Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Service  



1.1  Competition with Kintetsu  







2 Stations  





3 Rolling stock  





4 History  



4.1  Overview  





4.2  Sangū Railway  





4.3  Government ownership  





4.4  Mie Rapid  





4.5  2007 closure proposal  





4.6  Timeline  





4.7  Former connecting lines  







5 References  





6 External links  














Sangū Line






Esperanto
Français

Italiano


 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Sangū Line
Mie Rapid service
Overview
StatusIn operation
OwnerJR Central
LocaleMie Prefecture
Termini
  • Toba
  • Stations10
    Service
    TypeCommuter rail
    Operator(s)JR Central
    Rolling stockKiHa 75 series DMU, KiHa 25 series DMU
    History
    OpenedJuly 21, 1911
    Technical
    Line length29.1 km (18.1 mi)
    Number of tracksEntire line single tracked
    CharacterRural with urban sections
    Track gauge1,067 mm (3 ft 6 in)
    ElectrificationNone
    Operating speed100 km/h (62 mph)

    Route map

    All lines are JR unless otherwise noted

    Nagoya

    Kameyama

    Tsu

    0.0
    Taki

    Right Sangū Line

    3.3
    Tokida

    7.0
    Tamaru

    Old National Route 23

    11.0
    Miyagawa

    13.2
    Yamada-Kamiguchi
    (Sujikaibashi)

    15.0
    Iseshi
    (Yamada)
    Kintetsu: Iseshi

    Kintetsu Yamada Line

    17.9
    Isuzugaoka

    21.4
    Futaminoura

    Eno Tunnel

    23.7
    Matsushita

    25.4
    Ikenoura Seaside
    Seasonal

    Kintetsu Toba Line

    29.1
    Toba
    Kintetsu: Toba

    Down Kintetsu Shima Line

    The Sangū Line (参宮線, Sangū-sen) is a railway line run by Central Japan Railway Company (JR Central), connecting Taki Station (Taki, Mie) with Toba Station (Toba, Mie) in Japan.

    The line connects with the Kisei Main Line at Taki Station. From Taki, the line runs parallel to the Kintetsu Yamada Line and Toba Line. These lines all serve the Ise-Shima tourist region.

    The name of the line, "Sangū", was chosen because that word is a kanji abbreviation of a phrase in Japanese that roughly translates to "a pilgrimage to Ise Grand Shrine", and making the pilgrimage to the Shrine easier is exactly why the line was built.

    Service

    [edit]

     LO  Local (普通 futsū)

    Up For Taki, Kameyama
    Down For Iseshi, Toba
    Locals stop at every station.
    Almost all trains are wanman driver-only services.
    Trains run approximately once an hour in each direction.


     MR  Mie Rapid (快速みえ kaisoku-mie)

    Up For Nagoya; via Tsu and Yokkaichi
    Down For Iseshi, Toba
    Seat reservations can be made.
    Trains run approximately once an hour in each direction.

    Competition with Kintetsu

    [edit]

    Kintetsu and JR Central have parallel lines running all the way from Nagoya to Toba that compete heavily. For Kintetsu, this includes their Nagoya Line, Yamada Line, and Toba Line, and on the JR side it includes parts of the Kansai Main Line, the Ise Railway, Kisei Main Line and the Sangū Line.

    Stations

    [edit]
    ● Trains stop here
    ○ Some trains stop here

    Formerly, there was a station named Ikenoura Seaside between Matsushita and Toba. However, the station was permanently closed on 14 March 2020, owing to declining passenger numbers over several years.

    Station Dist (km) Transfers LO MR Location
    Taki 多気 0.0 Kisei Main Line Taki Mie Prefecture
    Tokida 外城田 3.3
    Tamaru 田丸 7.0 Tamaki
    Miyagawa 宮川 11.0 Ise
    Yamada-Kamiguchi 山田上口 13.2
    Iseshi 伊勢市 15.0 Kintetsu Yamada Line
    Isuzugaoka 五十鈴ヶ丘 17.9
    Futaminoura 二見浦 21.4
    Matsushita 松下 23.7
    Toba 鳥羽 29.1 Kintetsu Toba Line, Shima Line Toba

    Rolling stock

    [edit]

    History

    [edit]

    Overview

    [edit]

    The Sangū Line is one of the oldest railway lines in Mie Prefecture and was the first railway built to provide passage to Ise Grand Shrine. Though mostly built by a private company, the line was owned and operated by the Japanese national government for 80 years before becoming part of JR Central. Since it was the original train route to Ise Grand Shrine, it historically saw more frequent trains and passengers than it does today. However, competition with rival Kintetsu hurt ridership on the line over the years to the point that some even proposed selling or abandoning the line at times.

    Sangū Railway

    [edit]

    The line was originally conceived and partially built by the Sangū Railway (参宮鉄道, Sangū Tetsudō) in the late 19th century during the Meiji era. During the Edo era, Ise Grand Shrine in what is now Ise, Mie Prefecture became an extremely popular place for pilgrimages due to its special significance within Shinto. When Japan started construction of its major railway lines during the Meiji Restoration, there was a call to build a branch line that would connect Ise Grand Shrine with the rest of Japan. Sangū Railway was formed for this purpose, and they began building what is now one of the oldest railroads in Mie Prefecture. The line was built as far as Yamada Station (now Iseshi) under Sangū Railway but was then acquired by the national government under the Railway Nationalization Act of 1906.

    Government ownership

    [edit]

    Under ownership of the government, the line was extended to its present endpoint of Toba Station. In the first quarter of the 20th century, before the outbreak of World War II, the Sangū Line came to be considered a major line due to its importance in providing transportation for pilgrims to Ise Grand Shrine. Express trains providing direct service to and from Tokyo, Osaka, and as far away as Uno StationinOkayama Prefecture were running at this time, and dual tracks were added to many parts of the line to allow for an increase in the frequency of trains. However, through the ownership of the government, these dual tracks were dug up near the end of the war and were used as emergency scrap metal for military operations.

    After the war, the Sangū Line saw its first rival railway line which was owned by Kintetsu who offered express service from Osaka and Nagoya. However, the Sangū Line maintained its competitive edge in the 1940s and 1950s because Kintetsu was, at the time, not yet able to offer direct service from Nagoya due to differences in track gauge, so passengers that were coming to Ise Grand Shrine via Nagoya were forced to change trains during the journey if they took Kintetsu, thus many people opted to take the government-owned Kokutetsu option instead since it was direct.

    In the 1960s, there was a plan to rebuild the dual tracks that had been taken away by the government during the war but the plan encountered some problems. By 1960, Kintetsu had altered its Nagoya Line to utilize the same gauge as the rest of its lines and therefore direct Kintetsu service was now available. A few years later, Kintetsu acquired its Kyoto Line and thus it was now offering direct service from Kyoto as well as Osaka and Nagoya. Finally, Kintetsu built its Toba Line, which created competition along the only remaining section of the Sangū Line that had previously had no rival. All this combined led to reduced ridership which in turn led Kokutetsu to revoke the Sangū Line's status as a major line; the line became classified as a local line and the plan to rebuild the dual tracks was abandoned. Kokutetsu was even advised in 1968 to permanently close the Iseshi to Toba section of the line, however they opted instead to discontinue direct express service from various major cities in the following years. This issue of permanently closing the line arose again in the early 1980s, however after a close inspection of the daily number of riders on the line it narrowly avoided being re-classified as a third sector railway and survived the transition to JR in 1987.

    Mie Rapid

    [edit]

    In 1988, under new ownership by JR Central, direct services from Nagoya were resumed for the first time in twenty years to compete with Kintetsu. This train was originally called the Mie Home Liner and, at the time, was only offered seasonally. Direct services were only provided as far as Matsusaka on the Kisei Main Line. However in 1991, the train was renamed to its current name of Mie Rapid and services were extended to the Sangū Line to serve Ise, Futami and Toba. Historically, direct services from Nagoya were considered expresses and therefore passengers were subject to additional fees. But the Mie Rapid is officially classified as a "rapid" and thus there are no extra fees above the standard fare; this was done to compete with the Kintetsu Limited Express trains, which require extra fees. The Mie Rapid has been successful at making JR a more viable option for tourists visiting the Ise-Shima area, though Kintetsu still maintains superior passenger numbers.

    2007 closure proposal

    [edit]

    In May 2007, the chairman of the Akafuku group, Masutane Hamada, suggested that the Sangū Line be closed and the train inspection depot at Iseshi Station be transformed into a parking lot. This plan was put forth in hopes of alleviating traffic jams caused by pilgrims coming to Ise in 2013 to celebrate the rebuilding of Ise Grand Shrine. Hamada has tried to point out to other leaders in the area, including the Mayor of Ise, that "the Sangū Line is a large-scale obstruction and the Iseshi Station depot could hold 1000 cars if turned into a parking lot". The Mayor of Ise decided to request a year-long serious study of ridership on the line before making any decisions. JR Central, opposes Hamada's proposal and the company president has said he has not heard widespread demand for the line to be closed. Hamada himself has even admitted that the proposal is unlikely to be realized.[2]

    Timeline

    [edit]
    Emblem of Sangū Railway

    Former connecting lines

    [edit]

    References

    [edit]

    This article incorporates material from the corresponding article in the Japanese Wikipedia.

    1. ^ 紀勢本線・参宮線でキハ11形からキハ25形へ置換え [Switch from KiHa 11 to KiHa 25 on Kisei Main Line and Sangu Line]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 3 August 2015. Retrieved August 4, 2015.
  • ^ Akafuku Chairman: "Close the Sangū Line, make it a parking lot". Asahi Shimbun, May 26, 2007. Archive copy (in Japanese)
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Sangū_Line&oldid=1216818566"

    Categories: 
    Lines of Central Japan Railway Company
    Rail transport in Mie Prefecture
    1067 mm gauge railways in Japan
    Railway lines opened in 1911
    1911 establishments in Japan
    Hidden categories: 
    CS1 uses Japanese-language script (ja)
    CS1 Japanese-language sources (ja)
    Articles with Japanese-language sources (ja)
    Articles with short description
    Short description matches Wikidata
    Articles needing additional references from May 2020
    All articles needing additional references
    Articles containing Japanese-language text
     



    This page was last edited on 2 April 2024, at 04:07 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki