Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Proposals and construction  





2 Opening  





3 Under the Midland Railway  





4 Decline  





5 Stations  





6 Current use  





7 Topography  



7.1  Station list: Nailsworth line  





7.2  Stroud branch  







8 References  





9 External links  














Stonehouse and Nailsworth Railway







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


The Stonehouse and Nailsworth Railway was a short railway line in the county of Gloucestershire, England. It was promoted independently to connect the industrial town of Nailsworth to the main line railway network at Stonehouse. It opened in 1867, but was immediately in financial difficulty, due largely to debenture interest payments and other financial commitments from the construction.

The Midland Railway purchased the line in 1868. They later decided to build a short branch line from DudbridgetoStroud, and that opened in 1885.

The passenger service was suspended in 1947 as a response to the post-war national fuel emergency, but the suspension was shortly made a permanent closure. The local goods service continued until 1966 from which time the line was completely closed.

Proposals and construction[edit]

The Nailsworth and Stroud branches

The Stroudwater Navigation was opened in 1779, bringing cheap transportation to Stroud for imports, especially coal and agricultural requirements, and exports of the manufactures of the district. The Thames and Severn Canal followed in 1789, offering a direct connection to London.

The Bristol and Gloucester Railway opened its main line in 1844, passing to the west of Nailsworth and Stroud, and the Great Western Railway opened its line through Stroud in 1845, bringing further benefits. However it was observed that Nailsworth, being somewhat further from the line, suffered a disadvantage compared with its rival town of Stroud.

In 1862 it was proposed to build a branch railway from Stonehouse on the former Bristol and Gloucester Railway line to Nailsworth. The B&GR had now passed into the possession of the Midland Railway. Sufficient support seemed to be forthcoming, and a Parliamentary Bill went to the 1863 session of Parliament. With little opposition, the Bill was passed on 13 July 1863. Authorised capital was £66,000.[1][2][3]

A contract was let for the construction to Watson, Overend & Company, and the first sod was cut on 22 February 1864. The Stroud Journal, in reporting the first sod ceremony, asserted that "it is well understood to be the first step of an extension on through Tetbury, Malmesbury and Chippenham".[4] The support for the line locally was indicated by the fact that the capital for the construction was soon raised, although a heavy commitment in debentures was taken.

Following an easy river valley course, the line was quickly completed, and the necessary Board of Trade inspection took place, in order to obtain permission for passenger operation. Colonel Yolland made the necessary visit in December 1866 but he declined to recommend opening to passengers, chiefly on the ground of there being only one turntable on the line. At the time the Board of Trade policy was to prohibit the running of tender engines tender-first, so requiring a turntable at each end of a line. There seems to have been some failure of communication, for an anguished remark was made that tank engine operation was intended, which seems to have resulted in belated approval.

Opening[edit]

Accordingly the line opened for goods trains on 1 February 1867 and passenger trains started running on 4 February 1867.[1][5][6][2]

The line was loss-making from the start; seeing little other means of escaping the difficulty, on 6 November 1867 the Company asked the Midland Railway if they would take over the line, but the Midland refused. As well as debenture interest of £450 in the first half year, the Company was under pressure from landowners whose land had been taken, but who had not received the agreed purchase price. Moreover the Stroudwater Canal claimed £1,060: an intersection bridge to the west of Ryeford had been built without being compliant with requirements of the Act, and the canal company was able to show that it had suffered loss. A receiver was appointed, and the Midland Railway fed in financial support in order to keep the Nailsworth Company going.

Absorption was the only way out of the situation, and the Midland Railway did not wish to see the line closed; meanwhile the shareholders of the Nailsworth Company had become more realistic in their expectations, and terms were agreed that 3% would be guaranteed to ordinary shareholders (whose holdings amounted to £40,940). The transfer of ownership was authorised on 17 June 1868. The Stroud and Nailsworth Railway company was now a financial shell only, until it was dissolved, in 1886.

Under the Midland Railway[edit]

The Stroud branch had been authorised in the original Act of Parliament, but had been considered a lower priority. Now there was pressure in Stroud to build it. Although they had a railway connection, the GWR line, they wished to have access to Nailsworth for their own manufactures. The original authorisation had expired, so the Midland in responding to the pressure, obtained a new Act on 6 August 1880 for the purpose.[1][2]

The lowest tender for the actual construction was £37,198 for 1+14 miles; the earthworks were formidable.

Colonel Rich of the Board of Trade carried out the inspection that was necessary for passenger operation in March 1886, and was satisfied. The line opened for goods operation on 16 November 1885, and passenger trains started running on 1 July 1886.[1][5][6][2]

Decline[edit]

Bus competition started to operate, under the company Jeffrey and Company of Nailsworth, from April 1908.

The line was closed to passenger trains on 16 June 1947 as a temporary measure in response to the post-war fuel emergency, but it never resumed, and the passenger operation was formally discontinued on 8 June 1949.

The line closed completely on 1 June 1966.[1][5][2]

Stations[edit]

The station at Stonehouse (Bristol Road) station was separated from the main line station there; the two sections were connected by a covered walkway.[7] The intermediate stations were at Ryeford, Dudbridge and Woodchester, all except Woodchester had stone buildings on a large scale.

Dudbridge was originally advertised as "Dudbridge for Stroud", as Stroud was only 1 mile (1.6 km) or so away. In 1885 the Midland Railway opened its Stroud branch, to goods trains only at first; the Stroud station was sometimes known as Stroud Cheapside and Stroud Wallbridge.[8] Passenger services began the following year, 1886, and connected to the main branch line services at Dudbridge.

Current use[edit]

Much of the line, including the 3 miles (4.8 km) section from Dudbridge to Nailsworth, is now in use as a cycle path, a section of National Cycle Route 45 from SalisburytoChester.

Topography[edit]

  • t
  • e
  • Stonehouse &
    Nailsworth Railway

    Stonehouse (Bristol Road)

    Ryeford

    Dudbridge

    Stroud

    Woodchester

    Nailsworth

    Station list: Nailsworth line[edit]

    Stroud branch[edit]

    References[edit]

    1. ^ a b c d e Colin G Maggs, The Nailsworth and Stroud Branch, Oakwood Press, Usk, 2000, ISBN 0 85361 559 4
  • ^ a b c d e Colin G Maggs, Gloucestershire Railways, Halsgrove Publishers, Wellington, 2010, ISBN 978 1 84114 913 4
  • ^ E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  • ^ Stroud Journal, 27 February 1864, quoted in Maggs
  • ^ a b c Rex Christiansen, A Regional History of the Railways of Great Britain: volume 13: Thames and Severn, David & Charles, Newton Abbot, 1981, ISBN 0 7153 8004 4
  • ^ a b Colin G Maggs, The Bristol and Gloucester Railway and the Avon and Gloucestershire Railway, The Oakwood Press, Headington, second edition 1992, ISBN 0 85361 435 0
  • ^ Mike Oakley, Gloucestershire Railway Stations, Dovecote Press, Wimborne, 2003, ISBN 1-904349-24-2, pages 125 and 126
  • ^ Oakley, page 129
  • ^ M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Stonehouse_and_Nailsworth_Railway&oldid=1132460088"

    Categories: 
    Midland Railway
    Closed railway lines in South West England
    Rail transport in Gloucestershire
    Railway lines opened in 1867
    Railway lines closed in 1966
    Stroud District
    Nailsworth
    Rail trails in England
    Hidden categories: 
    Use dmy dates from July 2015
    Use British English from July 2015
     



    This page was last edited on 9 January 2023, at 00:22 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki