Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History and status  



1.1  Boița  Făgăraș  Brașov sections  





1.2  Brașov  Răcăciuni section  







2 See also  





3 References  





4 External links  














SibiuBacău Motorway






Magyar
Nederlands
Polski
Română
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


A13 motorway shield}}

A13 motorway
Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length0 km (0 mi; 0 ft)

282 km (175 mi) planned
68 km (42 mi) under construction

Major junctions
From A 1 near Boița
Major intersections A 3 near Făgăraș
A 3 near Brașov
To A 7 near Răcăciuni
Location
CountryRomania
Highway system
A 12 A 14

The Sibiu–Brașov–Bacău Motorway (Romanian: Autostrada Sibiu–Brașov–Bacău) is a planned motorway in the central part of Romania, designed to connect Sibiu and Bacău counties, via Brașov.[1] The project is currently regarded as composed of three sections BoițaFăgăraș, Făgăraș – Brașov (also part of the A3 motorway), and Brașov – Răcăciuni, planned to be 282 kilometres (175 mi) long.[1]

History and status[edit]

Boița – Făgăraș – Brașov sections[edit]

From Boița (junction with A1), it will follow the Olt River valley before running through Avrig, Cârțișoara, Voila to a junction with A3 east of Făgăraș, with which it intersects until west of Brașov, where there's another junction with A3. The Făgăraș – Brașov section will be shared with A3 motorway.

This 120 km (75 mi) long section was initially planned as an expressway as an alternative to the National Road 1 (DN1) between Sibiu and Făgăraș at 72.57 kilometres (45.09 mi) long and with an estimated cost of 614 mil. €.[2] In 2013, the Romanian government has reportedly changed the plans in order to provide the connection from Sibiu to Bucharest alternative to A1 via Pitești as part of the Trans European Transport Network,[3] thus implementing it as a motorway rather than expressway.[4][5]

The feasibility study and the technical project for the Boița – Făgăraș section (68.05 km (42.28 mi)) were approved in December 2021 and January 2022, respectively.[6] The total value of the investment was estimated at 7.5 billion RON.[6]

On 5 May 2023, the auction of the lot 4 (16.26 km (10.10 mi)) of the Boița - Făgăraș section of the motorway was won by the Turkish association Makyol - Yapi. The total term length is 48 months, (12 months for the project stage and 36 months for the execution stage).[7]

On 20 September 2023, the contract for the design and execution of the lot 3 (17.61 km (10.94 mi)) was signed with the same association Makyol - Yapi.[8]

Brașov – Răcăciuni section[edit]

From Brașov, the motorway will cross through the plains of the Szekely Land (Ținutul Secuiesc), reaching the cities of Sfântu Gheorghe and Târgu Secuiesc, then cross the Eastern Romanian Carpathians through the Oituz Pass to reach Onești, then the junction with A7 near Răcăciuni towards Bacău (north) and Focșani (south).[9][10]

This 162 km (101 mi) long section is also the most difficult section to build, as it crosses the Carpathians, with an estimated construction cost of over €2 billion.[11] The contract for the feasibility study and the technical project of this section of the motorway was signed in May 2020,[12] but the inability of Search Corporation (with whom the contract was signed) to cover the costs of geotechnical studies resulted in a termination of the contract in June 2022.[13]

See also[edit]

References[edit]

  • ^ "Studii de Fezabilitate Drum Expres Sibiu–Făgăraş" (in Romanian). Archived from the original on 30 December 2013. Retrieved 20 December 2013.
  • ^ "Trans-European Transport Networks - Priority Project 7". European Commission. Archived from the original on 7 January 2014. Retrieved 2 January 2014.
  • ^ "Guvernul a scos autostrada Sibiu-Piteşti de pe harta investiţiilor în infrastructură pe următorii cinci ani" (in Romanian). Retrieved 28 December 2013.
  • ^ "Când se face autostrada Sibiu – Brașov. Până în august se reface studiul de fezabilitate".
  • ^ a b "Cum avansează proiectul Autostrăzii Sibiu – Făgăraş" (in Romanian). adevarul.ro. 27 January 2022. Retrieved 30 January 2022.
  • ^ "Autostrada Sibiu - Făgăraș: Primul câștigător, asocierea Makyol - Yapi, pe tronsonul 4". Economica.net (in Romanian). 2023-05-05. Retrieved 2023-05-09.
  • ^ "Încă un lot atribuit aceluiași constructor din Turcia cu care s-au semnat deja primele două tronsoane" [Another lot assigned to the same constructor from Turkey with which the first two lots have already been signed]. hotnews.ro. 22 September 2023.
  • ^ Ivancea: CNAIR a ales pentru autostrada A13 Bacău-Brașov varianta cea mai scurtă, ieftină şi prietenoasă cu mediul
  • ^ Ivancea propune CNAIR două variante de traseu pentru autostrada A13 Bacău – Brașov
  • ^ Licitaţie atribuită pentru autostrada Braşov-Bacău
  • ^ CNAIR a semnat vineri contractul pentru studiul de fezabilitate și proiectul tehnic
  • ^ "Lovitură pentru A13! Search Corporation a cerut rezilierea contractului pentru proiectarea Autostrăzii Brașov-Bacău". Ziarul de Bacău (in Romanian). 2022-06-16. Retrieved 2022-07-24.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Sibiu–Bacău_Motorway&oldid=1224964605"

    Categories: 
    Proposed roads in Romania
    Motorways in Romania
    Hidden categories: 
    All articles with bare URLs for citations
    Articles with bare URLs for citations from March 2022
    Articles with PDF format bare URLs for citations
    CS1 Romanian-language sources (ro)
    Articles with short description
    Short description matches Wikidata
    Infobox road temporary tracking category 1
    Infobox road maps for Wikidata migration
    Infobox road instances in Romania
    Articles containing Romanian-language text
     



    This page was last edited on 21 May 2024, at 15:18 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki