Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 First proposal  





2 Second proposal  





3 Sale of the site  





4 INDX Tower  





5 See also  





6 References  





7 External links  














Sapphire Tower







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 43°3901N 79°2256W / 43.650391°N 79.382141°W / 43.650391; -79.382141
 

From Wikipedia, the free encyclopedia
 


Sapphire Tower
Map
General information
TypeLuxury hotel and condominium skyscraper
LocationToronto, Ontario, Canada
Coordinates43°39′01N 79°22′56W / 43.650391°N 79.382141°W / 43.650391; -79.382141

The Sapphire Tower was a proposed luxury hotel and condominium skyscraperinToronto, Ontario, Canada, to be built by developer Harry Stinson. It was so named because all plans for it had deep blue glass curtain walls.[1] This site had been involved in numerous other proposals, including Stinson's own Downtown Plaza[2] concept, and an earlier proposal that would have incorporated the neighbouring Graphic Arts Building.

First proposal[edit]

The first iteration of Sapphire Tower would have stood at 196 metres (643 ft) or 62 floors. Scheduled to begin construction in Spring 2007, the previous 90-storey proposal on Temperance Street, which would have stood at 342 metres (1,122 ft), was rejected because of shadow and height concerns.

According to a story in the February 16, 2007-edition of The Globe and Mail, after acquiring the property in 2003, high-profile Toronto developer Harry Stinson toyed with a skyscraper condo-hotel project for about a year.[3] However, after announcing the project and securing investors, Stinson was unable to secure the full amount he needed for construction and lost control of the property when lenders recalled their loans.[4]

On November 15, 2005, the Toronto and East York Community Council, a committee of Toronto City Council, refused permission for the tower to be built on its proposed site.[5] At issue was the thin shadow that would have been cast by the building over Nathan Phillips Square, site of Toronto's City Hall. The Council argued that it needed to "protect City Hall's public square". Stinson planned to appeal the decision to the Ontario Municipal Board.

The design evolved to its proposed height in response to the approval of the Trump International Hotel & Tower by the city council. Stinson intended to create a friendly rivalry for the tallest residential building in Canada. Sapphire Tower would have been 17 metres taller.

In early January 2006, Stinson announced his intent to compromise with city council. Instead of a more than 90-storey building, the focus shifted to designing a shorter building of approximately 70 storeys, with a slanted roof that would further minimize the shadow concerns.

Sapphire Tower was to be operated much like Stinson's earlier hotel project 1 King West. Each of the over 1,000 suites was to be individually owned by its purchaser,[6] with the opportunity of generating revenue through enrolment in a central management system.

Facing high levels of dissent from 1 King West owners at the hotel's lack of profitability, Stinson decided not to offer the same system to Sapphire Tower purchasers. Instead, the building would have consisted primarily of private residences, where the purchaser may occupy the suite or lease it out themselves in a traditional fashion. There would have been a small hotel component to the building of roughly 200 suites, but they would have been retained and operated by Stinson. With all the design and use changes, a new name to replace "Sapphire Tower" was expected but did not occur.

Second proposal[edit]

After numerous designs the finalized height for the second proposal had been approved at 196 metres (643 feet) or 62 floors and 58,993 m² (635,000 sq. ft.) in density. Construction was expected to start in spring 2007, with an opening in early 2009. Levels 2 through to 11 would have been office space, Level 12 would have been an amenity floor for residences, Levels 13-42 would have been 'house like apartments', Levels 43-60 would have been a long stay boutique hotel, and Levels 61-62 would have been the sapphire penthouse suites in the crystalline part of the tower.

On July 20, 2007, Sapphire Tower Development Corp., the parent company owned by Stinson, was approved for bankruptcy protection. All future plans of development for the Sapphire Tower were stopped. Sapphire Tower Development Corp. listed the development (including land) for sale to respective buyers in order to repay creditors.

Sale of the site[edit]

A partnership of Israel Land Development Company and Skyline International Development Inc. (the Canadian division of Mishorim Development) purchased the site at 70 Temperance Street in December 2007 from the property's receiver for C$24.1 million. The partners announced plans to build a 55-storey office, hotel, and residential skyscraper on the site for an estimated C$138 million.[7] A 54-storey design by Page+Steele architects was later revealed.

INDX Tower[edit]

By 2011, after several designs had been released, no construction had begun. In December 2011, Mishorim sold the undeveloped lot to CentreCourt Developments for C$39 million.[8] CentreCourt, in partnership with Lifetime, marketed as a new condo development on the lot. The 51-floor 179 metres (587 ft) INDX Tower was completed in 2016 is shorter than the planned Sapphire Tower.

See also[edit]

References[edit]

  1. ^ Osbaldeston, Mark (2011-10-03). Unbuilt Toronto 2: More of the City That Might Have Been. Dundurn Press Ltd. p. 164. ISBN 978-1459700932.
  • ^ Greene, Joel. "The Downtown Plaza, Toronto Condo Hotel". Condo Hotel Center. Retrieved 2017-08-31.
  • ^ Mays, John Bentley (February 16, 2007). "Will Temperance Street finally get its jewel?". The Globe and Mail.
  • ^ Kelly, Deidre (August 25, 2007). "Sapphire? These days, investors feel blue". The Globe and Mail. Retrieved 2017-08-31.
  • ^ "Skyline rulings revert to form; A decision made in city's NIMBY tradition". Toronto Star. November 16, 2005. p. B 01. Retrieved 2017-08-31.
  • ^ "Shiny blue cylinders make Sapphire Tower". Toronto Star. December 4, 2004. Retrieved 2017-08-31.
  • ^ "Mishorim and Israel Land planning NIS 1b Toronto skyscraper". Globes. Archived from the original on 10 July 2012. Retrieved 26 February 2012.
  • ^ "Mishorim unit sells Toronto lot for C$39m". Globes. December 25, 2011. Retrieved 2017-08-31.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Sapphire_Tower&oldid=1135402262"

    Categories: 
    Unbuilt buildings and structures in Canada
    History of Toronto
    Skyscrapers in Toronto
    Skyscraper hotels in Canada
    Condominiums in Canada
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 24 January 2023, at 13:07 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki