Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 The incident  





2 Junction layout  



2.1  Infrastructure  





2.2  The collision point  







3 Rolling stock  





4 Investigation  





5 References  





6 External links  














Spa Road Junction rail crash







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 51°2924N 0°316W / 51.49000°N 0.05444°W / 51.49000; -0.05444
 

From Wikipedia, the free encyclopedia
 


Spa Road Junction rail crash
Class 411 unit 1602, which was involved in the crash, seen at Dover Priory in 2003
Spa Road Junction rail crash is located in London Borough of Southwark
Spa Road Junction rail crash

Details
Date8 January 1999
17:25
LocationSpa Road Junction
CountryEngland
LineSouth Eastern Main Line
OperatorConnex South Eastern
Thameslink
OwnerRailtrack
CauseSignal passed at danger caused by driver error
Statistics
Trains2
Passengers~300
Deaths0
Injured4
List of UK rail accidents by year

The Spa Road Junction rail crash was an accident on the British railway system which occurred during the peak evening rush hour of 8 January 1999 at Spa Road Junction in Bermondsey, in South East London.

The incident[edit]

On a dark and wet evening, a Connex South Eastern train from Dover PriorytoCharing Cross collided with a Thameslink train from BrightontoBedford causing derailment to both trains. The accident resulted in no fatalities and four injuries. The British Transport Police reported that eight passengers had been taken to hospital with minor bumps, bruises and whiplash but none were detained.[1] One of the uninjured passengers complained that the Train Operating Companies had failed to provide support after the crash. He was awarded compensation in a court case but commented "And there I believe the matter will rest until the next rail crash when we the long-suffering passengers should be aware that unless we are carted off to hospital we will have to fend for ourselves wherever we are dumped".[2]

Connex Rail admitted that its driver passed the signal at danger although the existing Automatic Warning System was working. Following this and other similar accidents Railtrack was given six months to develop a plan to roll out the new Train Protection & Warning System which would automatically apply the brakes if a train passed a red signal.[3]

The Thameslink train had been held at a danger (red) signal until the route was set for it to cross from the Brighton Main Line onto the London Bridge Up Loop Line,[4] and the signal then cleared. The Connex train, which was approaching from behind, passed a preliminary caution (double yellow) signal then a caution (yellow) signal and then a danger (red) signal. It continued for 283 metres (309 yards) past the red signal until the point where the two lines converged. It was travelling at an estimated speed of 39 mph (63 km/h) when it collided with the Thameslink train which was estimated to be travelling at around 31 mph (50 km/h). Both trains were derailed and damage was caused to most of the carriages.

Disruption was caused to other rail services, although trains continued to run past the accident site on the Cannon Street lines. The emergency services struggled to access the accident scene but eventually 282 people were evacuated from these two trains. Some 200 people from another train a short distance behind (Connex South Central service from London BridgetoGuildford train) were initially left unsupervised, and had to find their own way to evacuate themselves in the inclement weather. Some were evacuated via the disused Spa Road railway station buildings,[5] the former terminus of the South East & Chatham Railway. Trains were still running on the south eastern side, some 30 to 40 ft (9 to 12 m) away from passengers evacuating the Guildford bound train.

The driver of the Connex train had already passed a signal at danger without authority on a previous occasion, and was still under special supervision because of this. Following the accident, he was permanently removed from driving duties.

There was no history of previous Category A SPADs at this signal.

Junction layout[edit]

Spa Road Junction is a busy ladder-crossover, located a short distance south east of London Bridge station. It controls the crossing movements to and from London Bridge (High Level) station, and at the time of the collision in 1999 the line configuration was:[6]

Infrastructure[edit]

All signals in the vicinity of Spa Road junction are 4 aspect colour light signals. The signalling method is Track circuit Block, controlled by London Bridge signalling centre which is located nearby, adjacent to platform 16 at London Bridge station.

The collision point[edit]

The Thameslink train was approaching London Bridge from New Cross Gate on the Up Fast line of the Brighton Main Line, and had been signalled to cross on to the Up Passenger Loop of the South Eastern Main Line at Spa Road junction.[7] The Connex South Eastern train was approaching Spa Road from New Cross and had received the correct signalling sequence of a Preliminary Caution (two yellow aspect signal) and Caution (single yellow aspect signal) prior to L154 (the signal protecting the junction) being at Danger. However the driver did not respond to the signals and failed stop his train at the Danger signal, continuing until his train collided with the Thameslink train at the trailing points.

Rolling stock[edit]

The Thameslink train was an eight-coach train consisting of two Class 319 four-coach electric multiple units (EMUs).

The Connex South Eastern was also an eight-coach train consisting of a four-coach Class 411 (411602) EMU and a four-coach Class 423 EMU. The class 411 unit was repaired at Eastleigh Works and became the only class 411 EMU in Connex livery as a result.

Investigation[edit]

AWS "Sunflower" indicator showing caution

The Health and Safety Executive (HSE) concluded that the accident was caused by the Connex train passing a signal at danger (red). The HSE concluded that this was probably due to human error as no evidence of malfunction was found in any equipment tested.

The investigation of the accident found "deficiencies" in the training and experience of staff in dealing with emergency situations. The cause of the accident was concluded to be driver error due to poor staff training.

One anomaly was that the "Sunflower" display in the cab of the Connex train was showing the all-black "clear" indication (meaning that the last signal which had been passed was displaying a green aspect). However the HSE report concluded that the Automatic Warning System (AWS) on both trains was probably working correctly, and that the shock of the collision had caused the electro-mechanical indicator to change. In any case, even if the AWS had given a wrong indication this would not have absolved[8] the driver of the Connex train of his duty to observe and obey the signals.

The conclusion was that the Train Protection & Warning System might have stopped or at least slowed the Connex train down if it had been installed. The Railway Safety Regulations 1999 were introduced in the August, which stipulated that train protection must be implemented throughout the network by the end of 2003. The regulations stopped short of requiring Automatic Train Protection (ATP) to be installed.

References[edit]

  1. ^ "Rail service back to normal after crash". Aberdeen Evening Express - City Final. 9 January 1999. p. 6. Retrieved 22 January 2023. – via britishnewspaperarchive.co.uk (subscription required)
  • ^ Scott, David (13 August 1999). "Ignored in rail crash aftermath". Uckfield Courier. p. 11. Retrieved 22 January 2023. – via britishnewspaperarchive.co.uk (subscription required)
  • ^ "This could have avoided smash". Uckfield Courier. 13 August 1999. p. 11. Retrieved 22 January 2023. – via britishnewspaperarchive.co.uk (subscription required)
  • ^ Quail Map 5 – England South [page 3] Sept 2002 (Retrieved 26 December 2011)
  • ^ "London Transport - Tubes, trains, trams". Derelict London.
  • ^ Network Rail (April 2001). Southern Zone Sectional Appendix. Vol. Module SO. p. 1/35 SO130. (Retrieved 22 December 2011)
  • ^ Quail Map 5 – England South [page 3] Sept 2002 (Retrieved 22 December 2011)
  • ^ Drivers' Rule Book: "The automatic warning system (AWS) does not relieve you of your responsibility for observing signals and speed restrictions". GE/RT8000 Rule Book Module S3: Section 1 (PDF).
  • External links[edit]


    51°29′24N 0°3′16W / 51.49000°N 0.05444°W / 51.49000; -0.05444


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Spa_Road_Junction_rail_crash&oldid=1138881319"

    Categories: 
    Transport in the London Borough of Southwark
    Transport in the London Borough of Lewisham
    Railway accidents and incidents in London
    Railway accidents in 1999
    1999 in London
    Bermondsey
    Railway accidents involving a signal passed at danger
    Derailments in England
    Accidents and incidents involving Connex South Eastern
    Accidents and incidents involving Thameslink
    January 1999 events in the United Kingdom
    Train collisions in England
    Rail accidents caused by a driver's error
    Hidden categories: 
    Subscription required using via
    Pages containing links to subscription-only content
    CS1: long volume value
    Pages using gadget WikiMiniAtlas
    EngvarB from August 2014
    Use dmy dates from August 2014
    Coordinates on Wikidata
     



    This page was last edited on 12 February 2023, at 04:07 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki