Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 See also  





2 References  





3 External links  














STEGAL






Deutsch
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


STEGAL
Location
CountryGermany
StateSaxony
Thuringia
General directioneast–west
FromOlbernhau (connected to Transgas pipeline)
Passes throughRückersdorf (connected to JAGAL pipeline)
Erfurt
ToReckrod (connected to MIDAL pipeline)
General information
Typenatural gas
OperatorGascade Gastransport GmbH
Construction started1991
Commissioned1992
Technical information
Length314 km (195 mi)
Diameter800 mm (31 in)
No. of compressor stations3
Compressor stationsOlbernhau
Rückersdorf
Eischleben

STEGAL (Sachsen-Thüringen-Erdgas-Anbindungsleitung) is a natural gas pipelineinSaxony and Thuringia, Germany. It connects the Czech Transgas pipeline at Olbernhau and the JAGAL pipeline (exporting gas from the Yamal–Europe pipeline) at Rückersdorf with the MIDAL pipeline at Reckrod. The pipeline is used for the Russian gas import. The length of STEGAL is 314 kilometres (195 mi) and the diameter of pipe is 800 millimetres (31 in). It is operated by Wingas GmbH & Co. KG.[1][2]

Construction of the STEGAL pipeline started in 1991 and the pipeline was completed in 1992. In 1999, the JAGAL pipeline was connected with STEGAL at Rückersdorf. In March 2006, the 97-kilometre (60 mi) long STEGAL Loop, parallel to the main pipeline, was commissioned.

Due to increasing demand, the STEGAL ring line was built and put into operation in 2005/2006. This is 97 km long and runs parallel to the STEGAL sections, increasing the capacity of the line by more than 400,000 m3 / h.

See also[edit]

References[edit]

  1. ^ Energy Policies of IEA Countries - Germany (PDF). International Energy Agency. 2007. pp. 105, 108. ISBN 978-92-64-02223-2.
  • ^ Victor, David G.; Jaffe, Amy; Hayes, Mark H. (2006). Natural gas and geopolitics: from 1970 to 2040. Cambridge University Press. p. 156. ISBN 978-0-521-86503-6.
  • External links[edit]

  • t
  • e
  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=STEGAL&oldid=1219296660"

    Categories: 
    Energy infrastructure completed in 1992
    Natural gas pipelines in Germany
    Pipeline stubs
    German building and structure stubs
    Hidden categories: 
    Germany articles missing geocoordinate data
    All articles needing coordinates
    Articles missing coordinates without coordinates on Wikidata
    All stub articles
     



    This page was last edited on 16 April 2024, at 22:06 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki