Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 References  





3 Literature  














Schlachte Great Crane






Deutsch
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 53°0432.58N 8°4810.09E / 53.0757167°N 8.8028028°E / 53.0757167; 8.8028028
 

From Wikipedia, the free encyclopedia
 


Foundations of the great crane
The Bremen crane shown in 1640

The Schlachte Cranes were important to the port of Bremen as they enabled heavy loads to be moved off boats on the River Weser. The Schlachte became an important harbour for the city after silting prevented the use of the Balge as a harbour. Today, only the foundations of a 19th-century crane remain on the Weser waterfront.

History[edit]

1725 diagram of the crane by Leupold[1]

A map of Bremen made around 1640 clearly shows what must be a large crane. The wooden structure was built around a central mast that allowed the crane to turn.

A new harbour crane installed in 1684 is attributed to Jacob Leupold.[1] This crane could also rotate but two large treadwheels enabled six men to lift a load of three tonnes. In his book on the theory of machines, Leupold illustrates two cranes at Bremen. The more ambitious model is pictured here. The boom would have been much longer as it has been shortened to fit within the illustration. The crane would have been used for moving exceptionally heavy loads of single items as the predominant method of moving loads was to use human labour.

The Schlachte became an important harbour for the city after silting prevented the use of the Balge as a harbour. Today the stone foundations of a large crane are preserved on the Schlachte promenade along the River Weser. A plaque explains the history of the cranes.

References[edit]

  1. ^ a b Theatrum Machinarum Generale ("The General Theory of Machines"), Jacob Leupold.

Literature[edit]

53°04′32.58″N 8°48′10.09″E / 53.0757167°N 8.8028028°E / 53.0757167; 8.8028028


Retrieved from "https://en.wikipedia.org/w/index.php?title=Schlachte_Great_Crane&oldid=864478152"

Categories: 
Buildings and structures in Bremen (city)
Buildings and structures completed in 1684
Individual cranes (machines)
1684 establishments in the Holy Roman Empire
Hidden categories: 
Pages using gadget WikiMiniAtlas
Use dmy dates from January 2014
Commons category link is on Wikidata
Coordinates on Wikidata
 



This page was last edited on 17 October 2018, at 13:46 (UTC).

Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



Privacy policy

About Wikipedia

Disclaimers

Contact Wikipedia

Code of Conduct

Developers

Statistics

Cookie statement

Mobile view



Wikimedia Foundation
Powered by MediaWiki