railway Company
  • ^ Davies, 1975
  • ^ Crowhurst and Scarth (2004)
  • ^ The Marshlander magazine, edition 165, page 31 (with illustrations).
  • ^ The Marshlander magazine, edition 164, page 30.
  • ^ "A visit to Britain's Smallest Public Railway". Illustrated London News. England. 6 April 1957. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ p.100 Balfour, G. The Armoured Train: Its Development and Usage Batsford, 1981
  • ^ Letters written by Henry Greenly held in the railway company's archives
  • ^ Material in the railway company's archives
  • ^ http://s9.zetaboards.com/MRW_Forums/topic/7330680/1/ including map of proposed extension
  • ^ The Marshlander, issue 92, Autumn 1990, P 16
  • ^ Reference to the accident at the Railways Archive.
  • ^ "Accident at Bonnington Road Crossing on 2nd September 1935". Railways Archive. Retrieved 14 August 2017.
  • ^ "Collision on World's Smallest Railway". Lincolnshire Echo. England. 17 May 1946. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ See "Romney Remembered - the first 75 years of the RH&D Railway", published by RHDRAssoc 2001, accident report on page 12.
  • ^ Accident reported on this Southern Maid webpage.
  • ^ Recorded on the railway's official website. (Retrieved 19 October 2014.)
  • ^ "Miniature Rail Crash". Yorkshire Evening Post. England. 22 April 1947. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ "One Man's Railway", by J.B.Snell, second edition, published by David St John Thomas, 1993, ISBN 0 946537 80 1, pages 77-78.
  • ^ File MT 114/75, National Archives and Snell (1993)
  • ^ "Rooftop crawl save screaming children on runaway train". Northern Whig. England. 12 August 1952. Retrieved 14 August 2017 – via British Newspaper Archive.
  • ^ File ZSPC 11/281/11, National Archives and Daily Mirror 12 August 1952
  • ^ Extensive detailed report by drivers George Barlow and Bob Hobbs, published in "The Marshlander", issue 56, Autumn 1981; and re-published in Maidstone Model Engineering Society Magazine, Christmas 2003 (facsimile available on-line).
  • ^ "The bank holiday railway trip that ended in terror". The Folkestone Herald. 6 June 2013. Archived from the original on 10 June 2013. Retrieved 7 June 2013.
  • ^ Cooke, B.W.C., ed. (August 1963). "Holiday Crash". The Railway Magazine. Vol. 109, no. 748. Westminster: Tothill Press. p. 564.
  • ^ Report with photographs, The Daily Mirror, 10 August 1967.
  • ^ "Accident at Botolphs bridge". The Marshlander (5). Autumn 1968.
  • ^ See detailed report "The Marshlander", published by RH&DR Association, edition 11, May–July 1970.
  • ^ a b Folkestone Herald newspaper, edition of 30 August 1975, article entitled "Girl,14, trapped as train and car crash"
  • ^ Referenced on the locomotive page "Samson" of the railway's official website.(Retrieved October 2014).
  • ^ ITN Archives have video footage and photo stills from this incident.
  • ^ "Tourists escape as mini-train crashes". The Daily Mirror. 5 August 1974.
  • ^ See detailed report "The Marshlander", published by RH&DR Association, edition 103, summer 1993, page 2 (and photograph, page 3).
  • ^ Information based on news reports in the Daily Express and The Daily Mirror, 4 August 2003.
  • ^ "Motorist cleared of railway death". BBC News. 29 September 2004. Retrieved 14 August 2017.
  • ^ Sapsted (2004)
  • ^ a b "Woman dies in mini-railway crash". BBC News. 11 July 2005. Retrieved 14 August 2017.
  • ^ "Train death motorist is sentenced". BBC News. 29 November 2006. Retrieved 14 August 2017.
  • ^ Browning, Bess (10 September 2016). "Romney, Hythe and Dymchurch Railway train derails". Kent Messenger. KM Group Ltd. Retrieved 10 September 2016. and The Marshlander, issue 196 (Autumn 2016) p12
  • ^ "Serious operating irregularity at Romney Sands, 28 August 2019". Rail Accident Investigation Branch. Retrieved 14 October 2019.
  • ^ "Types of level crossings". Office of Rail and Road. Retrieved 9 October 2015.
  • ^ Companies House file for company number 01031179 Romney, Hythe & Dymchurch Railway Public Limited Company
  • ^ a b Company's 2016 Annual Return to Companies House
  • ^ a b "The Romney Hythe and Dymchurch Light Railway (Amendment) Order 1974", legislation.gov.uk, The National Archives, SI 1974/1024
  • ^ Romney, Hythe & Dymchurch Light Railway Company Register of Shareholders and Romney, Hythe & Dymchurch Light Railway Order 1926
  • ^ S.R. & O. 1926/741
  • ^ Company's annual report and accounts 2014
  • Sources[edit]

    External links[edit]

    51°2′N 1°0′E / 51.033°N 1.000°E / 51.033; 1.000


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Romney,_Hythe_and_Dymchurch_Railway&oldid=1218896986"

    Categories: 
    Heritage railways in Kent
    15 in gauge railways in England
    Transport in Folkestone and Hythe
    Railway lines opened in 1927
    Light railways
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Use British English from August 2015
    Use dmy dates from February 2020
    All articles with unsourced statements
    Articles with unsourced statements from November 2015
    All articles with failed verification
    Articles with failed verification from September 2016
    Articles needing additional references from December 2019
    All articles needing additional references
    All pages needing factual verification
    Wikipedia articles needing factual verification from September 2023
    Articles with unsourced statements from August 2023
    Articles with unsourced statements from August 2020
    All articles with specifically marked weasel-worded phrases
    Articles with specifically marked weasel-worded phrases from November 2019
    Commons category link from Wikidata
    Official website different in Wikidata and Wikipedia
    Coordinates on Wikidata
    Articles with VIAF identifiers
    Articles with LCCN identifiers
     



    This page was last edited on 14 April 2024, at 14:30 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki