Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Crew  



1.1  Crew notes  







2 Mission payloads  





3 Mission background  





4 Mission timeline  



4.1  Launch preparations  





4.2  Wednesday August 8 (Flight day 1, Launch)  





4.3  Thursday August 9 (Flight day 2)  





4.4  Friday August 10 (Flight day 3)  





4.5  Saturday August 11 (Flight day 4)  





4.6  Sunday August 12 (Flight day 5)  





4.7  Monday August 13 (Flight day 6)  





4.8  Tuesday August 14 (Flight day 7)  





4.9  Wednesday August 15 (Flight day 8)  





4.10  Thursday August 16 (Flight day 9)  





4.11  Friday August 17 (Flight day 10)  





4.12  Saturday August 18 (Flight day 11)  





4.13  Sunday August 19 (Flight day 12)  





4.14  Monday August 20 (Flight day 13)  





4.15  Tuesday August 21 (Flight day 14, Landing)  







5 Extra-vehicular activity  





6 Wake-up calls  





7 Contingency mission  





8 Media  





9 See also  





10 References  





11 External links  














STS-118






العربية
 / Bân-lâm-gú
Български
Català
Čeština
Dansk
Deutsch
Eesti
Español
فارسی
Français
Galego
Italiano
עברית
Latviešu
Magyar
Nederlands

Norsk bokmål
Norsk nynorsk
Polski
Português
Русский
Slovenčina
Suomi
Svenska
Українська
Yorùbá

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


STS-118

Endeavour rendezvous with the ISS

Names

Space Transportation System-118

Mission type

ISS assembly

Operator

NASA

COSPAR ID

2007-035A Edit this at Wikidata

SATCAT no.

32008

Mission duration

12 days, 17 hours, 55 minutes, 34 seconds

Distance travelled

8,489,253 kilometres (5,274,977 mi)[1]

Orbits completed

201

Spacecraft properties

Spacecraft

Space Shuttle Endeavour

Launch mass

121,823 kilograms (268,574 lb)

Landing mass

100,878 kilograms (222,398 lb)[2]

Crew

Crew size

7

Members

  • Charles O. Hobaugh
  • Tracy Caldwell
  • Richard Mastracchio
  • Dafydd Williams
  • Barbara Morgan
  • Alvin Drew
  • Start of mission

    Launch date

    August 8, 2007, 22:36:42 (2007-08-08UTC22:36:42Z) UTC

    Launch site

    Kennedy LC-39A

    End of mission

    Landing date

    August 21, 2007, 16:33:20 (2007-08-21UTC16:33:21Z) UTC

    Landing site

    Kennedy SLF Runway 15

    Orbital parameters

    Reference system

    Geocentric

    Regime

    Low Earth

    Perigee altitude

    226 kilometers (140 mi)[3]

    Apogee altitude

    226 kilometers (140 mi)[3]

    Inclination

    51.6 degrees

    Period

    91.6 minutes

    Docking with ISS

    Docking port

    PMA-2
    (Destiny forward)

    Docking date

    August 10, 2007, 18:02 UTC

    Undocking date

    August 19, 2007, 11:56 UTC

    Time docked

    8 days, 17 hours, 54 minutes


    (left to right) Mastracchio, Morgan, Hobaugh, Kelly, Caldwell, Williams and Drew.
    Space Shuttle program
    ← STS-117
    STS-120 →
     

    STS-118 was a Space Shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 lifted off on August 8, 2007, from launch pad 39AatKennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on August 21, 2007.

    This was the first flight of Endeavour since STS-113 in November 2002, which was also the last successful shuttle flight before STS-107 which culminated in the loss of Columbia when it disintegrated during reentry. STS-118 pilot Charles Hobaugh had been the entry team CAPCOM for STS-107. Columbia had originally been selected for this flight, for what would have been its 29th mission, and its first and likely only visit to the ISS, mainly due to its heavier weight.[4]

    The mission is also referred to as ISS-13A.1 by the ISS program. The mission added two more components to the ISS and brought supplies for its crew.

    During and after the mission, the media focused heavily on a small puncture in the heat shield, created by a piece of insulation foam that came off the external tank during liftoff, though the foam impact that ultimately destroyed Columbia caused more damage and was in a critical area. KSC Launch Director Michael D. Leinbach mentioned in the post-flight news conference that upon initial inspection on the ground, "Endeavour appears to be the 'cleanest' post-flight orbiter since Return to Flight".[5] On August 31, 2007, NASA reported that the damaged tiles had been removed in the Orbiter Processing Facility, and engineers had found no evidence of heat-related damage to the orbiter itself.[6]

    Crew[edit]

    Position

    Astronaut

    Commander

    United States Scott Kelly
    Second spaceflight

    Pilot

    United States Charles O. Hobaugh
    Second spaceflight

    Mission Specialist 1

    United States Tracy Caldwell
    First spaceflight

    Mission Specialist 2

    United States Richard Mastracchio
    Second spaceflight

    Mission Specialist 3

    Canada Dafydd Williams, CSA
    Second and last spaceflight

    Mission Specialist 4

    United States Barbara Morgan
    Only spaceflight

    Mission Specialist 5

    United States Alvin Drew
    First spaceflight

    Crew notes[edit]

    Astronaut Clayton Anderson was originally slated to be launched to the ISS on this mission, but was moved to STS-117. His replacement was Alvin Drew.[7]

    NASA press releases and media briefing documents stated that STS-118 was the first flight of a Mission Specialist Educator due to the presence of Barbara Morgan. The Educator Astronaut Project is the successor to NASA's Teacher in Space Project, which ended with the Space Shuttle Challenger disaster in 1986.[8] The official STS-118 mission patch included a flame of knowledge that represented the importance of education, and honored teachers and students everywhere. Morgan was the backup to Christa McAuliffe, the teacher who was killed aboard Challenger in 1986. The tip of the flames touched Morgan's name on the patch.[9] However, NASA Administrator Michael D. Griffin clarified at a post-mission press conference that Morgan was not considered a mission specialist educator, but rather a standard mission specialist, who had once been a teacher.[10]

    Prior to the Columbia disaster, the crew manifest for STS-118 was:

    Position

    Astronaut

    Commander

    Scott J. Kelly
    Second spaceflight

    Pilot

    Charles O. Hobaugh
    Second spaceflight

    Mission Specialist 1

    Scott E. Parazynski
    Fifth spaceflight

    Mission Specialist 2

    Lisa Nowak
    First spaceflight

    Mission Specialist 3

    Dafydd Williams, CSA
    Second spaceflight

    Mission Specialist 4

    Barbara Morgan
    First spaceflight

    Parazynski was assigned to STS-120 and Nowak was assigned to STS-121.

    Mission payloads[edit]

    ESP-3 launch configuration
    From top to bottom: Orbiter docking system, Spacehab, S5 truss, ESP-3. The CMG is the globe bottom left.

    The STS-118 mission delivered and assembled the starboard S5 truss segment of the International Space Station, as well as External Stowage Platform 3, (ESP-3) and a replacement Control Moment Gyroscope (CMG). The mission was also the final flight to include the Spacehab Logistics Single Module.

    The Spacehab Logistics Single Module, a pressurized aluminum habitat that is carried inside the payload bay, has a capacity of 6,000 pounds (2,700 kg), and carried a variety of cargo and research projects, including supply materials for the ISS. It returned cargo, including the MISSE PEC 3 & 4, a Department of Defense payload that had been installed on the ISS. Launched in July 2006, the MISSE PEC-3 and 4 contained over 850 materials specimens that will be studied to determine the effects of long-term exposure to the environment of space.

    Location

    Cargo

    Mass

    Bay 1–2

    Orbiter Docking System
    EMU 3010 / EMU 3017

    1,800 kilograms (4,000 lb)?

    Bay 3

    Tunnel Adapter

    112 kilograms (247 lb)

    Bay 5–7

    Spacehab-SM

    5,480 kilograms (12,080 lb)?

    Bay 8P

    Shuttle Power
    Distribution Unit (SPDU)

    ?0 kilograms (0 lb)

    Bay 8–10

    Truss Segment S5

    1,584 kilograms (3,492 lb)

    Bay 11–12

    ESP-3

    3,400 kilograms (7,500 lb)

    Sill

    OBSS

    450 kilograms (990 lb)?

    Sill

    RMS 201

    390 kilograms (860 lb)

    Total:

    14,036 kilograms (30,944 lb)

    Mission background[edit]

    New components added to the International Space Station after flight STS-118/13A.1. (NASA)

    The mission was originally scheduled to be flown by Columbia; STS-118 would have marked that orbiter's 29th flight and its first visit to the International Space Station. However, the Space Shuttle Columbia disaster altered the planned flight schedules, and the mission was rescheduled for Endeavour. STS-118 served as Endeavour's return to flight after a planned orbiter re-fit and maintenance period that resulted in over 200 modifications to the orbiter.[11]

    One of the most important modifications that debuted during STS-118 is an upgraded power-distribution module, the Station-Shuttle Power Transfer System (SSPTS). SSPTS allows Endeavour to tap into the ISS power supply, converting up to eight kilowatts of electrical power from 120-volts direct-current (120VDC) ISS main voltage to the 28VDC system used by the orbiter. SSPTS was outfitted to the ISS Pressurized Mating Adapter-2 (PMA2) during STS-116. These upgrades will allow orbiters to remain docked at the station for an additional three to four mission days[12][13][14] by saving cryogenic liquid hydrogen and oxygen needed to run the fuel cells which generate electricity aboard the orbiter; oxygen and hydrogen tank capacity is a major factor limiting the duration of orbiter free flights. Other systems debuting on this flight were a three-string GPS system, which replaces the three Tactical Air Navigation-units, used to guide the shuttle and calculate its position during reentry and landing and the new Advanced Health Management System which keeps an eye on the three main engines (SSMEs) during liftoff and will shut them down before any catastrophic damage might develop. (All SSMEs had their own computers to regulate, monitor, and shut them down in case of trouble; the new system extends and improves the monitoring capability for increased safety.) Endeavour also received several systems that the other orbiters had already been equipped with, such as a glass cockpit, improved wing leading-edge sensors and the OBSS.[11]

    STS-118 included mission specialist Barbara Morgan, the first mission specialist educator. Morgan trained as the backup to Christa McAuliffe, NASA's Teacher in Space candidate from 1985 to 1986. McAuliffe was killed in the Space Shuttle Challenger disaster on January 28, 1986. While McAuliffe and Morgan were classified as spaceflight participants and not as mission specialists in 1986, after the Teacher in Space Project was canceled, Morgan assumed the duties of Teacher in Space Designee and continued to work with NASA's Education Division until her selection as NASA's first mission specialist educator in 1998. Morgan completed two years of training and evaluation and began official duties in 2000.[15] An Educator Astronaut is a fully trained astronaut who performs all the same duties that a regular astronaut does.[16] Morgan became the first mission specialist educator in space on STS-118, and will share what she learned from the experience with students during and after her flight.

    Whether you're teaching school, or whether you're training as an astronaut, you put all you can into it, and get the most out of it.

    — Barbara Morgan[17]

    The mission marked:

    Mission timeline[edit]

    Launch preparations[edit]

    Space Shuttle Endeavour arrives at launch pad 39A.

    Endeavour (OV-105) was moved from the Orbiter Processing Facility, bay OPF-2 to the Vehicle Assembly Building on July 2, 2007.[18] On July 10, 2007, Endeavour moved from the Vehicle Assembly Building to Launch Pad 39A. Moving at less than one mile per hour (1.6 kilometres (0.99 mi)/h) atop the crawler-transporter, the move began at 20:10 EDT, and was "hard down" (secured in place at the pad) at 03:02 EDT, July 11, 2007.

    The crew completed the terminal countdown demonstration test on July 19, 2007, and the Flight Readiness Review meetings were held on July 25–26, 2007, after which NASA managers declared STS-118 a "GO" for launch.[19] The launch was delayed one day to repair a valve in the shuttle's crew cabin pressurization system.[20]

    Commander Kelly and the crew arrived at Kennedy Space Center on August 3, 2007, for final launch preparations. The countdown clock began at 20:00 EDT August 5, 2007, for the launch at 18:36 EDT on August 8, 2007.

    Wednesday August 8 (Flight day 1, Launch)[edit]

    Launch of STS-118.

    Fueling of the external tank began at 08:11 EDT (12:11 UTC) and finished around 11:00 EDT. The Ice Team began their inspection of the orbiter to ensure no ice was on the orbiter or the fuel tank, something unlikely due to the unusually warm conditions as launch time approached. Their inspection concluded about 40 minutes quicker than the usual two-hour duration. The crew departed for the Operations & Checkout (O&C) building, for the launch pad at 14:46 EDT (18:46 UTC), and arrived at the pad at 15:02 EDT (19:02 UTC). Launch occurred at 18:36:42 EDT (22:36:42 UTC).

    Countdown and launch notes:

    The primary TAL site was Zaragoza Airport in Spain.

    Following the procedures for post-ascent, the crew opened the payload bay doors, activated the Spacehab, powered up the Remote Manipulator System, and performed a variety of other payload activation procedures, before entering their scheduled sleep shift at 04:36 UTC (12:36 am EDT) August 9, 2007.

    Thursday August 9 (Flight day 2)[edit]

    The shuttle crew spent most of the day inspecting the outer hull and the heat shield. During the mission status briefing, Deputy Shuttle Program Manager (and Mission Management Team chairman) John Shannon reported that during launch, approximately nine pieces of foam were observed breaking off the external fuel tanks. Three of these struck the shuttle. All three strikes are considered to be minor in nature.[22]

    Friday August 10 (Flight day 3)[edit]

    Preliminary image of damage to the thermal protective tiles.

    Endeavour successfully docked with the International Space Station at 18:02 UTC (14:02 EDT). Approximately an hour before docking, Endeavour performed the one-degree-per-second backflip, called the Rendezvous Pitch Maneuver (RPM), so the ISS crew members could take digital pictures of the heat shield of the orbiter. The images were then analyzed by NASA's Image Analysis Team, as well as the Mission Management Team to inspect the integrity of the orbiter's heat shield. Following a series of leak checks, the hatches were opened at 20:04 UTC (16:04 EDT), and the Expedition 15 crew welcomed the STS-118 crew aboard the station.

    After preliminary review of the photos taken by the Expedition 15 crew during the RPM, an area of interest was discovered on the underside of the Shuttle; an area behind the right landing gear door covered with black silica tiles.[23] The tile directly aft of the door had a 3.5 inches (8.9 cm) by 2 inches (5.1 cm) gouge in it. While the tile was penetrated, the underlying felt backing was not. NASA noted in the press conference that launch-time video confirmed a foam strike. This area is less critical than the leading-edge reinforced carbon-carbon tiles that were damaged in the Space Shuttle Columbia disaster, but did cause concern for the Mission Management Team. A focused inspection was scheduled for August 12, 2007, to determine whether a patch attempt would be undertaken by the astronauts during an EVA.[24] NASA once reported that pieces of foam are bound to, and have fallen off of the external tank during the eight and a-half-minute ride to orbit. An unprecedented 300 pieces of foam once struck the underside of an orbiter during launch.

    The crew activated the Station-to-Shuttle Power Transfer System (SSPTS) after docking.[25] The SSPTS transfers electrical power from the station to the shuttle, allowing the shuttle to conserve its own power generating resources. An extension of the mission from 11 to 14 days was dependent on proper operation of the SSPTS.

    Saturday August 11 (Flight day 4)[edit]

    Astronaut Rick Mastracchio works on the outside of the International Space Station during EVA 1 on August 11.

    At 21:45 (UTC), Rick Mastracchio and Dave Williams started the first EVA of the mission, installing the S5 truss to the station, increasing the total mass of the ISS to 232,693 kilograms (513,000 lb). The EVA duration was 6 hours and 17 minutes, and all objectives were successfully completed.

    During the Mission Status press conference, Lead ISS Flight Director Joel Montalbano reported that the SSPTS was working well, and the recommendation to the Mission Management Team will be to extend the mission to the planned 14-day mission.

    Mission Management Team chair John Shannon reported after additional analysis, it appeared that a piece of foam came off the external tank in the area of the tank's feed line, and bounced off a nearby strut, resulting in a hit to the orbiter's underside. An almost identical section of foam was lost on STS-115, but did not strike the orbiter. John reported after further review of photos taken on flight day three, they do not feel the damage went all the way through the tile, but focused inspection is still planned for flight day five, and decisions would not be made until more information is obtained. Five specific areas will be inspected during focused inspection, and with the data gathered, thermal testing can be done to determine what actions, if any, need to be taken.

    Overall, John Shannon classified the foam loss as a "concern", but only with regards to the history that the specific area has with regards to foam loss in past missions. Shannon reported that analysis would be complete by flight day 7 at the latest.

    John Shannon also reported that the possible protruding gap filler noticed on flight day 3, was reviewed further, and was determined to be "shim stock", which will burn off in the upper atmosphere, and poses no issues for re-entry.

    Sunday August 12 (Flight day 5)[edit]

    High resolution image of thermal protective tiles taken during focused inspection on flight day five.

    The crew carried out the focused inspection without any problems, and at 20:56 (UTC), the crews of Endeavour and Expedition 15 were notified that the SSPTS was working as expected, and the mission was officially extended to the planned 14-day mission. Commander Scott Kelly replied, "That's great news, thanks".[26]

    In the daily mission status briefing, Lead Flight Director Matt Abbott announced the official extension of the mission, that the SSPTS was working as planned, and they were pleased with the data gathered during the focused inspection on Sunday. Mission Management Team Chairman John Shannon confirmed the decision of the Mission Management Team to extend the mission to 14 days, and to add a fourth EVA, was unanimous. He noted that the addition of SSPTS will be a valuable new tool, providing not only extended missions, but also the ability to provide the space station with additional supplies of oxygen, water, and other resources.

    Shannon reported on the focused inspection, confirming that good laser data and imagery was obtained, and they resolved several areas of interest, classifying them as of no concern. One area of interest was two adjacent thermal plates on the shuttle's underside that had a gouge that appeared to be deeper than would allow them to rule it out. NASA would use data from the focused inspection to model the area, and do thermal analysis of the area.[27] They will use the data to mimic the damage with sample tiles at Johnson Space Center, and using a variety of testing methods, possible courses of action would then be evaluated. No decision would be made until all data had been received and reviewed.

    Shannon did report that following STS-118, NASA will do a thorough review of the history of foam loss from the area of the external tank since STS-114, analysis and testing would be done, and any speculation as to a future course of action would not be made until all the information was available.

    Monday August 13 (Flight day 6)[edit]

    One of the retrieved MISSE experiments.

    Rick Mastracchio and Dave Williams completed the mission's second spacewalk, successfully achieving all of the scheduled activities. During the EVA, they removed a new CMG from Endeavour's payload bay, and moved it to the Z1 truss, where they removed the failed CMG. After installing the new CMG, they placed the failed CMG on an external stowage platform, where it will remain until it is returned to Earth with mission STS-122. After initial testing on the ground, NASA reported the new CMG was functioning normally.[28]

    During the EVA, Mastracchio reported an EVA suit alarm, indicating high levels of CO
    2
    , but after reviewing all indicators and sensors, NASA confirmed it was an instrumentation issue, and the suit itself was fine. At the mission status briefing, NASA reported the suit would be used on future spacewalks, and the issue was not of any concern.[29]

    During the Mission Management briefing, John Shannon discussed Endeavour's heat shield and re-entry issues. He reported that after initial modeling they believe the majority of heating will be on the backside of the gouge, and not into the filler bar side, which was the preferable situation. He reiterated that it was a complicated aerodynamic shape, and they wanted to be sure the flow would concentrate in the back "well" of the hole. The engineers and analysts would continue to do additional flow modeling, after which they would take the data into the arc jet testing facility for additional analysis. The first preliminary arc jet tests would be performed Monday night.

    Shannon reported a "team four" had been assembled, along with the operations and engineering teams, to assist in data analysis. The teams will look at options for repair if required, and make recommendations to the Mission Management Team after the analysis of tests and data. Shannon stated he had no doubt that if a repair was required, the crew could execute it without significant impact to the mission timeline. He reiterated that this was not a catastrophic damage situation, but simply a situation that they would prefer to fix if possible, similar to the OMS blanket issue during STS-117 in June 2007.[30]

    There are three different on-orbit repair techniques available to the crew. Both post-Columbia Return to Flight missions experimented with various repair materials and techniques, and the STS-118 crew has trained for those procedures.

    Tuesday August 14 (Flight day 7)[edit]

    Backdropped by Earth, Endeavour'sCanadarm moves the external stowage platform (ESP-3).

    The Endeavour crew awoke on Tuesday to the voices of Tracy Caldwell's family singing happy birthday to her. The two crews successfully removed the ESP-3 from Endeavour's payload bay, and installed it onto the P3 truss. They also continued with transfer activities, and several crew members took time out to have two Public Affairs events, one of them answering children's questions from the Discovery Center in Boise, Idaho.[31] During an interview with CBS, Commander Kelly stated that he was not concerned about the tile damage, and would be comfortable with any decision NASA made, "My understanding is this tile damage is not an issue of the safety of the crew... I'm not concerned with our safety."[32] The main reason for fixing it, he noted, would be to assist with processing once the orbiter was back at the Kennedy Space Center.

    During the Mission Management Team briefing, Kirk Shireman, Deputy International Space Station Program Manager, reported that the External Stowage Platform installation went well; the new CMG was working well, and handover of attitude control directly from the shuttle to the station was completed without problems. In addition, a new Russian computer was installed on the station, and testing of the system would be performed in late August. He also mentioned several of the experiments that were launched with STS-118, and reported all experiments were proceeding well. Shireman also noted that as of 15:17 UTC, the Zarya module of the station had orbited the Earth 50,000 times.

    John Shannon reported that the orbiter systems were in excellent shape, and had no issues. With regards to the remaining area of tile damage on the underside of the orbiter, Shannon reported that initial thermal analysis had been completed. Computational fluid dynamics testing at Ames Research Center had been done, and the preliminary results were "cautiously optimistic". Testing at the arc jet facility would continue Tuesday night. Shannon stated they would go through complete EVA scenario testing at the Neutral Buoyancy Lab, to help develop the EVA procedures if needed.

    Wednesday August 15 (Flight day 8)[edit]

    Mastracchio's damaged glove.

    Rick Mastracchio and Clayton Anderson began the third EVA of the mission at 14:37 UTC. During the EVA, they successfully relocated a CETA Cart, retrieved the P6 Transponder, relocated the S-band antenna from P6 to P1, and installed a new S-Band Baseband Signal Processor and Transponder on the P1 truss. During a routine glove inspection, Mastracchio noticed a possible tear on the thumb of his left glove.[33] To be safe, NASA managers decided to end the spacewalk at 20:05, and examination and photography of the glove was performed during suit removal. The spacewalk accomplished all but one of the tasks (MISSE retrieval).[34] On the station, the crewmembers continued with transfer activities.

    During the Mission Management Team briefing, Joel Montalbano reported that the issue with Mastracchio's suit was never a danger to the suit integrity, and the decision to cut the EVA short was one of precaution. Extended photography was performed, and additional analysis will be completed prior to the fourth EVA. Montalbano reported that the fourth EVA would be no earlier than August 18, 2007.[35]

    Lead spacewalk officer Paul Boehm agreed that the EVA went well, the major objectives were completed, and he reiterated that at no time was Mastracchio's suit in any danger of leaking.

    EVA Office Manager Steve Doering reported on the details regarding the issue with Mastracchio's glove. The EVA inspection procedure was implemented following STS-116, when a cut was found on Robert Curbeam's glove following an EVA. The EVA suit comprises five layers of material, and the second layer, called vectran, is a high strength material resistant to tearing. Mastracchio's tear was into the vectran layer. Prior to the next EVA, video analysis will be done of the path Mastracchio took during the spacewalk in an attempt to discover where the tear may have occurred. An analysis of Mastracchio's glove during the previous two EVAs will also be performed.

    John Shannon reported that no decision had been made regarding the tile damage on the underside of the orbiter, but the fourth EVA was postponed to at least August 18, 2007. The management team would continue to analyze the potential risks of repair to the underside of the orbiter, as well as any other areas of risk. Shannon reported the results of the arc jet testing showed some erosion into the backside of the adjacent tile upon re-entry, but the erosion did not go through the entire layer of the tile. Preliminary results were encouraging, but additional testing would be performed on Wednesday night. Shannon reported that the final decision would most likely be made on Thursday.[36] Shannon said "I am cautiously optimistic that repairs will not be needed".[37]

    Astronaut Clay Anderson, Expedition 15 flight engineer, uses a digital camera to expose a photo of his helmet visor during the mission's third EVA.

    Thursday August 16 (Flight day 9)[edit]

    The station and shuttle crews continued transfer activities on flight day 9, as well as EVA preparations, which included TPS repair procedure review, in case NASA decided a repair was necessary.[38][39]

    Mission Specialists Barbara Morgan and Alvin Drew participated in an education event in the morning with students at the Challenger Center for Space Science EducationinAlexandria, Virginia. The event was hosted by Dr. June Scobee Rodgers, wife of Challenger's commander, Dick Scobee, and Founding Chairman of the Challenger Center. Morgan and Drew also spoke to reporters from the Associated Press, Reuters and Idaho Public Television.[40]

    During the interview with Reuters, Drew stated "We've been talking to the engineers who have been analyzing this far more than we have in space, and they seem to feel that the biggest danger is more to just being able to re-use Endeavour once it gets back on the ground. They seem to be confident, and I trust their confidence that we can get home safely even with the divot that we have in the belly,"[41] Morgan added "We have a lot of faith in the program, and we'll do what the engineers decide is the best thing for us to do. We have all confidence we're going to be able to do the right thing."

    At 01:00 UTC, August 17, 2007, CAPCOM Shane Kimbrough notified commander Kelly that the Mission Management Team decided that no repair to the damaged tile on the underside of the orbiter would be required.[42][43]

    During the Mission Management Team briefing, John Shannon announced the team's unanimous decision that an EVA to repair the damaged tile was not required, and the tile damage on the underside of the orbiter was not a threat to crew safety. However, the spacewalk to repair the damage could pose a variety of risks, and those risks weighed heavily into the final decision. He noted the arc jet tests actually showed a higher degree of damage than the orbiter would sustain during re-entry, so the tests were helpful in showing the worst "possible" damage, and still did not damage the tile during testing enough to warrant repair.[44]

    Shannon did note that the JSC Engineering Independent Group advised NASA managers that repairing the damage on-orbit could assist with mission turn-around time once the orbiter was on the ground. Shannon noted that the risks associated with in-flight repair outweighed the possible delay in processing the orbiter following the mission. He stated that normal turn-around time would not be compromised, as most orbiters have at least 60 tiles replaced after each mission, so the situation would not be any different from past missions.[45]

    When pressed during the briefing by a reporter as to the chance of shuttle or crew loss, Shannon reported "I am 100 percent comfortable that the work that has been done, has accurately characterized the damage, and that we will have a very successful re-entry". He stated that over 200 people were involved in the decision, representing over 30 organizations, including NASA Ames Research Center, NASA's Langley Research Center, Jet Propulsion Laboratory, KSC, JSC, and that all the groups combined came to the same decision.

    Shannon reported that the glove issue encountered during EVA three had been discussed, and stated that analysis would be continued, in advance of EVA four on Saturday. The crew does have a spare set of gloves, if needed.

    Shannon reported on a micro-meteoroid debris strike discovered on the commander's window of the orbiter, which was 1 millimeter in depth. Shannon noted that it was consistent with previous damage sustained on past missions. Analysis would be conducted regarding this issue, using photographs sent down by the crew early Thursday morning.

    The final item discussed was Hurricane Dean, which was heading towards the Caribbean Sea, and projected to move into the Gulf of Mexico. Contingency procedures and plans were in place, but Shannon did not anticipate it would affect the mission's timeline at all.

    Friday August 17 (Flight day 10)[edit]

    The station and shuttle crews had a relatively quiet day on flight day 10, continuing transfer operations, and doing some troubleshooting on a communication system between the shuttle and station. The two crews took some time out to have a joint news conference with US and Canadian news agencies, and took the official combined crew portrait.[46] When asked by reporters on the ground whether the crew agreed with NASA's decision to return without repairing the damage to Endeavour's underside, Commander Kelly replied, "We agree absolutely 100 percent with the decision to not repair the damage."[47]

    During the mission status briefing, Lead Flight Director Matt Abbott discussed the ongoing preparations and plans with regards to Hurricane Dean, and reported NASA was watching the storm's track closely. If required, contingency plans are available. While the mission's timeline could be changed if required, no decision was made, and the mission was proceeding as planned.[48]

    Deputy ISS Program Manager Kirk Shireman reported the S-Band system relocated during the third EVA was working well, and the SSPTS provided enough oxygen to be able to completely fill all reserves on the station. Shireman commented that transfer operations were approximately 75% complete.

    EVA Office Manager Steve Doering reported on the decision to proceed with Saturday's EVA. The team analyzed the video downlinked from the third EVA, and the review showed no evidence of any specific event that would indicate a sharp edge, or excessive wear. A review of the manufacturing of the gloves was done, and no concerns were identified. The paths taken by astronauts during spacewalks were reviewed, identifying common paths between the third EVA, and Saturday's planned EVA, and the crew was notified of the common locations, to identify areas where additional glove inspections would be performed on Saturday. Overall, the final EVA would be less "hand-intensive" than the previous spacewalks, and the conclusion following the analysis was that Saturday's EVA would go ahead as planned.[49]

    Saturday August 18 (Flight day 11)[edit]

    Morgan and Caldwell pose for a tribute photo, holding a picture of Expedition 15 crewmembers, and behind them are tributes to their classmate Patty Hilliard Robertson and the STS-107 crew.

    NASA Managers decided overnight to shorten the fourth EVA by two hours as a precaution due to Hurricane Dean's continued path into the Gulf of Mexico.[50] The EVA duration was five hours and 2 minutes, with a total EVA time of 23 hours and 15 minutes for the mission. The EVA accomplished three primary objectives, and one get-ahead task. Two tasks were deferred: plans to tie down debris shields on the Destiny lab, and relocation of a tool box.[51] During the spacewalk, Williams and Anderson got a good look at Hurricane Dean, and were both awed at the sight. "Holy smoke" was Anderon's initial comment. "Man, that's impressive", Williams replied. Anderson added "They're only impressive when they're not coming towards you."[52] Transfer activities were completed ahead of schedule, and both crews worked hard to get everything transferred back to Endeavour after the spacewalk.

    Dave Williams set two records during his third EVA; He is the Canadian with the most spacewalks (3); and he passed Canadian Astronaut Chris Hadfield in total EVA time. Williams ended Saturday's EVA with a total of 17 hours, 47 minutes of extravehicular time.[53]

    View of Hurricane Dean taken from the International Space Station during the fourth STS-118 EVA.

    During the mission status briefing, Launch Integration Manager LeRoy Cain reported that the Mission Management Team decided to take extra precautions in preparation for the storm, and STS-118 would be cut short a day.[54] In the event of a hurricane evacuation in Houston, an emergency command center would need to be set up. While it was a contingency set in place for years, NASA would prefer to avoid that situation. To that end, Cain reported the EVA was shortened, and the hatch closure would be done Saturday evening, rather than Sunday as planned. Undocking would be at 11:57 UTC Sunday, with the first KSC Landing opportunity on August 21, 2007.

    At 19:46, a short farewell ceremony was performed, followed by hatch closure at 20:10 UTC. Tuesday's tentative KSC landing time would be 12:32 pm EST. (16:30 UTC)[55]

    Sunday August 19 (Flight day 12)[edit]

    The International Space Station moves away from Space Shuttle Endeavour during STS-118

    Endeavour successfully undocked from the International Space Station at 11:56 UTC. Saturday, NASA managers decided the station fly-around that is normally performed following each mission would not be conducted in order to give the Shuttle crew more free time during flight day 12. After several long work days, the Mission Control team felt the crew needed some downtime before the landing process began.

    After undocking, two 4-second firings of the Reaction Control System were performed, in order to distance Endeavour from the station and move to a position above it. There, the crew deployed the robotic arm, beginning Late Inspection of the reinforced carbon-carbon tiles on the nose cap and wing leading edges.[56]

    At the mission status briefing, Matt Abbott reported the undocking was "flawless", and the late inspection was completed successfully. Monday would be a standard pre-landing day, with checkout of the various systems on Endeavour, as well as an educational media event. Entry Flight Director Steve Stich and the entry team will take over mission duties tonight, in preparation for Tuesday's landing.

    John Shannon reported the mission management team meeting went well. The landing plan was reviewed, and all teams reported "go" for landing on Tuesday. The latest track for Hurricane Dean was favorable for the Houston area; the storm seemed to be swinging farther south than originally expected. NASA managers were optimistic that contingency plans would not be needed. Final decisions regarding alternate plans would not be made until Monday, but Shannon noted that White Sands Space Harbor landing facility would be removed as an alternate site. Edwards Air Force Base, and Kennedy Shuttle Landing Facility would be the two sites evaluated on Monday.

    Monday August 20 (Flight day 13)[edit]

    On Monday, with the shuttle approximately 68 miles (109 km) behind the International Space Station, the crew of Endeavour performed a variety of check-out tests in preparation for entry, configured the Spacehab module for entry, and did some last minute stowage. Kelly and Hobaugh worked with the shuttle landing simulator on board, practicing the anticipated landing tracks. Kelly, Williams and Morgan took some time out to talk to students at the Canadian school, La Ronge, in Saskatchewan.

    During the mission status briefing, Entry Flight Director Steve Stich reported the track of Hurricane Dean would not require the activation of contingency plans, and the forecast looked favorable for a Tuesday landing at Kennedy Shuttle Landing Facility.[57] There were also two opportunities for a Florida landing, with the first opportunity beginning with a deorbit burn at 15:25 UTC, and landing at 16:32 UTC. The second opportunity would call for a deorbit burn at 17:00 UTC, with landing at 18:16 UTC. Weather was not expected to interfere with landing, with a forecast of high clouds, but no inclement weather. If the second landing opportunity was taken, the shuttle would fly directly over Hurricane Dean, although it would be well above any effects of the storm. NASA did plan to call up Edwards Air Force Base as the backup site, which had two opportunities on Tuesday, but the plan was to attempt a KSC landing, and if both opportunities were waved off, NASA would decide whether to wait a day, and try for a Wednesday landing at KSC. If Wednesday opportunities at Florida were waved off due to weather, a landing at Edwards Air Force Base would be attempted.[58]

    Tuesday August 21 (Flight day 14, Landing)[edit]

    Endeavour landing at Kennedy Space Center.

    The crew of Endeavour went right to work after waking up on Tuesday, completing the close-out of the Spacehab module, and getting into the deorbit preparations timeline.[59] They closed payload bay doors, transitioned the vehicle computers to landing software mode and donned their reentry suits. At 14:30 UTC, the crew was given the "go" to begin fluid loading. This was done to assist with the crew's ability to adjust to gravity, and to prevent hypotension after landing. At 12:30 UTC, the Space Flight Meteorology Group reported to Entry Team Flight Director Steve Stich that the weather forecast was a "go". The weather at Kennedy Space Center showed only scattered showers moving away from the landing facility, and cross winds were not expected to be a problem. At 15:08 UTC, the crew was given a "go" for the deorbit burn, and the auxiliary power units were started at 15:20 UTC. The 4-minute engine burn was successfully completed at 15:28 UTC, slowing Endeavour by approximately 252 mph (406 km/h) and adjusting the orbiter's trajectory correctly for landing.

    Radar acquisition of Endeavour through MILA happened at 16:19 UTC. At 16:20 UTC, the shuttle had passed the area of peak heating, with no issues reported on board. Main landing gear touchdown occurred at 16:32:16 UTC with nose gear touchdown at 16:32:29 UTC. The orbiter came to a complete stop at 16:33:20 UTC.[60] Upon wheel stop, CAPCOM Christopher Ferguson told the crew, "Congratulations, you've given a new meaning to the term 'higher education.'"[61]

    Damaged tile in the belly of Endeavour during post-landing inspection.

    Initial post-landing inspection of the orbiter showed very little additional damage to the thermal tiles affected by the foam strike during launch. Barbara Morgan did not exit the crew transport vehicle with the rest of the crew; she remained on board the vehicle to receive additional medical tests, and would return to the Astronaut Crew Quarters in that vehicle.[62] The remaining six crew members briefly examined the orbiter, doing the traditional post-flight "walkaround", posed for photos, and then returned to the crew quarters in the Astrovan.

    During the post-landing briefing, NASA Administrator Michael D. Griffin reported that the International Space Station was approximately 60% completed following STS-118. Griffin also stressed the importance of space exploration, and added that the damaged tile on the underside of the orbiter did very well during re-entry.

    Associate Administrator for Spaceflight Operations William H. Gerstenmaier reported the damage was actually less than what the arc jet testing produced, a situation that NASA anticipated, and managers had earlier stressed that arc jets show "worst possible" damage. Launch Director Mike Leinbach stressed how pleased he was with the mission, and with the condition of the vehicle following re-entry. He stated it was "one of the cleanest vehicles the managers have seen since the Return to Flight policies were implemented, if not the cleanest."

    At the end of the briefing, Griffin commented to the media who focused on Barbara Morgan being the first "teacher in space", that Morgan was not technically a "teacher in space", nor was she an "educator astronaut". He stated she was accepted as a mission specialist, before the new class of mission specialist educators were selected in 2004, and NASA considers her to be a mission specialist, who was once a teacher.[10] However, NASA does refer to Morgan as a mission specialist educator in a number of interviews, so the terms seem to be interchangeable to most, if not to Griffin.

    During the post-landing crew press conference, Kelly was asked "Did the tile damage enter your mind at all during re-entry, and what did you think about it once you got a look during the walkaround?" Kelly's reply was, "I thought about it, but only because I knew I'd be asked about it. I didn't worry about it at all. I was underwhelmed by it."[63]

    Summarizing her thoughts on her time in space, Morgan commented,

    "You know, there's a great sense of pride to be able to be involved in a human endeavor that takes us all a little bit farther, when you look down and see our Earth... and you realize what we are trying to do as a human race, it's pretty profound."[64]

    Extra-vehicular activity[edit]

    EVA

    Spacewalkers

    Start (UTC)

    End

    Duration

    Mission

    EVA 1

    Rick Mastracchio
    Dave Williams

    11 August 2007 16:28 UTC

    11 August 2007 22:45 UTC

    6 hours, 17 minutes

    S5 Installation, P6 Radiator retraction and cinch.

    EVA 2

    Rick Mastracchio
    Dave Williams

    13 August 2007 15:32 UTC

    13 August 2007 22:00 UTC

    6 hours, 28 minutes

    Failed CMG removal; new CMG installation.

    EVA 3

    Rick Mastracchio
    Clayton Anderson

    15 August 2007 14:37 UTC

    15 August 2007 20:05 UTC

    5 hours, 28 minutes

    S-Band Antenna Structural Assembly (SASA) relocation from P6 to P1, installation of S-Band Baseband Signal Processor and Transponder to P1, CETA Cart relocation and P6 Transponder retrieval.

    EVA 4

    Dave Williams
    Clayton Anderson

    18 August 2007 14:17 UTC

    18 August 2007 19:19 UTC

    5 hours, 2 minutes

    OBSS Boom Stand Installation; Retrieval of the MISSE-3 and 4 experiments; EWIS Antenna Installation; Secured Z1 SASA gimbal locks in preparation for down mass on 10A.

    Wake-up calls[edit]

    NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15. Each track is specially chosen, often by their family, and usually has special meaning to an individual member of the crew, or is applicable to their daily activities.[65]

    Flight Day

    Song

    Artist

    Played for

    Links

    Day 2

    "Where My Heart Will Take Me"

    Russell Watson

    Rick Mastracchio

    wav mp3

    Day 3

    "Mr. Blue Sky"

    Electric Light Orchestra

    Scott Kelly

    wav mp3

    Day 4

    "Gravity"

    John Mayer

    Charles O. Hobaugh

    wav mp3

    Day 5

    "Up!"

    Shania Twain

    Dave Williams

    wav mp3

    Day 6

    "Outa-Space"

    Billy Preston

    Alvin Drew

    wav mp3

    Day 7

    "Happy Birthday to You"

    Tracy's nieces and nephews

    Tracy Caldwell, for her 38th birthday

    wav mp3

    Day 8

    "Good Morning World"

    Adam, Barbara's son

    Barbara Morgan

    wav mp3

    Day 9

    "Times Like These"

    Foo Fighters

    Rick Mastracchio

    wav mp3

    Day 9

    "Black Horse and the Cherry Tree"

    KT Tunstall

    Tracy Caldwell

    wav mp3

    Day 11

    "Learn to Fly"

    Foo Fighters

    Al Drew

    wav mp3

    Day 12

    "Teacher, Teacher"

    38 Special

    Barbara Morgan

    wavmp3

    Day 13

    "Flying"

    Long John Baldry Trio

    Dave Williams

    wavmp3

    Day 14

    "Homeward Bound"

    Simon and Garfunkel

    entire crew

    wavmp3


    Contingency mission[edit]

    STS-322 was the designation given to the Contingency Shuttle Crew Support mission which would have been launched in the event Endeavour had become disabled during STS-118.[66] It would have been a modified version of the STS-120 mission, which would have involved the launch date being brought forward. If it had been needed, it would have been launched no earlier than September 22, 2007. The crew for this mission would have been a four-person subset of the full STS-120 crew.

    Media[edit]

    Launch of the Space Shuttle Endeavour from Kennedy Space Center in the mission STS-118

    See also[edit]

    References[edit]

    Public Domain This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

    1. ^ NASA (2007). "STS-118 Mission Status Report #27". National Aeronautics and Space Administration. Archived from the original on December 23, 2007. Retrieved November 26, 2007.
  • ^ NASA (July 2007). "STS-118 Press Kit" (PDF). NASA. Archived (PDF) from the original on December 1, 2007. Retrieved August 22, 2007.
  • ^ a b "ISS 13A.1 - Shuttle Endeavour (STS-118)". Space Newsfeed. Microcom Systems. August 12, 2007. Archived from the original on September 27, 2007. Retrieved June 6, 2014.
  • ^ Gebhardt, Chris (June 29, 2010). "Structural Inspections Find Enterprise in Better Than Expected Condition". NasaSpaceFlight.com. Archived from the original on July 3, 2010. Retrieved July 4, 2010.
  • ^ Bergin, Chris (August 21, 2007). "Endeavour's performance during re-entry classed as phenomenal". NasaSpaceFlight.com. Archived from the original on December 5, 2018. Retrieved August 22, 2007.
  • ^ "NASA's Space Shuttle Processing Status Report". NASA. August 31, 2007. Archived from the original on October 29, 2007. Retrieved September 2, 2007.
  • ^ "NASA Assigns Washington, D.C., Native to Upcoming Shuttle Mission". NASA. May 3, 2007. Archived from the original on August 12, 2007. Retrieved August 13, 2007.
  • ^ "NASA Educator Astronaut Program". NASA. February 1, 2004. Archived from the original on February 27, 2004. Retrieved June 6, 2014.
  • ^ "STS-118 Mission Patch". NASA. 2007. Archived from the original on November 21, 2007. Retrieved November 26, 2007.
  • ^ a b Michael Griffin, NASA TV STS-118 Post-Landing briefing.
  • ^ a b Malik, Tariq (August 3, 2007). "Shuttle Endeavour's Stem-to-Stern Overhaul". Fox News. Archived from the original on July 15, 2014. Retrieved August 24, 2007.
  • ^ Boeing (May 3, 2007). "Vehicle Upgrades: Station-Shuttle Power Transfer System (SSPTS)". Boeing. Archived from the original on March 18, 2007. Retrieved August 13, 2007.
  • ^ Johnson Space Center (October 26, 2003). "NASA Presolicitation Notice: (SSPTS)". Johnson Space Center. Retrieved August 13, 2007.[permanent dead link]
  • ^ NASA (December 2, 2005). "NASA's Space Shuttle Processing Status Report". NASA. Archived from the original on December 8, 2007. Retrieved August 13, 2007.
  • ^ NASA (May 1, 2007). "Biography of Barbara Morgan, first Mission Specialist Educator". NASA. Archived from the original on October 2, 2007. Retrieved August 13, 2007.
  • ^ NASA. "Preflight Interview with Barbara Morgan". NASA. Archived from the original on August 25, 2007. Retrieved August 13, 2007.
  • ^ NASA. "Second preflight Interview with Barbara Morgan". NASA. Archived from the original on September 20, 2007. Retrieved August 13, 2007.
  • ^ Halvorson, Todd (January 25, 2007). "Endeavour prepped for return to flight". Florida Today.com. Archived from the original on June 6, 2011. Retrieved August 13, 2007.
  • ^ NASA (July 26, 2007). "NASA Gives 'Go' for Shuttle Endeavour Launch on August 7". NASA. Archived from the original on December 9, 2007. Retrieved August 13, 2007.
  • ^ Harwood, William (August 3, 2007). "Shuttle launch postponed; Crew flies to Cape". Spaceflight Now. Archived from the original on August 15, 2007. Retrieved August 3, 2007.
  • ^ "Countdown on track; weather improves to 80 percent 'go'". CBS News. August 7, 2007. Archived from the original on November 22, 2010. Retrieved August 29, 2009.
  • ^ NASA (August 9, 2007). "STS-118 Status Report 03". NASA. Archived from the original on December 9, 2007. Retrieved August 13, 2007.
  • ^ NASA (August 31, 2000). "Space Shuttle Reference Manual – Thermal Protection System". NASA. Archived from the original on July 15, 2009. Retrieved August 13, 2007.
  • ^ Harwood, William (August 11, 2007). "Mission status briefing; tank appears to have performed well". CBS News. Archived from the original on October 24, 2007. Retrieved August 11, 2007.
  • ^ NASA. "STS-118 Flight Day 3 Status Report". NASA. Archived from the original on October 19, 2007. Retrieved August 11, 2007.
  • ^ NASA. "STS-118 Flight day 5 Status Report". NASA. Archived from the original on November 23, 2007. Retrieved August 13, 2007.
  • ^ Shannon, John. "Image of area of interest on Endeavour". NASA. Archived from the original on September 28, 2007. Retrieved August 12, 2007.
  • ^ Shannon, John. "Mission Status Briefing Graphics". NASA. Archived from the original on November 23, 2007. Retrieved August 14, 2007.
  • ^ Harwood, William (August 14, 2007). "New gyro installed; spacewalk ends". CBS Space News. Archived from the original on October 24, 2007. Retrieved August 14, 2007.
  • ^ Harwood, William (August 14, 2007). "Update: Shannon said tile damage not considered a threat to astronauts". CBS Space News. Archived from the original on October 24, 2007. Retrieved August 14, 2007.
  • ^ NASA (August 14, 2007). "STS-118 Status Report #13". NASA. Archived from the original on August 23, 2007. Retrieved August 15, 2007.
  • ^ Harwood, William (August 14, 2007). "Kelly downplays tile concern; Morgan said spaceflight worth the wait". CBS News. Archived from the original on October 24, 2007. Retrieved August 14, 2007.
  • ^ Boehm, Paul (August 15, 2007). "STS-118 Mission Status Briefing Graphics". NASA. Archived from the original on September 28, 2007. Retrieved August 16, 2007.
  • ^ Harwood, William (August 15, 2007). "Mastracchio cuts spacewalk short after noting glove damage". CBS. Archived from the original on October 24, 2007. Retrieved August 15, 2007.
  • ^ Montalbano, Joel (August 16, 2007). "Mission Status Briefing Graphics". NASA. Archived from the original on November 22, 2007. Retrieved August 16, 2007.
  • ^ NASA (August 16, 2007). "Status Report #15". NASA. Archived from the original on October 20, 2008. Retrieved August 16, 2007.
  • ^ Harwood, William (August 15, 2007). "Spacewalk No. 4 moved from Friday to Saturday; no decision yet on tile repair". CBS. Archived from the original on October 24, 2007. Retrieved August 15, 2007.
  • ^ Dunn, Marcia (August 14, 2007). "NASA studies shuttle repair options". Associated Press. Retrieved May 13, 2023.
  • ^ Malakoff, David (August 17, 2007). "NASA Nears Decision on Shuttle Repair". NPR. Archived from the original on August 25, 2007. Retrieved August 17, 2007.
  • ^ Austin Peterson, Liz (August 17, 2007). "NASA Optimistic No Shuttle Fix Needed". AP /Discovery News. Archived from the original on September 4, 2007. Retrieved August 17, 2007.
  • ^ Klotz, Irene (August 17, 2007). "Shuttle crew awaits word on heat shield work". Reuters. Archived from the original on February 28, 2023. Retrieved August 17, 2007.
  • ^ NASA (August 17, 2007). "STS-118 Mission Status Report #17". NASA. Archived from the original on December 6, 2007. Retrieved August 17, 2007.
  • ^ Chang, Kenneth (August 17, 2007). "NASA Rules Out Repair to Gouge in Shuttle". The New York Times. Archived from the original on January 10, 2016. Retrieved August 17, 2007.
  • ^ Shannon, John (August 17, 2007). "STS-118 Mission Status Briefing Graphics". NASA. Archived from the original on November 22, 2007. Retrieved August 17, 2007.
  • ^ Dunn, Marcia (August 17, 2007). "NASA Decides No Shuttle Repairs Needed". AP /Washington Post. Archived from the original on November 2, 2012. Retrieved August 17, 2007.
  • ^ NASA (August 17, 2007). "STS-118 Status Report #18". NASA. Archived from the original on December 9, 2007. Retrieved August 17, 2007.
  • ^ AP (August 16, 2007). "Astronauts relieved about skipping repairs". MyPlainView.com. Archived from the original on December 5, 2022. Retrieved December 5, 2022.
  • ^ Klotz, Irene (August 17, 2007). "Hurricane threat may bring shuttle home early". Reuters. Archived from the original on February 28, 2023. Retrieved August 17, 2007.
  • ^ NASA (August 18, 2007). "STS-118 Status Report #19". NASA. Archived from the original on December 8, 2007. Retrieved August 18, 2007.
  • ^ NASA (August 18, 2007). "STS-118 Mission Status Briefing Graphics". NASA. Archived from the original on November 22, 2007. Retrieved August 18, 2007.
  • ^ NASA (August 19, 2007). "STS-118 Status Report #21". NASA. Archived from the original on October 20, 2008. Retrieved August 19, 2007.
  • ^ Harwood, William. "Astronauts marvel at Hurricane Dean". CBS News. Archived from the original on October 24, 2007. Retrieved August 19, 2007.
  • ^ Blatchford, Andy (August 19, 2007). "Astronaut Dave Williams sets Canadian record with third spacewalk". CanadaEast Telegraph-Journal. Archived from the original on September 27, 2007. Retrieved August 19, 2007.
  • ^ NASA (May 2007). "LeRoy E. Cain Biography". NASA. Archived from the original on August 14, 2007. Retrieved August 18, 2007.
  • ^ Dunn, Marcia (August 18, 2007). "NASA orders shuttle home 1 day early because of hurricane". Associated Press. Archived from the original on September 7, 2008. Retrieved October 30, 2008.
  • ^ Associated Press (August 19, 2007). "Shuttle heads home, aiming to beat storm". AP / NBC News. Archived from the original on January 10, 2016. Retrieved August 19, 2007.
  • ^ Austin Peterson, Liz (August 20, 2007). "Astronauts Prepare for Tuesday Return". San Francisco Chronicle/AP. Archived from the original on December 20, 2007. Retrieved August 20, 2007.
  • ^ NASA (August 20, 2007). "STS-118 Landing Ground Tracks". NASA. Archived from the original on November 23, 2007. Retrieved August 20, 2007.
  • ^ NASA (August 21, 2007). "STS-118 Status Report #26". NASA. Archived from the original on September 4, 2007. Retrieved August 21, 2007.
  • ^ NASA (August 21, 2007). "NASA STS-118 Landing Blog". NASA. Archived from the original on November 4, 2007. Retrieved August 21, 2007.
  • ^ Klotz, Irene (August 21, 2007). "Space shuttle Endeavour lands safely in Florida". Reuters. Archived from the original on August 23, 2007. Retrieved August 21, 2007.
  • ^ Harwood, William (August 21, 2007). "Shuttle Endeavour glides to smooth Florida landing". SR-77. CBS News. Archived from the original on October 24, 2007. Retrieved August 21, 2007.
  • ^ Chang, Kenneth (August 21, 2007). "Shuttle Glides Safely Home in Spite of Damage". The New York Times. Archived from the original on January 10, 2016. Retrieved August 22, 2007.
  • ^ Malik, Tariq (August 22, 2007). "Teacher-Astronaut, Crewmates Glad to be Home". Space.com. Archived from the original on May 23, 2009. Retrieved August 22, 2007.
  • ^ Fries, Colin (June 25, 2007). "Chronology of Wakeup Calls" (PDF). NASA. Archived (PDF) from the original on June 20, 2010. Retrieved August 13, 2007.
  • ^ Bergin, Chris (April 15, 2007). "NASA sets new launch date targets through to STS-124". NASASpaceflight. Archived from the original on March 3, 2016. Retrieved August 21, 2007.
  • External links[edit]

    Flights

  • STS-47
  • STS-54
  • STS-57
  • STS-61
  • STS-59
  • STS-68
  • STS-67
  • STS-69
  • STS-72
  • STS-77
  • STS-89
  • STS-88
  • STS-99
  • STS-97
  • STS-100
  • STS-108
  • STS-111
  • STS-113
  • STS-118
  • STS-123
  • STS-126
  • STS-127
  • STS-130
  • STS-134
  • Status

    • Retired

    On display

    See also: {{ISS expeditions}}, {{Uncrewed ISS flights}}

    1998–2004

  • 1999
  • 2000
  • 2001
  • 2002
  • 2003
  • 2004
  • International Space Station Insignia
    International Space Station Insignia
    International Space Station Emblem
    International Space Station Emblem

    2005–2009

  • STS-114
  • Soyuz TMA-7
  • 2006
  • 2007
  • 2008
  • 2009
  • 2010–2014

  • Soyuz TMA-18
  • STS-131
  • 132
  • Soyuz TMA-19
  • TMA-01M
  • TMA-20
  • 2011
  • 2012
  • 2013
  • 2014
  • 2015–2019

  • TMA-17M
  • TMA-18M
  • TMA-19M
  • 2016
  • 2017
  • 2018
  • 2019
  • Since 2020

  • SpaceX Demo-2
  • Soyuz MS-17
  • SpaceX Crew-1
  • 2021
  • 2022
  • 2023
  • 2024
  • Future

  • Soyuz MS-26
  • Axiom-4
  • 2025
  • Individuals

    Vehicles

  • Present
  • Future
    • Ongoing spaceflights are in underline
  • † - mission failed to reach ISS
  • Completed
    (crews)

    1970s

    1980s

  • STS-2
  • 1982
  • 1983
  • 1984
  • 1985
  • 1986
  • 1988
  • 1989
  • 1990s

  • STS-36
  • STS-31
  • STS-41
  • STS-38
  • STS-35
  • 1991
  • 1992
  • 1993
  • 1994
  • 1995
  • 1996
  • 1997
  • 1998
  • 1999
  • 2000s

  • STS-101
  • STS-106
  • STS-92
  • STS-97
  • 2001
  • 2002
  • 2003
  • 2005
  • 2006
  • 2007
  • 2008
  • 2009
  • 2010s

  • STS-131
  • STS-132
  • 2011
  • Cancelled

  • STS-61-E
  • STS-61-F
  • STS-61-G
  • STS-61-H
  • STS-62-A
  • STS-61-M
  • STS-61-J
  • STS-144
  • STS-3xx
  • STS-400
  • Others
  • Orbiters

  • Challenger
  • Columbia
  • Discovery
  • Endeavour
  • Enterprise
    • indicates failure missions.

    Orbital launches in 2007

    2008 →

    January

  • Progress M-59
  • NSS-8
  • February

  • THEMIS A, THEMIS B, THEMIS C, THEMIS D, THEMIS E
  • IGS Radar 2, IGS Optical 3V
  • March

  • Skynet 5A, INSAT-4B
  • April

  • Anik F3
  • Hai Yang 1B
  • Compass-M1
  • EgyptSat 1, Saudisat-3, SaudiComsat-3, SaudiComsat-4, SaudiComsat-5, SaudiComsat-6, SaudiComsat-7, CP-3, CP-4, CAPE-1, Libertad 1, AeroCube 2, CSTB-1, MAST
  • AGILE, AAM
  • NFIRE
  • AIM
  • May

  • Progress M-60
  • NigComSat-1
  • Yaogan 2, Zheda PiXing 1
  • Globalstar 65, Globalstar 69, Globalstar 71, Globalstar 72
  • Sinosat-3
  • June

  • COSMO-1
  • STS-117 (ITS S3/4)
  • Ofek-7
  • TerraSAR-X
  • USA-194
  • Genesis II
  • Kosmos 2428
  • July

  • Zhongxing 6B
  • DirecTV-10
  • August

  • Phoenix
  • STS-118 (ITS S5, SpaceHab LSM)
  • Spaceway-3, BSAT-3a
  • September

  • JCSAT-11
  • Kosmos 2429
  • Kaguya (Okina, Ouna)
  • Foton-M No.3, YES2
  • WorldView-1
  • CBERS-2B
  • Dawn
  • October

  • Soyuz TMA-11
  • USA-195
  • USA-196
  • Globalstar 66, Globalstar 67, Globalstar 78, Globalstar 70
  • Kosmos 2430
  • STS-120 (Harmony)
  • Chang'e 1
  • Kosmos 2431, Kosmos 2432, Kosmos 2433
  • November

  • USA-197
  • Yaogan 3
  • Skynet 5B, Star One C1
  • Sirius 4
  • December

  • COSMO-2
  • USA-198
  • Radarsat-2
  • USA-199
  • Horizons-2, Rascom-QAF 1
  • Progress M-62
  • Kosmos 2434, Kosmos 2435, Kosmos 2436
  • Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
    Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).


    Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-118&oldid=1232028873"

    Categories: 
    Space Shuttle missions
    Spacecraft launched in 2007
    Spacecraft which reentered in 2007
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from January 2024
    Articles with permanently dead external links
    Articles with short description
    Short description is different from Wikidata
    Use mdy dates from February 2023
    Wikipedia articles incorporating text from NASA
    Commons link is on Wikidata
    Webarchive template wayback links
    Use American English from January 2014
    All Wikipedia articles written in American English
    Articles containing video clips
     



    This page was last edited on 1 July 2024, at 15:19 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki