Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Before the Stafford and Uttoxeter Railway  





2 Authorisation and construction  





3 Operation  





4 Hopton Bank derailment, 1873  





5 Great Northern Railway  





6 Uttoxeter developments  





7 Twentieth century  





8 Decline and closure  





9 Stations  





10 Locations  





11 Notes  





12 References  





13 External links  














Stafford and Uttoxeter Railway







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


  • t
  • e
  • Stafford and
    Uttoxeter Railway

    Uttoxeter

    Bromshall Tunnel

    Grindley

    Chartley

    Ingestre and Weston

    Salt and Sandon

    Stafford Common

    Stafford

    The Stafford and Uttoxeter Railway was authorised by Act of Parliament on 29 July 1862,[1] to build a line between the towns of Stafford and UttoxeterinStaffordshire, England. It opened for traffic in 1867. It opened on 23 December 1867. Construction cost had much exceeded estimates, and income was poor, so that the company was always in financial difficulty. It was placed in receivership in 1875. The Great Northern Railway (GNR) had running powers to Uttoxeter and was persuaded to acquire the company, which it did in 1881. The GNR spent a considerable sum on improving the line, but it never made money and it was closed to passengers on 4 December 1939. Goods traffic ceased in 1951, except for a short stub to RAF Stafford; this too closed in 1975.

    Before the Stafford and Uttoxeter Railway[edit]

    The Stafford & Uttoxeter Railway system in 1867

    Prior to the establishment of railways, Stafford was an important manufacturing town; especially dominant was the footwear industry, supported by ancillary manufactures; in addition salt was extracted, and to a lesser extent gypsum. Later a number of heavy engineering works were established in the town The intervening land between Stafford and Uttoxeter was high quality grazing land, devoted to cattle farming. Uttoxeter itself had numerous smaller-scale manufacturing activities, but later became the home of J C Bamford, a large-scale maker of, at first, agricultural machinery, and later construction and excavating machines.[2]

    On 4 July 1837 the Grand Junction Railway opened, forming a north–south trunk link through Stafford. The London and North Western Railway (LNWR) was formed on 16 July 1846, consolidating the GJR with other trunk lines, connecting London and Manchester and Liverpool.[3] The North Staffordshire Railway (NSR) was incorporated in 1845, its scope being amplified in 1846. It was a compact and dense system centred on Stoke-on-Trent.[4] In 1848 the line between Stoke-on-Trent and Uttoxeter and on to Burton upon Trent was opened, and in the following year the line from Macclesfield was opened. The two lines converged at Uttoxeter Junction station.[5] Thus Stafford and Uttoxeter were well served by railway connections. Proposals began to be put forward for an east–west line across the intervening agricultural terrain, and after a number of unfulfilled projects, ideas for a Stafford and Uttoxeter Railway began to take shape. In support of the line were the interests of the growing shoe-making industry in Stafford and the Leighton Ironworks in Uttoxeter, of the Bamford family.[2]

    Authorisation and construction[edit]

    A public meeting took place in Stafford on 31 March 1862 to confirm interest in a railway connecting Stafford and Uttoxeter; general approval was expressed, and it was resolved to progress the proposal.[note 1][6] A Parliamentary Bill went forward to the 1862 session. Support had come initially from the Shropshire Union Railway, for transport of cattle from Wales, but when the SUR was taken over by the LNWR this was withdrawn. The line was fiercely opposed by the LNWR and the NSR, and the Parliamentary process was difficult. However the Royal Assent was given to the Stafford and Uttoxeter Railway Act for the formation of the company on 29 July 1862.[1][7][6] The line was to be single track, 12+12 miles long, from Bromshall Junction,[note 2] on the North Staffordshire Railway near Uttoxeter, to Stafford. At Bromshall Junction there were to be running powers over the NSR into Uttoxeter. The Engineer was Thomas Charles Townsend.[8] The authorisation included a spur connection to the NSR near Weston-on-Trent, but this was never built.[note 3] William Field was appointed as contractor for the construction, which was put in hand almost immediately.[8] However construction of the considerable earthworks and a tunnel pushed the cost of the works above the engineering estimate, in addition to high land acquisition costs. In 1865 the company had to return to Parliament for authorisation of additional share capital to the extent of a further £50,000.[9] Colonel Yolland of the Board of Trade inspected the line on 23 May 1867, but found a number of deficiencies. Chief among these were the quality of the rail chairs, which he considered were too light; in addition holding-down bolts for longitudinal timbers on underbridges were to be improved. The method of working the line was not yet settled, and Yolland seems to have been irritated by this, making the unusual stipulation that tank locomotives must not be run bunker first on the line. A second platform was to be provided at Salt station.[10] A reinspection took place on 25 September 1867 under Lt Col Hutchinson, and although not every detail had been rectified, he approved the opening of the line.[10] The earthworks and bridges were constructed for double track, but single track was laid, and the tunnel was single. There were some stiff climbs, including one of over two miles at 1 in 70.[11] Evidently arrangements to work the line had not been concluded, and both the LNWR and the NSR had declined to work the line and the S&YR had no locomotives of its own. Accordingly, there was a delay while working arrangements were negotiated.[12]

    Operation[edit]

    The line opened for general traffic on 23 December 1867.[13][1] The Company owned seven coaches, sixteen wagons and one goods van but, initially, no locomotive. Motive power line was probably provided by the contractor for the construction, who had become major shareholders in the company.[note 4] Instead of employing booking office staff, the Company issued tickets on the train, and there was little in the way of telegraphic or signalling equipment. The first locomotive owned by the company was a 2-4-0 tank engine supplied in 1868 by Beyer, Peacock and Company and was named Shrewsbury and Talbot.[note 5] A second locomotive, named Ingestre, was acquired second-hand in May 1873; It was a Beyer Peacock 0-4-2T. The purchase was probably prompted by the accident at Hopton Tunnel, in which Shrewsbury and Talbot was damaged.[12] By 1874, Stafford had expanded northwards and a new station was built at Stafford Common, where there were horseracing, fairs and agricultural shows.[14] The line was never productive of much traffic and was not kept in very good order. In the summer of 1875 the Board of Trade sent Colonel Rich to report on its condition, and he required certain improvements to ensure safety. Losses, and debts, mounted, and a receiver was appointed in 1875.[11] Operationally, there was continuing opposition from the London and North Western Railway (LNWR) and the North Staffordshire Railway (NSR). There were disputes over the maintenance of train connections at the junction stations, and over the handling of goods traffic. By 1878 it was clear that operating costs were exceeding traffic receipts and a receiver was appointed. The suggestion was made that, since it seemed likely that the LNWR and the NSR would continue to be uncooperative, approaches should be made to the Great Northern Railway or the Midland. The aim of connecting to Derby had still not been achieved. While the LNWR and NSR were on good terms with the Midland Railway and exercised running powers over its lines into Derby and Burton, the GNR had built a new line in competition with all three – its Derbyshire extension – and was anxious to penetrate further westward—to Wales if possible.[15]

    Hopton Bank derailment, 1873[edit]

    In 1873 there was a derailment at Hopton Bank. (The location was spelt Hoopton in contemporary reports.) On 1 February 1873 the 12:10 train from Uttoxeter to Stafford derailed "at high speed" about two miles before reaching Stafford. The driver and fireman were killed, and eight other persons were injured. The derailment took place on a right hand curve of 40 to 60 chains radius, and on a falling gradient of 1 in 70. There were some defects in the leaf springs of the locomotive, but these were not considered to be contributory. The main cause was stated to be excessive speed, associated with reaching Stafford to make a connection with a main line train there. The driver had previously been warned several times about excessive speed. Frost heave may have affected the stability of the track.[16]

    Great Northern Railway[edit]

    The Stafford & Uttoxeter Railway system in 1881

    For three years the S&UR company had been in receivership; its income was only £12 per mile per week. In 1878 a representative of the major creditor approached the Great Northern Railway, proposing that they should take over the working of the line. In that year the GNR opened its Derbyshire and Staffordshire Extension Line from Nottingham and Derby to Egginton Junction, on the North Staffordshire Railway Churnet Valley Extension line. The GNR had expressed an interest in reaching Holyhead, and the S&UR might be a stepping stone in that direction.[11]

    Stafford and Uttoxeter Railway Act 1879
    Act of Parliament
    Long titleAn Act to confer further powers on the Stafford and Uttoxeter Railway Company; and for other purposes.
    Citation42 & 43 Vict. c. cciii
    Dates
    Royal assent11 August 1879
    Text of statute as originally enacted

    The GNR declined the approach, but in fact negotiations continued regarding an outright purchase. The GNR were given running powers over the Stafford and Uttoxeter Railway by Act of 11 August 1879, and into Stafford station.[11] Further negotiations took place, and notwithstanding the poor state of the S&UR infrastructure, a price of £100,000 was agreed: the purchase was authorised by Act of 18 July 1881, effective from 1 August. Plant was transferred at a valuation of £1,450, which included two locomotives.[11][17] If the GNR's interest in reaching Holyhead was definite, it was never realised, and in fact Stafford remained the westernmost outpost of the GNR.[15] Wrottesley is frank about the dubious value the GNR got for its outlays:

    Not very willingly, the GN came into possession of the Stafford & Uttoxeter. Other than as a possible western outlet for Derbyshire coal, the line offered little prospect of much revenue.[11]

    The advantage to the GNR was mitigated by a clause interested the Act authorising the purchase, which prevented the GNR using the running powers over the NSR to divert traffic by any circuitous routes from the lines of the LNWR or North Staffordshire Companies.[15] At the time of the transfer to the GNR takeover, the line was completely run down, and the GNR invested £40,000 in improving the facilities at Stafford Common, providing passing loops at Ingestre and Chartley, and later on at Grindley. Block signalling was installed. The GNR operated a through passenger service from Grantham via Nottingham and Derby to Stafford, and about the end of the nineteenth century Boston enginemen worked a lodging turn to Stoke.[11] The S&UR passenger train service had consisted of four trains daily, five on Saturdays, none on Sundays, between Stafford and Uttoxeter Junction. From November 1881 the GNR integrated these trains with its Derby services, and six trains ran daily, one on Sundays, throughout from Stafford to Derby. From 1900 to 1916 these were extended eastward to Grantham.[18] There was a stationmaster and a staff of eleven at Stafford LNWR[note 6] until 1915, and Stafford Common had its own stationmaster.[15] The Great Northern Railway set about considering what needed to be done to put its newly acquired line to rights. The goods station facilities available to the GNR at Stafford were poor, and a new, more central goods depot was planned, to the north of the River Sow on a short branch line. It was authorised in the 1883 Parliamentary session, and was called Doxey Road goods station. The gas works was later (in 1891) connected to the same branch line; the LNWR was allowed to access the gas works over the branch.[19] The line from Stafford Common into Stafford itself was doubled in 1882.[20] In 1892 large salt deposits were discovered at Stafford Common, and this brought considerable mineral traffic to the line.[21]

    Uttoxeter developments[edit]

    The original layout at Uttoxeter had consisted of a southward junction where the Churnet Valley line and the Stoke to Derby line converged; there was a junction station there, but it was an exchange passenger station only with no public access. There were two ordinary stations, Dove Bank (to the north, on the Churnet Valley line) and Bridge Street to the east, towards Bromshall. Now in 1881 the North Staffordshire Railway provided a new west-to-north double track curve, completing a triangle. A new Uttoxeter station was provided at the western apex of the triangle, and the other stations were closed.[18]

    Twentieth century[edit]

    During the First World War cutbacks were made to passenger services and facilities. However, there was considerable freight movement westwards from the armament factories at Branston Depot and Chilwell Ordnance Depot. Royal Engineers personnel who had been trained at Longmoor Military Railway were drafted in to work parts of the line. In 1919 plans to extend the railway (particularly at Stafford Common) were announced but they were not proceeded with after the announcement of the Railways Act 1921. In 1923, the Grouping of the Railways of Great Britain took place pursuant to the Railways Act 1921, and the Great Northern Railway, owner of the S&UR line, was a constituent of the new London and North Eastern Railway. Through the 1920s and early 1930, some enhancement to passenger receipts took place because of the popularity of inward excursions to places such as the village of Salt, and through traffic to the racecourses at Uttoxeter and Doncaster, and to East Coast seaside destinations.

    Decline and closure[edit]

    In 1938, a public bus service was introduced (by the Green Bus Company) between Stafford and Uttoxeter, leading to a fall in railway passenger numbers.[22] With the outbreak of World War II, passenger services were reduced to one return train a day from 2 October 1939, and on 4 December 1939, all civilian passenger services were suspended, as a means of dealing with staff shortages resulting from enlistment.[22] Special trains ran to RAF Stafford, near Stafford Common station, and to a Royal Ordnance FactoryatBromshall.[13][23] After the war, civilian passenger and freight services briefly resumed. In 1949 the line became part of British Railways|[note 7] on the nationalisation of the British railway network. On 5 March 1951 the line was closed to all through services except military traffic using the extensive sidings at RAF Stafford, and to Stafford Common goods yard.[13][24] Stafford Common goods yard closed in August 1968. On 28 November 1975 the final movement from RAF Stafford took place, and the line was now closed completely.[24] A special train organised by the Stephenson Locomotive Society became the last train to travel the entire route, on 23 March 1957, except that Bramshall Junction had been removed. The train returned from just short of the junction to Stafford.[13][24] Track from Hopton and Uttoxeter was lifted between 1957 and 1962. The railway bridge over the Trent and Mersey CanalatWeston was eventually removed in the 1990s; it had been used by a local farm to let dairy cattle cross the canal. There is now no railway use of the former line.

    Stations[edit]

    Station Name Co-ordinates
    Stafford 52°48′13N 2°07′23W / 52.80359°N 2.12307°W / 52.80359; -2.12307[25]
    Stafford Common 52°49′17N 2°07′01W / 52.8214°N 2.1169°W / 52.8214; -2.1169[25]
    Salt and Sandon 52°50′50N 2°03′55W / 52.8472°N 2.0654°W / 52.8472; -2.0654[25]
    Ingestre 52°50′15N 2°02′05W / 52.8375°N 2.0348°W / 52.8375; -2.0348[25]
    Chartley 52°50′47N 1°59′41W / 52.8465°N 1.9948°W / 52.8465; -1.9948[25]
    Grindley 52°51′38N 1°56′41W / 52.8605°N 1.9447°W / 52.8605; -1.9447[25]
    Uttoxeter 52°53′48N 1°51′27W / 52.8968°N 1.8575°W / 52.8968; -1.8575[25]

    Locations[edit]

    Notes[edit]

    1. ^ Baker and Miller imply (page 27) that this was a meeting to gauge interest in forming a company; but the Bill went to the 1862 session, and the project details must have been prepared at least a year previously
  • ^ The railway always referred to the locality as Bromshall. In medieval times that spelling was used locally, but in recent times the spelling Bramshall is used in the community.
  • ^ The earthworks for the spur were made, but track was never laid. The earthworks are no longer discernible in satellite imagery. Christiansen and Miller say (page 152) that this was an almost two mile branch forming a north to east spur, but this is a mistake. It was a short south-to-east spur.
  • ^ Shares and debenture debt had been allocated to the Contractor in lieu of cash payment, due to the Company’s desperate financial situation.
  • ^ The name refers to the manorial title of Charles Chetwynd-Talbot, the 19th Earl of Shrewsbury and 4th Earl Talbot.
  • ^ It is likely that many of the staff were employed at the goods depot.
  • ^ At first in the Eastern Region as a 2penetrating line” but after a year transferred to the London Midland Region.
  • ^ The local community is named Bramshall, but the railway used the name Bromshall for the junction and the tunnel.
  • References[edit]

    1. ^ a b c Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, ISBN 978 1785893 537, pages 532 and 533
  • ^ a b Allan C Baker and Mike G Fell, The Stafford and Uttoxeter Railway, Lightmoor Press, Lydney, 2014, ISBN 9781 899889 90 7, pages 9 and 10
  • ^ Wilfred L Steele, The History of the London and North-Western Railway, Railway and Travel Monthly, London, 1914, pages 91 and 132
  • ^ Rex Christiansen and R W Miller, The North Staffordshire Railway, David & Charles, Newton Abbot, 1971, ISBN o 7153 5121 4, pages 26 and 30
  • ^ Christiansen and Miller, pages 45 and 46
  • ^ a b Baker and Fell, pages 26 and 27
  • ^ Christopher Awdry, Encyclopaedia of British Railway Companies, Patrick Stephens Limited, Wellingborough, 1990, ISBN 1-85260-049-7, page 162
  • ^ a b Baker and Fell, page 36
  • ^ Baker and Fell, page 95
  • ^ a b Baker and Fell, pages 39 and 40
  • ^ a b c d e f g John Wrottesley, The Great Northern Railway: volume II: Expansion and Competition, B T Batsford, 1979, ISBN 0 7134 1592 4, pages 103 to 106
  • ^ a b Baker and Fell, page 81
  • ^ a b c d Christiansen and Miller, pages 269 and 270
  • ^ Baker and Fell, page 91
  • ^ a b c d Christiansen and Miller, pages 151 to 153
  • ^ H W Tyler, Board of Trade, "Stafford and Uttoxeter Railway", 1873, at Railways Archive https://www.railwaysarchive.co.uk/eventsummary.php?eventID=3637
  • ^ Charles H Grinling, The Great Northern Railway, 1845 – 1895, Methuen & Co, London, 1898, pages 344 and 345
  • ^ a b Baker and Fell, pages 134 and 135
  • ^ Baker and Fell, page 119
  • ^ Baker and Fell, page 124
  • ^ Baker and Fell, page 127
  • ^ a b Baker and Fell, page 175
  • ^ Baker and Fell, page 179
  • ^ a b c Baker and Fell, pages 187 to 191
  • ^ a b c d e f g Ordnance Survey (1902). "1902 Map of Staffordshire". Retrieved 18 February 2020.
  • External links[edit]

    Historic Photographs along the line

    Railway junctions around Stafford

    Retrieved from "https://en.wikipedia.org/w/index.php?title=Stafford_and_Uttoxeter_Railway&oldid=1194909774"

    Categories: 
    Closed railway lines in the West Midlands (region)
    Great Northern Railway (Great Britain)
    Rail transport in Staffordshire
    Railway companies established in 1862
    Railway lines opened in 1867
    Railway companies disestablished in 1881
    Railway lines closed in 1951
    1862 establishments in England
    British companies disestablished in 1881
    British companies established in 1862
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from March 2017
    Use British English from March 2017
    Lists of coordinates
    Geographic coordinate lists
    Articles with Geo
    Pages using gadget WikiMiniAtlas
     



    This page was last edited on 11 January 2024, at 10:33 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki