Jump to content

Shendu Highway station

Coordinates: 31°03′49″N 121°30′25″E / 31.0636°N 121.507°E / 31.0636; 121.507
From Wikipedia, the free encyclopedia
(Redirected from Shendu Highway Station)

Shendu Highway


沈杜公路

Shanghai Metro

Line 8 platform
General information
Other namesAerospace Museum (former)
LocationShendu Highway and Puxing Highway
Pujiang Town, Minhang District, Shanghai
China
Coordinates31°03′49″N 121°30′25″E / 31.0636°N 121.507°E / 31.0636; 121.507
Operated byShanghai No. 4 Metro Operation Co. Ltd. (Line 8)
Shanghai Keolis Public Transport Operation Management Co. Ltd. (Pujiang line)
Line(s)     Line 8
     Pujiang line
Platforms6 (2 island platforms and 2 side platforms)
Tracks4
Construction
Structure typeElevated
AccessibleYes
History
Opened5 July 2009 (Line 8)
31 March 2018 (Pujiang line)
Previous namesAerospace Museum (up to 31 August 2013)
Services
Preceding station Shanghai Metro Following station
Lianhang Road Line 8 Terminus
Terminus Pujiang line Sanlu Highway
towards Huizhen Road

Shendu Highway (Chinese: 沈杜公路; pinyin: Shěndù Gōnglù), formerly Aerospace Museum (simplified Chinese: 航天博物馆; traditional Chinese: 航天博物館; pinyin: Hángtiān Bówùguǎn),[1] is an interchange station between Line 8 and Pujiang line of the Shanghai Metro in the town of Pujiang, Minhang District, Shanghai, at Shendu Highway and Puxing Highway. This station serves as the southern terminus of Line 8 and the northern terminus of the Pujiang line, and opened on 5 July 2009, with the second phase of Line 8. The station became an interchange station between Line 8 and the Pujiang line on 31 March 2018, with the opening of the Pujiang line further south to Huizhen Road.[2]

Naming[edit]

The station was named Aerospace Museum until 31 August 2013, when it was changed to Shendu Highway.[1] It was expected to undergo another name change to Pujiang Country Park[3] with the opening of the Pujiang line.[4] However, this name change is no longer being considered.[5]

Station Layout[edit]

2F Side platform, doors open on the right, drop off only
Northbound      Pujiang line termination track
Island platform, doors open on the left
Southbound      Pujiang line towards Huizhen Road (Sanlu Highway)
Side platform, doors open on the right, boarding pujiang line only
Northbound      Line 8 towards Shiguang Road (Lianhang Road)
Island platform, doors open on the left
Southbound      Line 8 termination track →
G Entrances and Exits Exits 1-2

References[edit]



(一)^ abShanghai Metro (2013-08-29). 11线831 (in Chinese). Retrieved 2013-09-02. 8线

(二)^ 线331. Shanghai Shentong Metro Group (in Chinese).

(三)^ (simplified Chinese: ; traditional Chinese: ; pinyin: Pǔjiāng Jiāoyě Gōngyuán)

(四)^ 线 [Notice: Pujiang Line to begin trial operations in first quarter of 2018.] (in Simplified Chinese). 163 News. 27 December 2017.

(五)^ Shanghai Municipal Government (2017-12-27). 线 (in Chinese (China)).