Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Components  





2 History  



2.1  Phase One  





2.2  Phase Two  





2.3  Phase Three  







3 References  





4 External links  














Ballpark Village (St. Louis)







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 38°3726N 90°1133W / 38.6239°N 90.1926°W / 38.6239; -90.1926
 

From Wikipedia, the free encyclopedia
 

(Redirected from St. Louis Ballpark Village)

Cardinal fans at Ballpark Village after a game in 2021

Ballpark Village (BPV) is a dining and entertainment district in Downtown St. Louis, Missouri, owned by the investment group that controls the St. Louis Cardinals, the city's professional baseball team. Located on the 200 and 300 blocks of Clark Street, it sits across the street from and is meant to complement Busch Stadium, the team's home field, on the site of the demolished Busch Memorial Stadium.[1]

Proposed in the late 1990s, the development was executed in two phases by primary developer Cordish CompanyofBaltimore, Maryland. The first phase, opened before the start of the 2014 Major League Baseball season, is a $100 million, 150,000-square-foot (14,000 m2) facility that includes bars, restaurants — several with a view onto the field — events venues, 720 parking spaces, and the Cardinals Hall of Fame and Museum.[2] The second phase of the development, a $260 million, 700,000-square-foot expansion which included a luxury highrise apartment building, a ten-story office building, a boutique hotel, a fitness club, and numerous new restaurants and retail spaces, broke ground in late 2017 and was opened in stages, beginning in mid-2020.[3][4]

Components

[edit]

The venues offer more than 200 events annually, a complement to the 81 days of Cardinals home games.

History

[edit]

The Ballpark Village project was first proposed in the late 1990s, when the Cardinals’ owners began planning to replace the 1966 Busch Memorial Stadium with a new structure, dubbed Busch Stadium. But after the new stadium opened in 2006, Ballpark Village stalled and the site sat dormant. The project’s size and scope changed repeatedly over the years.[10]

Phase One

[edit]
Cardinals Hall of Fame ceremony in 2014

The Cardinals corporation asked for and received $49 million in tax breaks from the City of St. Louis to help build the $100 million first phase.[11]

Ground was officially broken on February 8, 2013, for the 150,000-square-foot (14,000 m2) first-phase of the project. A few days earlier, the Cardinals corporation released artist's illustrations of the planned venue. On February 14, the Cardinals announced plans to add the PBR Cowboy Bar to the entertainment area.[12][13] This part of the project moved along with little delay. On August 27, the final truss intended to hold the retractable roof was laid into place.[14] On September 18, chief operations officer Jim Watry announced plans for more than 1,000 jobs.[15] The Cardinals Museum and Cardinal Nation Restaurant and Budweiser Brew House have rooftop seating similar to that found outside Chicago's Wrigley Field.[16]

The St. Louis Cardinals announced the addition of three tenants to BPV on November 14, 2013, including The Drunken Fish (asushi restaurant), Howl at the Moon (a piano bar), and Ted Drewes Frozen Custard.

The grand opening was March 27, 2014.[17][18]

Phase Two

[edit]
Phase Two buildings seen from Busch Stadium in 2021

On October 25, 2016, the Cardinals announced the second phase of Ballpark Village, scheduled to begin construction in late 2017 and be completed 18 months later, pending governmental and funding approval. The $260 million plan includes a 29-story residential tower, a 10-story office building, an 8-story Live! by Loews hotel, and a 3-story retail building with shops, restaurants, Onelife Fitness, and more amenities.[19][20] The total amount of space in this phase will be 100,000 square feet (9,300 m2) of office space, 10,000 square feet (930 m2) of entertainment, 50,000 square feet (4,600 m2) of retail, and 340,000 square feet (32,000 m2) of residential. Ground was officially broken on December 14, 2017.

On November 30, 2016, a committee within the St. Louis Board of Aldermen approved a plan to give the Cardinals corporation $16 million in tax breaks for the second phase.[11]

Construction of the $260 million second phase officially began on December 14, 2017 and began opening in June 2020.[4][21]

Phase Three

[edit]

On November 3, 2021, the Cardinals and Cordish announced the start of Phase 3, which is projected to develop the remaining land in the area within three to six years. Cardinals President Bill Dewitt III said the work would focus on residential use, thanks to the success of earlier such efforts.[22][23]

References

[edit]
  1. ^ a b c d e "Busch Stadium Ballpark Village Information". cardinals.com. Retrieved May 25, 2013.
  • ^ "Featured Developments". The Cordish Company. Retrieved August 20, 2008.
  • ^ Feldt, Brian (14 December 2017). "Cardinals break ground on second phase of Ballpark Village, announce PwC as anchor". St. Louis Business Journal.
  • ^ a b Hicks, Ahmad (17 June 2020). "Baseball may not be back, but Ballpark Village is with a new look". KSDK.com.
  • ^ "Cardinals Establish Hall of Fame & Detail Induction Process". MLB.com. January 18, 2014.
  • ^ Cardinals Press Release (January 18, 2014). "Cardinals establish Hall of Fame & detail induction process". www.stlouis.cardinals.mlb.com. Retrieved January 29, 2014.
  • ^ Logan, Tim (June 27, 2012). "Bud-themed restaurant announced as Ballpark Village's first tenant". St. Louis Post-Dispatch. Retrieved May 25, 2013.
  • ^ Figueras, Ligaya (February 21, 2013). "The Scoop: Food at Ballpark Village looks to be more than peanuts and Cracker Jacks". Sauce Magazine. Retrieved May 25, 2013.
  • ^ Held, Kevin (February 14, 2013). "A cowboy bar coming to Ballpark Village". ksdk.com. Retrieved May 25, 2013.
  • ^ Brown, Lisa. "Ground finally broken on Ballpark Village". stltoday.com. Retrieved 2019-03-04.
  • ^ a b Addo, Koran. "Aldermen push second phase of Ballpark Village forward". stltoday.com. Retrieved 2019-03-04.
  • ^ Logan, Tim (February 8, 2013). "Cardinals executives, developer finally break ground on Ballpark Village". St. Louis Post-Dispatch.
  • ^ Kurtovic, Amir (February 14, 2013). "Ballpark Village will get a cowboy bar". St. Louis Business Journal.
  • ^ Bierman, Scott (August 27, 2013). "Final structural beam in place at Ballpark Village". KMOV.com. Retrieved October 14, 2013.
  • ^ Bernthal, Jim (September 17, 2013). "Ballpark Village is hiring". Fox2Now St. Louis. Retrieved October 14, 2013.
  • ^ Rogers, Phil (October 11, 2013). "Ballpark Village rising into view at Busch Stadium". MLB.com. Retrieved October 14, 2013.
  • ^ "First phase of Ballpark Village opens". MLB.com. March 27, 2014.
  • ^ "Finally! Ballpark Village announces its grand opening lineup". St. Louis Post-Dispatch. March 6, 2014.
  • ^ Barr, Diana. "Cardinals propose $260 million Ballpark Village expansion". St. Louis Business Journal. Retrieved October 25, 2016.
  • ^ Barker, Jacob. "Ballpark Village expansion breaks ground, accounting firm PwC named anchor office tenant". stltoday.com. Retrieved December 14, 2017.
  • ^ "Phase 2 of Ballpark Village". St. Louis Cardinals. Retrieved December 14, 2017.
  • ^ Rubbelke, Nathan (1 November 2021). "Cardinals President Bill DeWitt III offers details on the next phase of Ballpark Village, explains the club's manager change". ksdk. Retrieved 3 March 2023.
  • ^ Reichard, Kevin (2 November 2021). "Ballpark village development enters the third phase". ballparkdigest.com. Retrieved 3 March 2023.
  • [edit]

    38°37′26N 90°11′33W / 38.6239°N 90.1926°W / 38.6239; -90.1926


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Ballpark_Village_(St._Louis)&oldid=1211844749"

    Categories: 
    2020 establishments in Missouri
    Buildings and structures in St. Louis
    Downtown St. Louis
    The Cordish Companies
    Buildings and structures completed in 2020
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Coordinates on Wikidata
     



    This page was last edited on 4 March 2024, at 19:51 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki