Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Route  





2 History  



2.1  Construction  



2.1.1  Station works  









3 Services  





4 Future  





5 See also  





6 References  





7 External links  














Southern Sydney Freight Line






Svenska
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Southern Sydney Freight Line
New South Wales Metropolitan Rail Area with Sydney Freight network highlighted in black
Overview
OwnerAustralian Rail Track Corporation
Termini
  • Macarthur
  • Websitewww.ssfl.artc.com.au
    Service
    TypeFreight
    History
    Opened21 January 2013
    24 June 2012Sefton JunctiontoLeightonfield opened
    21 January 2013Leightonfield to Macarthur opened
    Technical
    Line length36 km (22 mi)
    Number of tracks1
    Map of the Southern Sydney Freight Line corridor
    Yellow: Route constructed as part of the SSFL project
    Green: Existing relief line incorporated into the project
    Grey: Existing Metropolitan Goods railway line

    The Southern Sydney Freight Line (SSFL) is a freight only railway line in the south-western suburbs of Sydney, Australia. The line was built to segregate freight trains from the Sydney Trains network. It forms part of a dedicated freight only corridor between Port Botany and Macarthur. The line is managed by the Australian Rail Track Corporation.

    Route[edit]

    The SSFL runs from ChulloratoMacarthur. It is an unelectrified, bi-directional single track with 1,800 metre long passing loops at Leightonfield and Glenfield.[1] Apart from its end points, the SSFL has no interface with the Transport Asset Holding Entity network.

    The line commences at Chullora connecting with the Metropolitan Goods line from Port Botany, passing beneath the Bankstown line from where it parallels the Main South line. Just to the north of Glenfield, the line crosses to the west of the Main South line via a flyover. It joins the Main South line to the south of Macarthur station.[2]

    History[edit]

    Minto station looking north in December 2012 during the final stages of construction
    APacific National train on the line passing through Sefton

    Delays to freight services operating to and from Sydney via the Main South line had long been a problem, but it wasn't until the formation of the National Rail Corporation that any plan was devised to resolve it.[3]

    In February 1992, the Federal Government allocated $71 million for the construction of a dedicated freight line from Chullora to Macarthur as part of the One Nation infrastructure project. It soon became apparent that to complete the project would cost in the region of $250 million. Instead the funding was used to complete a number of smaller projects, including building a 6.6 kilometre relief line between Glenfield and Ingleburn. This single, non-electrified line was used by both CountryLink passenger and freight services.[3]

    Construction[edit]

    In May 2006, the Australian Rail Track Corporation (ARTC) revived the project.[4][5] Approval was obtained in October 2008 and construction commenced in early 2009, focusing on the section between Sefton and Cabramatta.[1] By August 2009 construction was under way along the whole corridor. In November 2009, poor planning led to the ARTC suspending the project for 10 months while it relocated utilities.[6][7]

    In September 2010, the ARTC announced the resumption of the project.[8][9] On 24 June 2012, the Chullora to Leightonfield section opened allowing the connection from the BHP yard at the latter to the RailCorp network to be severed.[10][11] The rest of the line opened on 21 January 2013.[12][13]

    In 2019, a triangular junction to the Moorebank Intermodal Terminal opened.[14][15][16]

    Station works[edit]

    The construction of the new line required modifications to several stations along the route. Sefton, Warwick Farm, Casula and Minto received upgrades. A new concourse was constructed at Cabramatta and the footbridge was extended at Leumeah.[1]

    Services[edit]

    The line is normally only used by freight services, but during engineering possessions on the adjacent Transport Asset Holding Entity tracks, NSW TrainLink XPT services have travelled on it. Freight trains travelling to the Minto Intermodal Terminal continue to travel on Transport Asset Holding Entity tracks.

    Future[edit]

    A further passing loop between Cabramatta and Warwick Farm stations is scheduled to open in 2023.[17][18]

    See also[edit]

    References[edit]

    1. ^ a b c Tackling Congestion on the Sydney Rail Freight Network Archived 27 February 2012 at the Wayback Machine Minister for Infrastructure and Transport 5 February 2009
  • ^ Corridor Description Archived 16 February 2011 at the Wayback Machine Australian Rail Track Corporation
  • ^ a b The Glenfield - Ingleburn Passing Loop Project Railway Digest August 1994 Page 8
  • ^ Southern Sydney Freight Line Parsons Brinckerhoff April 2006
  • ^ Southern Sydney Freight Line Submissions Report Parsons Brinckerhoff August 2006
  • ^ Planning snags halt rail project Sydney Morning Herald 3 November 2009
  • ^ Southern Sydney Freight Line cost blowout[dead link] Rail Express 30 March 2011
  • ^ Southern Sydney Freight Line Back on Track Archived 18 February 2011 at the Wayback Machine Australian Rail Track Corporation 14 September 2010.
  • ^ "SSFL Program of Works" (PDF). ARTC. Archived from the original (PDF) on 25 April 2012. Retrieved 28 October 2011.
  • ^ SAFE Notice 2-1707[permanent dead link] Australian Rail Track Corporation June 2012
  • ^ Southern Sydney Freight Line and Metropolitan Freight Network Shared Rail Corridor Network Rules & Procedures Australian Rail Track Corporation 2 July 2012
  • ^ Jacob Saulwick (21 January 2013). "'We wanted to make sure we got it right': new rail line opens ... three years late". Sydney Morning Herald. Fairfax Media. Archived from the original on 23 January 2013. Retrieved 21 January 2013.
  • ^ New Line to Reduce Congestion on Sydney Rail Network Opens Archived 18 January 2015 at the Wayback Machine Australian Rail Track Corporation 21 January 2013
  • ^ Qube's Moorebank intermodal hub a major infrastructure boost ABC News 12 June 2015
  • ^ Moorebank construction finally begins Archived 16 June 2017 at the Wayback Machine Sky News Australia 6 April 2017
  • ^ Construction begins on Moorebank Logistics Park Archived 13 April 2017 at the Wayback Machine Minister for Infrastructure & Transport 6 April 2017
  • ^ Cabramatta Loop Project Australian Rail Track Corporation
  • ^ Botany duplication and Cabramatta loop approved Rail Express 13 August 2020
  • External links[edit]

    Media related to Southern Sydney Freight Line at Wikimedia Commons


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Southern_Sydney_Freight_Line&oldid=1214443032"

    Categories: 
    Railway lines in Sydney
    Railway lines opened in 2013
    Standard gauge railways in Australia
    2013 establishments in Australia
    Hidden categories: 
    Webarchive template wayback links
    All articles with dead external links
    Articles with dead external links from August 2020
    Articles with dead external links from March 2024
    Articles with permanently dead external links
    Use dmy dates from September 2015
    Use Australian English from September 2015
    All Wikipedia articles written in Australian English
    Pages with no gauge entered in Infobox rail line
    Commons category link from Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 19 March 2024, at 00:20 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki